Ground slab Vienna what goes in stays in.

Ground slab Vienna: from the contractor that does the work — not from a broker.

Ground slab Vienna: a ground slab in Vienna costs €110 to €520 per square metre. Unreinforced €110–190/m², reinforced with insulation €180–380/m², as a watertight concrete tank (weiße Wanne) €280–520/m². The build-up underneath accounts for more than half of the cost.

A ground slab in Vienna costs €110 to €520 per square metre, depending on the design. An insulated 110 m² slab with a frost skirt comes to around €48,700 net. More than half of that is not in the concrete but in the build-up beneath it: hardcore sub-base, blinding layer, damp-proofing, insulation and frost skirt. Then there is the finality: drainage pipes, empty conduits and the earth electrode are cast into the slab. Anyone who forgets a pipe can only add it later by breaking out the floor in the finished living space.
◆We are the construction company doing the work ◆Fixed price under ÖNORM◆Our own construction team◆€3 million liability insurance◆Based in Vienna 1210


What a ground slab costs in Vienna

Guide prices net, as of 2026, binding once the geotechnical survey and structural design are available.

ExecutionWhat forPrice netThickness
Unreinforced slabGarden house, outbuilding, carport110–190 €/m²15–20 cm
Reinforced slab, uninsulatedGarage, workshop, storage150–260 €/m²20–25 cm
Reinforced slab with insulationheated residential building180–380 €/m²25–35 cm with frost skirt
Foundation slab, watertight concrete tank (weiße Wanne)with a high water table280–520 €/m²30–45 cm, watertight (WU) concrete
Slab above an underground car park or basementdesigned as a load-bearing floor slab220–420 €/m²according to structural calculations
Ground slab Vienna: costs 2026 – net price overview
Ground slab Vienna: the prices from the table at a glance, as of 2026, net.

The build-up from bottom to top

LayerThicknessPrice netFunction
Load-bearing subsoil——tested, replaced if necessary
Frost protection layer (hardcore sub-base)20–40 cm18–38 €/m²capillary-breaking, compacted in layers
Blinding layer of lean concrete5–8 cm18–35 €/m²clean working surface
Damp-proofing against ground moisture—18–45 €/m²membrane or coating
Compression-resistant perimeter insulation12–20 cm28–65 €/m²XPS or foam glass, beneath the slab
PE sheet as separating layer—3–8 €/m²prevents water loss during concreting
Reinforcementaccording to structural calculations€4.50–9.00/kgmesh or bar steel, with spacers
Concrete20–35 cm180–320 €/m³grade according to structural design, compacted
Frost skirt at the edgeup to 80 cm deep€85–180/lin. mprevents frost attacking the slab edge
Worked example · 110 m² ground slab for a detached house, insulated, with frost skirt
Ground survey, structural design, excavation, hardcore€12,400
Blinding, damp-proofing, insulation, sheeting€11,900
Frost skirt 44 lin. m, formwork€7,600
Reinforcement, concrete, earth electrode, tests€16,800

Total around €48,700 net, which is €443/m². The slab alone would be considerably cheaper – the build-up beneath and around it accounts for more than half. And it is precisely this part that cannot be added afterwards.

For existing slabs with cracks, hollow areas or spalling, the issue is not a new build but repair: industrial floor repair.

Ground slab or basement

CriterionGround slabWith basement
Foundation costs180–380 €/m²an extra €350–700/m² of basement area
Usable floor areanone additionalusable space at the lowest price per m² in the house
Construction timeshorter2 to 4 months longer
With high groundwatersimplerwatertight concrete tank needed, considerably more expensive
Building servicesmust be planned into the slabaccessible in the basement
Later alterationspractically impossiblepossible at any time
The decisive difference is not the price but the finality. Drainage pipes, empty conduits and the earth electrode are cast into a ground slab – anyone who forgets a pipe can only add it afterwards by breaking out the floor in the finished living space. That is why all building services are planned and set out before concreting, not during the fit-out.

Ground slab Vienna from a single source

Ground slab Vienna is the building element on which everything else stands – for new builds, extensions, prefabricated houses and garages. Anyone who sells it as a "quickly poured concrete surface" is cutting corners precisely where nobody will look again later: compaction, damp-proofing, insulation, reinforcement and the services that are cast into the concrete. Skyline Bau plans every ground slab in clearly defined work stages: design by an authorised structural engineer (your own or an external partner we appoint), excavation and a hardcore sub-base compacted in layers, blinding layer, damp-proofing and insulation, inspection of the reinforcement before concreting, the concrete pour with curing, and photo documentation of every step for the client, planner, property management and insurer.

The most common reason for a ground slab in Vienna: a new detached house, an extension or a prefabricated house on your own plot. Here the slab is both the foundation and the ground-floor floor – its thickness, reinforcement and insulation follow from the loads of the house, the subsoil and the groundwater level. In existing buildings there is a second case: an old cellar floor of brick paving, clay or thin concrete is replaced by a new, damp-proofed basement slab.

If the subsoil lacks sufficient bearing capacity, the groundwater is high, or an old cellar has no continuous floor slab — all of which occur in Vienna —, then the work must be adapted accordingly: soil replacement, heavier reinforcement, a watertight concrete tank (weiße Wanne) or, in extreme cases, micropiles. Skyline Bau is a general contractor with a restricted building trade licence under § 99 GewO (Austrian Trade Regulation Act) and works with licensed partner firms for structural engineering, design and regulated trades: we coordinate the structural engineering (your structural engineer or our external partner engineer — you decide), agree design and permits with the authorised parties, carry out the work and hand over from a single source.

The second typical reason is alteration work in an existing building: a cellar is to become dry and usable, a former storeroom becomes a hobby room, or underfloor heating is to be installed on the ground floor of an old building without a cellar. The old floor is then removed, the subsoil checked and a new slab installed with damp-proofing and – if the room will be heated – with pressure-resistant insulation. If settlement cracks appear in the walls during this, or an additional storey is planned, that is a separate question: it is then not about the slab but about the existing foundations, and the structural engineer assesses underpinning or foundation strengthening as a related service. Skyline Bau inspects, documents and agrees the next steps with the structural engineer.

Skyline Bau's structural engineering model — two routes, one result

For a ground slab in Vienna, the structural calculation is the basis for the thickness, reinforcement and concrete grade of the slab. Skyline Bau offers two models:

  • Model A — your structural engineer, our construction You bring your own structural engineer or structural designer. Skyline Bau carries out the construction work exactly to the drawings of your designer – to the formwork, reinforcement and site-detail drawings. A clean division of responsibility: the structural engineer is liable for the calculation, Skyline Bau for workmanlike execution. Ideal if you already have an architect or general planner.
  • Model B — Skyline Bau organises the structural design We appoint an external partner structural engineer, receive the calculation from them and pass the cost of the structural engineering on to you transparently — itemised in writing in the fixed-price quotation. The advantage: one point of contact, coordinated appointments, continuous construction sequence planning. Ideal if you want everything from a single source.

New slab, new basement slab or the foundations after all? — Symptom check

The following signs call for a professional assessment – by us for ground slabs and basement slabs, and for cracks in load-bearing masonry additionally by a structural engineer or a licensed master builder (Baumeister) from our partner network. Skyline Bau offers a free initial site visit with a written report and recommended measures.

  • Settlement cracks in walls — Diagonal or stepped cracks at external corners, window lintels or door reveals indicate movement of the foundations. Cracks wider than 2 mm should be assessed promptly – a case for the structural engineer and possibly underpinning, not for a new ground slab.
  • Sticking doors & windows — When doors suddenly no longer close or windows jam, the geometry of the wall has distorted – again a sign of settlement of the foundations.
  • Sunken or hollow-sounding floor — A ball rolls across the room on its own. A fall of more than 1% is conspicuous, more than 2% alarming. The cause is often a poorly compacted hardcore sub-base or washed-out voids beneath the slab.
  • Cracked tile joints — Diagonal cracks in tiles and joints on the ground floor often show that the slab beneath has moved.
  • Wallpaper cracks above doors — When the wallpaper tears exactly above door lintels or between the window reveal and the wall, the masonry is moving – a pointer for the structural engineer.
  • Creaking timber-beam floors — In Gründerzeit buildings (built 1848–1918) with timber joist floors (Tramdecken), sudden creaking indicates a shift in loads. This concerns the floors, not the ground slab, but is checked as part of any alteration.
  • Damp patches in the cellar — A cellar floor without damp-proofing draws moisture from the ground. The remedy is a new basement slab with damp-proofing or – where there is groundwater – as a watertight concrete tank. After excavation work next door, damp can also indicate undermined foundations.
  • Pavement slabs pulling apart — If the joint between the house wall and the pavement opens up, the foundation may have settled – a case for checking the foundations.
  • Planned additional storey or loft conversion — Additional living space in the roof brings additional loads right down to the foundations. The structural engineer checks whether the existing foundations are sufficient or need strengthening – a related service, not a ground slab.
  • Planned extension or annex — An extension usually gets its own ground slab. Where it adjoins the existing house, a separation joint is needed, along with a structural design that takes both foundations into account. Skyline Bau agrees this with the structural engineer.

Why cheap quotes for ground slabs are rarely comparable

We hear it often: "The other firm's slab was a third cheaper." Usually the difference lies not in the price but in the scope of work.

A proper ground slab for a heated residential building needs these services if it is to last for decades:

  • a geotechnical survey or at least a verified assumption about bearing capacity, not just a glance into the excavation
  • a structural design by an authorised chartered engineer (Ziviltechniker) or master builder, with a reinforcement drawing
  • a capillary-breaking hardcore sub-base compacted in layers, with proof of compaction
  • pressure-resistant insulation of XPS or cellular glass whose compressive strength matches the load
  • concrete of the grade required by the structural design, such as C25/30, reinforced to the drawing and with sufficient concrete cover
  • a frost skirt at the edge and a foundation earth electrode, laid before concreting
  • damp-proofing depending on the groundwater level, up to a watertight concrete tank of waterproof (WU) concrete

Leave out half of these and you are considerably cheaper. But what you get is not a ground slab for a home, rather a concrete surface whose defects only become visible once people are already living on it.

Anyone who quotes you a lump sum without a bill of quantities is either leaving out items — or planning extra charges at every turn. Skyline Bau calculates honestly from the outset, in writing, after a site visit, with a penalty agreement for delays.

All ground slab services from a single source

Subsoil & geotechnics

Geotechnical survey with trial pits or boreholes, bearing capacity, soil strata and groundwater level. The basis for any design of the slab. For this, Skyline Bau works with authorised geotechnical partners.

Structural calculation & concept

Design by your structural engineer or a partner structural engineer appointed by Skyline Bau: slab thickness, reinforcement drawing, concrete grade and load transfer from the house. Before concreting, the structural engineer inspects the reinforcement as laid.

Underpinning in existing buildings (related service)

If existing foundations are too shallow or too weak, they are taken deeper section by section in stages – never continuously, but according to the structural engineer's staging plan. This concerns old buildings with settlement or an additional storey, not the new ground slab.

Pad foundations under columns

For point loads (column, pier, carport), a pad foundation is cast instead of, or in addition to, a continuous slab. Economical when only a few points carry the load.

Micropiles

Small-diameter piles (roughly 90–300 mm) whose length is set by the survey – they transfer loads to deeper, load-bearing strata. Useful where the subsoil beneath a new slab is very poor or the site is cramped and no large excavation is possible; more on the excavation pit under excavation Vienna.

Lifting injection / resin injection

Expanding two-component resin is injected into the subsoil through small drill holes, compacts it and can lift a sunken slab back up. Minimally invasive, without excavation. Suitable for minor settlement and small voids beneath existing slabs.

Large-diameter bored piles

Bored piles Ø 600–1,500 mm — for very high loads or the most difficult ground conditions. Practically never needed for detached houses in Vienna; for large projects a matter for specialist foundation engineering partners.

Diaphragm wall

A reinforced concrete wall built in a fluid-supported trench using bentonite — as excavation support on large projects with groundwater. Not relevant to ground slabs for houses, mentioned for the sake of completeness.

New basement slab in an existing building

In an old cellar, the old floor is removed, the subsoil checked and a new slab cast. Where the excavation borders existing foundations, the work is done in sections so the walls are not undermined – the sequence and depth are set by the structural engineer. That way the house remains structurally stable.

Blinding layer

Lean concrete, 5–8 cm thick, beneath the actual ground slab. Provides a level working surface, protects damp-proofing and reinforcement from contamination by soil and evens out the subsoil.

Pressure-resistant insulation beneath the slab

XPS rigid foam boards or cellular glass beneath the slab — thermal conductivity, depending on the product, roughly 0.035–0.040 W/(m·K), compressive strength matched to the load, often 300 kPa or more. Prevents heat loss into the ground and thermal bridges at the edge. The thickness follows from the U-value under OIB Guideline 6.

Top and bottom reinforcement

Steel reinforcing mesh or B550 bar reinforcement in two layers, top and bottom, with spacers for the concrete cover and support chairs between the layers. Sized to the structural design, inspected before concreting.

Concrete pour

Concrete of the grade specified in the design, for houses often C25/30, with frost or moisture exposure or as waterproof (WU) concrete often C30/37 — specified under ÖNORM EN 206 and ÖNORM B 4710-1. Thickness usually 20–35 cm depending on the structural design, compacted with a poker vibrator.

Connection to the existing building

Where a new slab – for example for an extension – adjoins an existing building, it is connected via a separation joint with a waterstop. That way both foundations can settle independently of each other without cracking.

Watertight concrete tank

Where the groundwater level is high — slab and walls of waterproof concrete, designed to the ÖBV (Austrian Society for Construction Technology) guideline "Waterproof Concrete Structures – White Tanks". Watertight without separate damp-proofing; what matters are the waterstops and limiting the crack widths.

Waterproofing (black tank)

Bitumen membrane or polymer-modified bitumen thick coating (KMB) — standard where there is no water under pressure. On rising basement walls with a dimpled membrane as a protective layer.

Foundation earth electrode

Strip or round steel running all round in the new slab, with connection lugs to the main earthing bar — under ÖVE/ÖNORM E 8014, laid before concreting and connected by a licensed electrical partner firm.

Lightning protection upgrade

Where external lightning protection is present: down conductors and test joints are connected to the new foundation earth electrode and tested — by the electrical partner firm, in accordance with the relevant ÖVE regulations.

Condition survey of neighbouring buildings

Before work starts, photo and measurement documentation of all adjoining buildings — important when the excavation comes close to a neighbouring house. Protects against unjustified damage claims and documents justified ones.

MA 37 approval

The planning-submission drawings and structural design are prepared by a licensed master builder partner firm (§ 94 Z 5 GewO). Skyline Bau coordinates the procedure and carries out the construction work. The duration depends on the procedure, usually several weeks to months.

Skyline Bau · General contractor · Structural engineering under Model A or B

Ground slab Vienna from a single source — structural design and master builder services through licensed partner firms, site management by us. — One contract, one point of contact.

How much does a ground slab in Vienna cost?

What does a ground slab in Vienna really cost? For a detached house usually a five-figure sum, for large areas or as a watertight concrete tank possibly more. Realistic guide prices from Skyline Bau — net, in writing, after a site visit, without extra charges, consistent with the cost table above:

Guide prices for a ground slab in Vienna (net)
Geotechnical survey & structural designfrom €3,850
Unreinforced slab per m²€110–190/m²
Reinforced slab, uninsulated€150–260/m²
Reinforced slab with insulation€180–380/m²
Slab over a basement or underground car park€220–420/m²
Frost skirt per linear metre€85–180/lin. m
Foundation slab as a watertight concrete tank€280–520/m²
Foundation earth electrode per linear metre€12–35/lin. m
Micropiles for poor subsoilfrom €850/pile

As of 2026 · Guide prices net, excl. 20% VAT · Final costing after geotechnical survey, structural design and site visit.

Viennese specifics

A ground slab in Vienna comes with technical, geological and legal specifics that you should know about before obtaining a quote. Skyline Bau works with these conditions in every district — from the Innere Stadt to Donaustadt.

  • Old cellars without a floor slab — Many Gründerzeit buildings stand on strip foundations of rubble stone or brick without steel, which often reach only a little below the cellar floor; the floor itself is brick paving or clay. If a new slab is installed there, the excavation must not undermine the foundations.
  • Gründerzeit structural engineering — Timber joist floors transfer loads differently from reinforced concrete floors. For alterations with new loads, the load path down to the foundation has to be recalculated — by the structural engineer with whom Skyline Bau coordinates the work.
  • Groundwater level by Vienna district — In Vienna it varies greatly depending on location: in the areas of Donaustadt, Floridsdorf and Brigittenau close to the Danube it is often high, in the western hillside districts usually deep. The groundwater level decides between damp-proofing (black tank) and a watertight concrete tank (white tank).
  • Old cellars and voids — In some areas, for instance in parts of Ottakring, Hernals and Währing, there are old cellars and voids that appear on no plan. A geotechnical survey before the slab is especially important there.
  • Underpinning as a separate service — If an existing foundation has to be taken deeper or widened, this is done section by section in stages as specified by the structural engineer, with monitoring of the building fabric. It is a service related to the ground slab, not a variant of it.
  • Concrete grade under ÖNORM B 4710-1 — The strength class is set by the structural engineer: for ground slabs in housing often C25/30, for higher requirements, freeze-thaw cycles or as waterproof (WU) concrete often C30/37. Added to this is the exposure class, which determines the concrete mix.
  • Foundation earth electrode under ÖVE/ÖNORM E 8014 — Running all round in the slab, connected to the main earthing bar in the distribution board. Laid before concreting, photographed and documented.
  • Lightning protection when working in the ground — If the building has external lightning protection, down conductors and test joints must be reconnected when work is done on the earthing — otherwise the protective effect is not guaranteed.
  • MA 37 building authority — New builds, extensions and interventions in the load-bearing structure generally require a permit or notification under the Vienna Building Code (Wiener Bauordnung). A licensed master builder partner firm (§ 94 Z 5 GewO) prepares the planning-submission drawings; Skyline Bau coordinates the application.
  • Frost depth in Vienna — For Vienna, the frost-free foundation depth is generally taken as at least 80 cm, more in exposed locations. The frost skirt or foundation must reach at least that depth to prevent frost heave.
  • Conservation zone requirements, MA 19 — In conservation zones (Schutzzonen), visible changes to a building are subject to particular approval requirements. Even a slab for an extension in a courtyard or garden can be affected — the designer clarifies this with the authority.
  • Condition survey strongly recommended — If the excavation comes close to a neighbouring building, for example in a terraced or multi-occupancy setting, a condition survey before work starts is strongly recommended — it protects against later damage claims and is relevant for insurance.

Ground slab — in all 23 districts and the surrounding area

We build ground slabs throughout Vienna, as well as in Klosterneuburg and the surrounding area of Lower Austria. The groundwater level and the bearing capacity of the soil determine the design.

Ground slab Vienna for homeowners, property managers & owners' associations (WEG)

Self-builders & prefabricated-house clients

Anyone building a detached or prefabricated house needs a slab that matches the plan exactly. Skyline Bau coordinates the slab drawing, service routing and dates with the planner and manufacturer — so that assembly can start on the agreed day.

Property managers & owners' associations (WEG)

For new basement slabs, floors for refuse or bicycle rooms and garage areas in existing buildings, owners' associations need traceable documentation. Skyline Bau documents to insurance standards and prepares documents for the resolution of the condominium owners' association (WEG), with photos and a bill of quantities.

Developers & investors

Anyone building new or developing an existing property with an extension needs the foundation costs in the project price early on. Skyline Bau provides reliable guide prices based on surveys and drawings — before the purchase decision.

Detached-house owners with a garage or extension

A new garage, a conservatory, an extension for a home office — each of these needs its own slab. If cracks appear in the existing house, we also check with the structural engineer whether the old foundations need upgrading.

Terraced house developers

When a new terraced house is built onto an existing one, a separation joint is needed between the foundations and, depending on the depth of the excavation, the neighbouring foundation may need securing. Skyline Bau accompanies this with a condition survey.

Architects & general planners

Skyline Bau as general contractor for architects and general planners — construction to your drawings, structural engineering and regulated trades via licensed partner firms, complete photo documentation. Also as a subcontractor for the foundations.

Typical service packages for a ground slab in Vienna

  • Initial inspection with written report — free of charge in Vienna, with recommended measures and an indicative guide price. Skyline Bau comes to you.
  • Geotechnical survey + structural design Trial pits or boreholes, bearing capacity, groundwater level and design of the slab by the structural engineer, written report with a specific recommendation, from €3,850 net.
  • Reinforced ground slab with insulation for heated residential buildings, with hardcore sub-base, blinding layer, damp-proofing, XPS insulation, reinforcement and C25/30 concrete, €180–380/m² net.
  • Micropiles for very poor subsoil or cramped sites, pile Ø 90–300 mm, length according to the survey, from €850/pile net.
  • Lifting injection Resin injection beneath sunken foundations or slab edges, minimally invasive without excavation, for minor settlement, calculated along the wall from €320/lin. m net.
  • New basement slab in an existing building Removal of the old floor, excavation in sections along the foundations, blinding layer, damp-proofing, insulation for heated rooms and a new reinforced concrete slab — priced after a site visit, because demolition and access vary greatly.
  • Complete floor (new build-up) Blinding layer + 12 cm pressure-resistant insulation + reinforcement + 25 cm of C25/30 concrete, from €285/m² net.
  • Foundation slab as a watertight concrete tank where there is groundwater, of waterproof (WU) concrete to the ÖBV guideline for white tanks, with waterstops, €280–520/m² net.
  • Damp-proofing (black tank) without water under pressure, bitumen membrane or KMB, on walls with a dimpled-membrane protective layer, as a layer beneath the slab €18–45/m² net.
  • Foundation earth electrode + connection strip or round steel running all round with a connection lug to the main earthing bar, €12–35/lin. m net, connected by the electrical partner firm.
  • Lightning protection upgrade down conductors, earthing and test joints tested, documented and reconnected, from €4,500 net.
  • Condition survey of neighbouring buildings photo and measurement documentation of all adjoining buildings — to insurance standards, from €1,850 net.
  • Settlement monitoring (levelling) Measurements on adjoining buildings before, during and after the work — relevant for insurance in the event of structural damage, from €1,250 net.
  • MA 37 permit package Planning-submission drawings, structural verification and application by licensed partner firms, coordinated by Skyline Bau, from €2,850 net.
  • Garage slab for a single or double garage, reinforced and uninsulated, with a drainage channel in front of the door, €150–260/m² net.
  • Expert report for cracks or damage to existing slabs, by an independent expert from the partner network, for insurers, property management or court, in writing with photo documentation, from €1,450 net.
  • Confirmation of execution written confirmation at the end of construction that the work was carried out as planned, issued by Skyline Bau as general contractor; the structural confirmation comes from the authorised structural engineer or master builder partner firm.
  • Complete photo documentation Photos of every work stage, particularly of the reinforcement and the cast-in services before concreting — handed over as a digital folder for your records.

Process: from plan to handover

01 Initial site visit & preliminary investigationSkyline Bau inspects the plot or cellar, checks access, subsoil and existing services, and for existing buildings also cracks and damp. A first indication of the scope. Duration: 1 working day, free of charge.
02 Subsoil & structural designGeotechnical survey with bearing capacity and groundwater level. The structural engineer (your own or a partner structural engineer appointed by Skyline Bau) designs the slab thickness, reinforcement and concrete grade. Duration: 3–6 weeks.
03 Fixed-price quotation under ÖNORM B 2110Written bill of quantities with all layers and items, fixed price after a site visit, schedule with a penalty agreement. Skyline Bau calculates honestly from the outset.
04 MA 37 permit & condition surveySubmission to MA 37 via the designer, where required. In parallel, a photographic condition survey of neighbouring buildings if the excavation comes close. Duration: depending on the procedure.
05 Excavation, hardcore sub-base, blinding layerExcavation down to formation level, soil replacement where necessary, hardcore sub-base compacted in layers with proof of compaction, lean concrete as a blinding layer. In existing buildings in sections, so that foundations are not undermined. Photo documentation of every step. Duration: 1–2 weeks depending on size.
06 Damp-proofing, insulation, reinforcement, concreteDamp-proofing → pressure-resistant insulation → PE sheeting → surveying services and conduits → foundation earth electrode → reinforcement with inspection by the structural engineer → concrete pour → curing. Where there is groundwater, WU concrete with waterstops instead of separate damp-proofing. Duration: 1–2 weeks plus curing.
07 Handover & warrantyHandover of the records: compaction report, reinforcement inspection with photos, delivery notes and concrete tests, survey record of the services, confirmation of the foundation earth electrode. Handover record under ÖNORM B 2110. The statutory warranty period is three years (§ 933 ABGB, Austrian Civil Code).

Why choose Skyline Bau for your ground slab in Vienna

  • Parliament building, 1010 Vienna — renovation 2022 — On the 2nd basement level of the Austrian Parliament building (Dr.-Karl-Renner-Ring 3), Skyline Bau carried out drywall, painting and skimming work as well as floor upgrades. Regulated trades — electrical engineering (§ 94 no. 16 GewO) and tiling (§ 94 no. 38 GewO) — were carried out by licensed partner firms, coordinated by Skyline Bau. Client: W+R Schirmungstechnik GmbH. The reference letter dated 17.10.2022 certifies that the work was of high quality, on schedule and cost-effective. View the reference letter as a PDF
  • General contractor — Skyline Bau is the brand of Bling Bling GmbH, a restricted building trade business under § 99 GewO. Not a licensed master builder (Baumeister). Structural engineering, design and MA 37 submissions are handled by licensed master builder partner firms, which we coordinate. You receive proof of their authorisation.
  • Realistic guide prices from €110 per m² — from the unreinforced slab to the watertight concrete tank, net, in writing, after a site visit. Skyline Bau calculates honestly from the outset.
  • Flexible structural engineering model — you bring your own structural engineer and we build to their plans — or Skyline Bau appoints an external partner engineer and passes the costs on transparently.
  • Reinforcement inspection before concreting — No slab is poured until the reinforcement has been inspected, photographed and checked against the drawing.
  • Weekly photo documentation — Photo updates for the client, property management, the owners' association meeting and the insurer, handed over as a digital folder.
  • Recording the condition of neighbouring buildings — photo and measurement documentation of all adjoining buildings before work begins — protects against unjustified damage claims.
  • New earthing system under E 8014 — foundation earth electrode running all round under ÖVE/ÖNORM E 8014, installed by a licensed electrical partner firm.
  • Lightning protection connected — Where external lightning protection is present, down conductors and test joints are connected to the new earth electrode — no gaps in protection.
  • Fixed price in writing — A lump-sum price based on the bill of quantities, agreed in writing — it stays the same even if construction takes longer or material prices rise. Penalty agreement for delays of €80–150 per working day.
  • €3 million construction liability insurance — consequential damage to neighbouring buildings is covered.
  • Warranty under the ABGB — 3 years on construction work under § 933 ABGB. Bling Bling GmbH, as general contractor, is liable for the overall work, including the work of the licensed partner firms.
  • New build and existing buildings — from a detached house on a greenfield site to an old cellar with a new floor slab: the work is tailored to your property, not to a standard package.

How to recognise a reputable provider

Check these six points with every ground slab contractor in Vienna — including us. They take ten minutes and, in the worst case, spare you a legal dispute.

1. Ask for the GISA number

Every trade business in Austria has a GISA number. In the public trade register you can see which trades the business has actually registered. Anyone who will not give you the number has a reason for it.

2. Who carries out the regulated trades?

Interventions in the building fabric involve master builder services under § 94 Z 5 GewO — design, structural engineering, submission to MA 37. A business with a restricted building trade licence may not do this itself. Ask which licensed master builder will take this on.

3. Site visit before quotation

A quotation for a ground slab in Vienna without a site visit is guesswork. What lies behind the wall or under the floor only becomes visible once it is opened — and that is exactly where variations arise.

4. Bill of quantities instead of a lump sum

A reputable quotation lists items with quantities and unit prices. "All-in lump sum" without a breakdown is not a quotation but an invitation to variations.

5. Ask for proof of construction liability insurance

Ask about the insurer and the sum insured. In an occupied tenement building, damage can quickly run to six figures — and then affect other people's flats as well.

6. Do not confuse the warranty

The statutory warranty for immovable property is 3 years under § 933 ABGB (Austrian Civil Code). Anyone who promises you more must put it in the contract — verbally it is worth nothing.

What types of ground slab providers there are

Specialist foundation firms

Businesses that concentrate on foundation slabs, strip foundations and special foundations. Useful for difficult subsoil or pile foundations.

Basement construction firms

Providers who build basements including the ground slab, often as precast or cast-in-situ basements. Compare whether insulation, damp-proofing and frost skirt are included in the price.

If you are planning a ground slab in Vienna and want foundations, services and shell construction from a single source, Skyline Bau as general contractor is one option: at a fixed price, professionally executed and with licensed partner firms for the regulated parts.

Shell construction firms and general contractors

Businesses that offer the ground slab as part of the shell construction. Advantage: one interface fewer between slab and masonry, one point of contact for dates and warranty.

The typical ground slab build-up

  • Layer 1 — excavation and soil compaction: earthworks down to formation level, at the edge down to frost-free depth (in Vienna at least 80 cm), compaction with a roller or vibrating plate, topped by the capillary-breaking hardcore sub-base.
  • Layer 2 — blinding layer: 5 cm of C8/10 lean concrete, screeded level.
  • Layer 3 — thermal insulation: 15–20 cm of XPS rigid foam insulation (lambda roughly 0.035–0.038 W/mK); the thickness depends on the target U-value, OIB Guideline 6 sets the minimum requirement, and energy-efficient houses are well below it.
  • Layer 4 — reinforcement: reinforcing steel mesh in two layers (top + bottom), cross-section according to the structural calculation, spacers for 5 cm concrete cover.
  • Layer 5 — reinforced concrete ground slab: typically 20–30 cm thick, C25/30 concrete (standard in Vienna; at sites with groundwater, C30/37 watertight concrete).
  • Layer 6 — frost skirt: running all round the outside, 80 cm deep, against frost heave of the ground slab.
  • Layer 7 — curing: covered with sheeting for 7 days, protection against drying out and frost.

The typical process under the Vienna Building Code

  • Step 1 — planning for submission: architect's and structural engineer's drawings, soil report under ÖNORM EN 1997.
  • Step 2 — MA 37 building permit: required for most building projects, building hearing with neighbours involved.
  • Step 3 — excavation and earthworks: 2–5 days depending on size.
  • Step 4 — formwork and reinforcement: 2–4 days, with the structural engineer inspecting the reinforcement before concreting.
  • Step 5 — concreting: 1 day, followed by 7 days of curing.
  • Step 6 — load-bearing capacity: 28 days to nominal strength; construction continues as soon as the structural engineer gives the go-ahead, often after about one to two weeks.
  • Total duration: around 1 to 2 weeks of active construction, plus a 28-day curing period (which can be used in parallel for further construction progress).

The ÖNORM family for ground slabs

  • ÖNORM EN 206 / ÖNORM B 4710-1 — Concrete: specification, performance, production and conformity (strength classes C8/10 to C50/60), with the Austrian supplements.
  • ÖNORM EN 1992-1-1 (Eurocode 2) — design of reinforced concrete elements such as the ground slab, with National Annex.
  • ÖNORM EN 1998-1 (Eurocode 8) — design for earthquake resistance, with the National Annex for Austria.
  • ÖNORM EN 1997 (Eurocode 7) — geotechnical design, Part 1: general rules.
  • ÖNORM EN 1997-2 (Eurocode 7, Part 2) — ground investigation and testing.
  • ÖBV guideline "Waterproof Concrete Structures – White Tanks" — design and construction of waterproof (WU) ground slabs where there is groundwater.
  • ÖNORM B 2110 — General contractual conditions for construction work (standard for works contracts).
  • OIB Guideline 6 — thermal protection: U-value of the ground slab in heated buildings.
  • OIB Guideline 1 — mechanical resistance and stability.

Special cases: when does Vienna need more than the standard?

  • High groundwater level (Donaufelder, Nordbahnviertel, near the Lobau): watertight "white tank" of WU concrete, often C30/37 — guide price €280–520/m².
  • Difficult subsoil (loess loam, local sand lenses): soil replacement, micropiles or bored piles — depending on the geotechnical survey.
  • Heavy industrial or commercial buildings: thicker ground slab (35–60 cm) plus heavier reinforcement.
  • Earthquake safety: Eurocode 8 (ÖNORM EN 1998-1) may prescribe minimum reinforcement and structural details depending on the location and the building.
  • Heavy-duty areas for machinery or storage: in workshops and halls with forklift traffic or racking loads — slab with heavier reinforcement and a wear-resistant surface, designed for the actual point loads.

Why choose Skyline Bau for your ground slab?

First — everything via one general contractor. Instead of coordinating three subcontractors (earthworks, formwork, concrete), with Skyline Bau you have a fixed-price contract under ÖNORM B 2110.

Second — routine with the Vienna Building Code. Submission to MA 37 via the designer, sewer connection with Wien Kanal, involvement of neighbours — we coordinate the process.

Third — structural engineering and subsoil taken seriously. Design by an authorised structural engineer under Eurocode 2, subsoil under Eurocode 7, and where required earthquake verification under Eurocode 8.

Fourth — a fixed price with transparent costing. A clear price according to size, excavation, reinforcement, concrete class, frost skirt and services — no hidden extras.

Legal notice on the provision of services:
Skyline Bau operates as a general contractor with a restricted building trade licence under § 99 GewO. Regulated trades — in particular master builder services (§ 94 Z 5 GewO), design and structural engineering services, electrical engineering (§ 94 Z 16 GewO), gas and plumbing (§ 94 Z 25 GewO) and tiling work (§ 94 Z 38 GewO) — are carried out exclusively by appropriately authorised subcontractors and partner firms. Construction work is carried out by tradespeople within the group of companies holding a valid licence.

The basics: what you should know

So that you know exactly what to expect, we answer the most important questions about the ground slab here — honestly and from the practical experience of a general contractor.

What is a ground slab?

The ground slab is a continuous, reinforced concrete slab that serves as the foundation and transfers the load of the building evenly over its area into the subsoil. For new builds without a basement it is the usual foundation and at the same time forms the ground-floor floor; in houses with a basement it is the basement floor slab.

Ground slab or strip foundation?

A ground slab distributes the load evenly and is well suited to settlement-sensitive soil or where a continuous surface is needed. Strip foundations run beneath the load-bearing walls and make sense on other types of ground. The structural design determines what is suitable on the basis of the soil report.

Does the ground slab have to be insulated?

For heated buildings, yes — an insulated ground slab prevents heat loss downwards and is part of an energy-efficient building envelope. The insulation is installed beneath or within the slab. We build the ground slab professionally with suitable insulation and waterproofing.

How much does a ground slab cost in Vienna?

The cost depends on the area, thickness, reinforcement, insulation and ground conditions. After the structural design you receive a binding fixed-price quotation.

Frequently asked questions about ground slabs in Vienna

What goes with it: related topics

The ground slab is the interface between the ground and the building. What is connected:

Foundations Vienna

The ground slab is the most common type of foundation — an overview of all foundation types.

Demolition & excavation Vienna

Before the slab come excavation and compaction of the subsoil.

Shell construction Vienna

The shell construction begins on the ground slab — walls and floors.

Basement renovation Vienna

Where there is groundwater, the slab becomes part of the watertight tank — the same issue as with damp basements.

New build Vienna

In a new build, the ground slab is the first concreted component.

Foundation strengthening Vienna

With existing buildings, the issue is not a new slab but upgrading the existing foundations.

Why is a good ground slab in Vienna more expensive than expected?
Because most of the cost is not in the concrete. A proper slab for a residential building needs a geotechnical survey, structural design, excavation, a hardcore sub-base compacted in layers with proof, a blinding layer, damp-proofing, pressure-resistant insulation, PE sheeting, two-layer reinforcement with inspection, concrete of the required grade, a frost skirt, a foundation earth electrode, surveyed services and, where needed, a condition survey of neighbouring buildings. In the worked example with 110 m², that comes to around €443/m² net. Anyone quoting well below that is usually leaving items out or planning extras. Skyline Bau calculates honestly from the outset — fixed price in writing after a site visit.
Why is an old cellar not dug out all at once?
Because external and internal walls stand on old strip foundations that often reach barely deeper than the cellar floor. If the full length along the walls is excavated at the same time for a new slab or underpinning, lateral restraint and bearing are lost — the house can settle, cracks appear, and in extreme cases serious damage is a risk. That is why the work there is done section by section in stages; the width of the sections and the waiting time until sufficient hardening are set by the structural engineer. Skyline Bau adheres strictly to these requirements on every old-building project.
What is a staging plan for underpinning?
Not one section after another side by side, but every third or fourth first — for example stages 1, 4, 7, 10. After sufficient hardening, as specified by the structural engineer, come 2, 5, 8, 11, and finally the remaining 3, 6, 9, 12. That way there are always load-bearing sections of wall standing on undisturbed ground, and the house remains stable throughout the construction period. Underpinning is a service related to the ground slab; Skyline Bau documents the sequence with photos and measurement records.
Do the foundations need strengthening for a loft conversion in Vienna?
Often in Gründerzeit buildings and in buildings up to around 1960. A converted loft brings additional loads right down to the foundations. If the existing strip foundations are not sufficient for this — often the case in Vienna's old buildings —, they are strengthened or underpinned. That is a separate service, not a new ground slab; more on this under foundation strengthening. For every loft conversion, the structural engineer or a licensed master builder partner firm (§ 94 Z 5 GewO) checks the load path down to the cellar floor. We tell you the result clearly: does it need strengthening, yes or no.
Which concrete is used for a ground slab?
The strength class is set by the structural engineer, and it is specified under ÖNORM EN 206 and ÖNORM B 4710-1. For ground slabs in housing, C25/30 is common — 25 N/mm² compressive strength on the cylinder or 30 N/mm² on the cube. For higher requirements, freeze-thaw cycles or as WU concrete for the watertight tank, C30/37 is often used. For the blinding layer, lean concrete such as C8/10 is sufficient. Skyline Bau sources concrete only from quality-monitored ready-mix plants — with a delivery note for every load.
How is the new floor construction built up layer by layer?
From the bottom up: first, the compacted hardcore sub-base. Second, the blinding layer of lean concrete, 5–8 cm, as a working surface. Third, damp-proofing against ground moisture. Fourth, pressure-resistant insulation of XPS or cellular glass, 12–20 cm, with a compressive strength matched to the load. Fifth, PE sheeting as a separating layer. Sixth, the bottom layer of reinforcement with spacers, above it support chairs and the top layer. Seventh, the concrete, 20–35 cm depending on the structural design. Laid before concreting: the foundation earth electrode as well as drainage pipes and conduits.
What happens to earthing and lightning protection with a new slab?
Every new ground slab needs a foundation earth electrode under ÖVE/ÖNORM E 8014 — strip or round steel running all round, with connection lugs. If a new floor slab is installed in an existing building, the earthing is also re-established. Where external lightning protection is present, down conductors, test joints and connection points must be connected to the new electrode, otherwise the protective effect is not guaranteed — dangerous for occupants and building services. Skyline Bau coordinates this with licensed electrical partner firms and hands over their test report.
How long does a project with a ground slab in Vienna take overall?
The survey, structural design and – if necessary – the permit usually take a few weeks to a few months. For a detached house, the slab itself is finished in two to four weeks from excavation to release, including curing time. A new basement slab in an existing building takes longer because of the demolition and the work in sections. Skyline Bau schedules everything in a detailed construction programme and secures it with a penalty agreement of €80–150 per working day for delays. The curing time cannot be shortened at will without putting quality at risk.
What are micropiles and when do they make sense?
Micropiles are small-diameter piles (roughly 90–300 mm) that are drilled into the ground and grouted — they transfer loads down to deeper, load-bearing strata. Beneath a new ground slab they come into question if the subsoil still does not bear the load even after replacement; in existing buildings where conventional underpinning with excavation is not possible. Number, spacing and length are set by the survey and the structural engineer. Guide price from €850/pile net. Whether a permit is needed in a conservation zone is clarified case by case by the designer.
What alternatives are there for poor subsoil?
First, soil replacement: material without sufficient bearing capacity is excavated and replaced with gravel compacted in layers. Second, micropiles for deep soft strata or cramped sites. Third, lifting injection with expanding resin for minor settlement of existing slabs — minimally invasive, without excavation. Fourth, ground improvement by grouting with cement suspension. Fifth, large-diameter bored piles for very high loads, rare for houses. Skyline Bau chooses the appropriate method with the geotechnical expert and structural engineer — often a combination of several methods.
How much does a geotechnical survey cost in Vienna?
A geotechnical survey with trial pits or boreholes, bearing capacity, groundwater level and a written report including preliminary structural design costs from €3,850 net. For this, Skyline Bau works with authorised geotechnical partners. It is the basis for any design of the slab. For complex sites (slopes, high groundwater, suspected voids) it can cost €5,500–8,000. A survey applies to the specific plot and, if conditions are unchanged, can also be used for later building projects.
How important is the condition survey of neighbouring buildings?
Very important as soon as the excavation comes close to neighbouring buildings. Before excavation, all adjoining buildings should be documented with photos and measurements. Existing cracks, plaster damage and floor gradients are recorded. This protects Skyline Bau and the client against unjustified damage claims ("There was no crack there before!") — and documents justified damage for the insurer. Cost from €1,850 net. Skyline Bau strongly recommends it for every terraced house or multi-occupancy building.
What frost depth applies in Vienna?
In Vienna, the frost-free foundation depth is generally taken as at least 80 cm; in exposed, free-standing locations, for example on the outskirts and in the Vienna Woods (Wienerwald), more may be required. The frost skirt and foundations must reach at least frost-free depth, otherwise frost heave risks frost damage in winter. Skyline Bau dimensions according to local conditions — the geotechnical survey and structural design set the depth.
What applies with high groundwater or flood risk in Vienna?
In some areas close to the Danube (Donaustadt, Floridsdorf, Brigittenau, parts of Leopoldstadt) the groundwater is high. For a ground slab in these locations, a watertight concrete tank of WU concrete is often required, designed to the ÖBV guideline — watertight against water under pressure. Depending on use, a pump sump is added. Skyline Bau dimensions according to the survey and groundwater data. Guide price for a watertight tank €280–520/m² net — noticeably more than an insulated slab with damp-proofing.
Is there funding for a ground slab in Vienna?
As a rule, there is no separate funding for the ground slab alone. If it is part of a new build or a thermal renovation, the project as a whole may be eligible for funding in some circumstances — for example via Vienna's housing subsidy scheme (Wiener Wohnbauförderung) or federal programmes for thermal renovation. Which programmes are currently running and which conditions apply changes constantly and must be checked with the relevant funding body before work starts. Skyline Bau provides the necessary documents such as the bill of quantities and invoices.
How much does a ground slab cost per square metre?
Unreinforced €110 to €190/m², reinforced without insulation €150 to €260/m², reinforced with insulation for a heated residential building €180 to €380/m². A 110 m² slab with insulation and frost skirt comes to around €48,700 net, i.e. €443/m².
Why does the build-up cost more than the concrete?
Because beneath the slab there are the hardcore sub-base, blinding layer, damp-proofing, insulation and separating layer, and at the edge the frost skirt. In the worked example this part accounts for more than half — and it cannot be added afterwards.
How is a ground slab built up?
From the bottom: load-bearing subsoil, capillary-breaking hardcore 20 to 40 cm, blinding layer of lean concrete, damp-proofing against ground moisture, compression-resistant perimeter insulation, PE sheeting as a separating layer, reinforcement with spacers, concrete 20 to 35 cm, and the frost skirt at the edge.
How thick does a ground slab need to be?
For residential buildings usually 25 to 35 cm including frost skirt, for outbuildings 15 to 20 cm. The exact thickness is set by the structural design, depending on the loads and the ground — not by rule of thumb.
What is the hardcore sub-base?
A capillary-breaking gravel layer of 20 to 40 cm beneath the slab, €18 to €38/m². It interrupts the capillary rise of ground moisture and serves as frost protection. It is laid and compacted in layers — poorly compacted hardcore subsides.
What is a frost skirt?
A downstand at the edge of the slab to a frost-free depth of at least 80 cm, €85 to €180 per linear metre. It prevents frost from reaching under the slab edge and lifting it. Without it, the slab cracks at the edge.
Does insulation have to go under the slab?
For heated buildings, yes, with compression-resistant perimeter insulation made of XPS or foam glass, 12 to 20 cm and €28 to €65/m². Without it, heat escapes straight into the ground and the floor stays cold. This cannot be remedied afterwards.
Why compression-resistant insulation?
Because the entire weight of the building rests on it. Ordinary insulation boards would be compressed and the slab would settle. XPS or foam glass with a stated compressive strength is used — and that should be written in the quotation.
Ground slab: what is a white tank?
A construction of watertight concrete that is sealed against water under pressure without any additional waterproofing, €280 to €520/m². Necessary where the groundwater level is high. The joints are critical — that is where it leaks, if it leaks at all.
Does the ground have to be investigated before the ground slab?
For the design, yes: bearing capacity and groundwater level determine thickness, reinforcement and waterproofing. Without a report, the calculation errs on the safe side – which is more expensive.
What happens if the soil cannot bear the load?
Then it is replaced, compacted or the foundation is taken deeper. With very poor ground, micropiles that transfer the load into load-bearing strata may be considered. The report says what is needed — not a glance into the excavation.
What has to go into the slab before concreting?
Drainage pipes laid to falls, empty conduits for electrics and telecoms, the earthing system and, where applicable, empty conduits for a heat pump or photovoltaics. Everything is set out and documented. Anything missing can only be added later by breaking out the floor in the finished living space.
What is a foundation earth electrode?
A strip or round steel conductor embedded in the slab that earths the electrical installation, €12 to €35 per linear metre. It must be laid before concreting — afterwards you need a deep earth electrode, which costs many times as much.
Does the underfloor heating go into the ground slab?
No, it sits in the screed above. The slab contains only empty conduits and connection pipes. The exception is thermally activated building components, but these are planned specifically and are rare in detached houses.
Why a PE sheet under the slab?
It prevents the fresh concrete from losing water to the ground. Concrete that dewaters too quickly does not reach its strength. The sheet costs €3 to €8/m² and is still regularly left out.
What is concrete cover and why does it matter?
The distance between the reinforcing steel and the concrete surface, ensured by spacers. If it is too small, moisture reaches the steel, which rusts and causes the concrete to spall. A small item with a big impact on service life.
How is it proven that the reinforcement is correct?
Before concreting, the installed reinforcement is photographed and checked against the drawing. After that it can no longer be seen.
How long does the slab need to cure?
It can be walked on after one to two days, loaded after release by the structural engineer, and reaches its nominal strength after 28 days. Curing is crucial: keep it moist and protect it from sun, wind and frost. Concrete that dries out too quickly cracks.
Can concrete be poured in winter?
Above 5 °C, yes; in frost only with additional measures — antifreeze admixtures, heating mats, covers. Slower and more expensive. Concrete is never poured on frozen ground, because it subsides when it thaws.
Ground slab or basement — which is better?
A basement costs an extra €350 to €700 per square metre of basement area, but it creates usable space at the lowest price per square metre in the house and keeps the building services accessible. With high groundwater, the calculation is reversed. The ground slab is cheaper and quicker, but final.
Can I add a basement later?
Technically possible with underpinning, but economically it almost never makes sense — the costs are many times higher than for a basement of the same size in a new build. This decision is made before concreting, not afterwards.
How level does the slab have to be?
In line with the flatness tolerances of the relevant ÖNORM, depending on what goes on top. Larger tolerances are permitted under screed than for floor coverings laid directly. The required tolerance belongs in the quotation — otherwise there will be arguments about it.
Ground slab: what documentation do I receive?
Structural calculation, compaction test of the hardcore, reinforcement inspection record with photos, delivery notes and concrete quality tests, setting-out record of the pipework, measurement and acceptance record under ÖNORM B 2110.
How long does a ground slab take?
For 110 m², allow two to four weeks from excavation to release, including curing time. The actual concreting takes half a day — it is the time before and after that makes the difference.
How much does a ground slab for a garage cost?
For a single garage with a reinforced, uninsulated slab, the guide value is €150 to €260 per square metre net. At around 18 to 20 m², the result tends towards the upper end of the range because of fixed costs. On top of that, there may be excavation, soil replacement where the ground is poor and a drainage channel in front of the door.
Can I contribute my own work to the ground slab?
For preparatory work, yes, such as clearing vegetation or clearing the plot. Formwork, reinforcement and concreting should come from a single source, because otherwise nobody is liable for the finished slab. Anyone doing parts themselves should define this clearly in the contract, so that if a crack appears later it is clear who is responsible for what.
Who specifies the dimensions of the ground slab for a prefabricated house?
The house manufacturer, with its own slab plan. This shows the external dimensions, permitted tolerances and the exact position of all penetrations for waste water, water and electricity. This plan is the basis for the quotation and the works. Without it, no slab can be built on which the prefabricated walls fit without rework.

Glossary & technical terms

Underpinning

Subsequently taking an existing foundation deeper or widening it, section by section in stages — a related service in old buildings with additional loads or settlement cracks, not part of a new ground slab.

Stage width

Underpinning is never carried out continuously, but in narrow sections whose width is set by the structural engineer; the next section only follows once the previous one has hardened sufficiently.

Staging plan

The sequence of sections in underpinning — not side by side but staggered, for example every third or fourth first, the gaps afterwards. Set by the structural engineer.

Blinding layer

A layer of lean concrete 5–8 cm thick beneath the ground slab — a level, clean working surface for damp-proofing, insulation and reinforcement, evening out the subsoil.

C25/30

Concrete strength class under ÖNORM EN 206 / ÖNORM B 4710-1 — 25 N/mm² on the cylinder, 30 N/mm² on the cube. A common grade for ground slabs in housing; which class is needed is set by the structural engineer.

Exposure class

Classification of the environmental conditions for concrete — for example XC1 dry, XC2 wet and rarely dry, XC4 alternately wet and dry, XF for freeze-thaw cycles. Determines the mix and minimum strength.

XPS

Extruded polystyrene rigid foam — pressure-resistant insulation beneath the ground slab; the required compressive strength (often 300 kPa or more) depends on the load and the product data sheet.

B550 reinforcing steel

Standard reinforcing steel in Austria — yield strength 550 N/mm², as mesh (for flat elements such as the ground slab) or bars (for edges, frost skirt and additional reinforcement).

Connecting old to new

The connection between the existing foundation and new concrete in underpinning — grouted with expanding mortar to create a load-bearing bond, so that the load is transferred without settlement.

Watertight concrete tank (weiße Wanne)

Building elements of waterproof concrete that are watertight without separate damp-proofing — designed to the ÖBV guideline for white tanks. Used where there is groundwater.

Waterproofing

Bitumen membrane or polymer-modified bitumen thick coating (KMB) — the usual damp-proofing as a "black tank" where there is no water under pressure.

Dimpled membrane

HDPE protective layer with dimples — protects the waterproofing from mechanical damage and allows water to drain away.

Foundation earth electrode

Strip or round steel running all round in the ground slab — under ÖVE/ÖNORM E 8014, laid before concreting and connected to the main earthing bar.

Main earthing bar

The central earthing busbar in the building — all conductive parts and the foundation earth electrode are connected to it, in accordance with the ÖVE regulations.

OIB Guideline 6

Energy saving and thermal insulation — sets the U-value requirements for building elements in contact with the ground, and therefore also for the insulated ground slab.

Micropile

A small-diameter pile (roughly 90–300 mm), length according to the survey — transfers loads to deeper, load-bearing soil strata when the subsoil beneath the slab does not bear the load.

Lifting injection

Expanding two-component resin is injected into the subsoil, compacts the ground and can lift sunken slabs. A minimally invasive alternative to underpinning; suitability according to the survey.

Large-diameter bored pile

Bored pile Ø 600–1,500 mm — for very high loads or the most difficult ground conditions. Rare for houses in Vienna.

Diaphragm wall

A reinforced concrete wall built in a bentonite-supported trench — excavation support on large projects with groundwater.

Levelling

Geodetic height measurement for monitoring settlement — before, during and after construction work, on your own building and on adjoining ones.

Geotechnical survey

Geotechnical investigation of the subsoil — bearing capacity, groundwater, soil strata. The basis for designing any ground slab.

Condition survey

Photo and measurement documentation of neighbouring buildings before work starts — relevant for insurance and strongly recommended when excavations come close to neighbouring houses.

Strip foundation

A linear foundation beneath load-bearing walls — standard in Vienna's old buildings, often of rubble stone without steel; an alternative to the ground slab for some new builds.

Frost depth

The depth to which ground frost penetrates — in Vienna generally taken as at least 80 cm. The frost skirt and foundations must reach at least that depth.

Timber joist floor (Tramdecke)

Timber-beam floor in Gründerzeit buildings — transfers loads differently from a reinforced concrete floor; relevant when an existing building is altered and a new basement slab is put in.

MA 37

Building authority — responsible for building permits and building notifications in Vienna, for example for new builds, extensions and interventions in the load-bearing structure.

MA 19

Architecture and urban design — involved in Vienna when building projects affect the townscape, for example in conservation zones.

ÖNORM B 2110

Standard for construction contracts — governs fixed-price quotations, penalties, handover records and warranty in the Austrian construction industry.

Comparison of the options

ExecutionPrice netConstruction timeSuitable forTypical propertyRecommendation
Unreinforced slab110–190 €/m²around 1 weekGarden house, outbuilding, carportOutbuildingsOnly without residential use
Reinforced slab, uninsulated150–260 €/m²1–2 weeksGarage, workshop, storageGarage to hallEconomical for unheated buildings
Reinforced slab with insulation180–380 €/m²2–4 weeksHeated residential building, prefabricated houseDetached house, terraced house, extensionStandard for residential buildings
Foundation slab as a watertight concrete tank280–520 €/m²3–6 weeksHigh groundwater levelDetached house to multi-occupancy buildingWhere there is groundwater
Slab above an underground car park or basement220–420 €/m²according to structural calculationsDesigned as a load-bearing floorMulti-occupancy building, underground car parkSpecial case
Micropiles beneath the slabfrom €850/unit1–3 weeks extraSubsoil without bearing capacityAll structuresOnly after a geotechnical survey
Lifting injection in existing buildingsfrom €320/lin. m1–3 weeksMinor settlement, small voidsDetached house, terraced houseMinimally invasive
Underpinning (related service)from €1,450/lin. m8–16 weeksOld foundations too shallow, additional storeyDetached house to tenement buildingNot a ground slab but foundation strengthening

Worked examples – typical sample calculations, not client projects

Worked example 1 · Detached house

Insulated slab 110 m²

  • Assumption:Detached house without a basement, load-bearing soil, no groundwater
  • Scope:Hardcore sub-base, blinding layer, damp-proofing, XPS, reinforcement, C25/30 concrete, frost skirt 44 lin. m, foundation earth electrode
  • Duration:2–4 weeks including curing
  • Calculation:110 m² × around €443/m² as in the worked example above
≈ €48,700 net
Worked example 2 · Garage

Double garage 36 m², reinforced

  • Assumption:free-standing garage, uninsulated, load-bearing soil
  • Scope:Hardcore sub-base, blinding layer, reinforcement, 20 cm concrete, drainage channel in front of the door
  • Duration:1–2 weeks
  • Calculation:36 m² × €150–260/m²
≈ €5,400–9,400 net
Worked example 3 · Garden shed

Unreinforced slab 12 m²

  • Assumption:Outbuilding without heating and without residential use
  • Scope:Gravel bed, blinding layer, 15 cm concrete, edge formwork
  • Duration:a few days plus curing
  • Calculation:12 m² × €110–190/m², towards the upper end because of fixed costs
≈ €1,300–2,300 net
Worked example 4 · Prefabricated house

Prefabricated-house slab 130 m² to the manufacturer's drawing

  • Assumption:The manufacturer's slab drawing is available, tight dimensional tolerances
  • Scope:insulated, reinforced slab with frost skirt, conduits and drainage exactly to the factory drawing
  • Duration:2–4 weeks
  • Calculation:130 m² × €180–380/m²
≈ €23,400–49,400 net
Worked example 5 · Groundwater

Watertight concrete tank 90 m²

  • Assumption:high groundwater level, assumed in a location close to the Danube
  • Scope:Foundation slab of WU concrete to the ÖBV guideline, waterstops, dewatering during construction
  • Duration:3–6 weeks
  • Calculation:90 m² × €280–520/m²
≈ €25,200–46,800 net
Worked example 6 · Slab over a basement

Load-bearing slab 60 m²

  • Assumption:Slab over a basement, designed as a load-bearing floor
  • Scope:Formwork, reinforcement to the structural design, concrete, waterproofing of the top surface
  • Duration:according to the structural design and construction sequence
  • Calculation:60 m² × €220–420/m²
≈ €13,200–25,200 net
Worked example 7 · Existing building

New basement slab 40 m²

  • Assumption:Old cellar with a brick floor, ground moisture, no groundwater
  • Scope:Removal of the old floor, excavation in sections, blinding layer, damp-proofing, 20 cm reinforced slab
  • Duration:3–5 weeks
  • Calculation:40 m² × €150–260/m² for the slab, demolition and removal charged additionally according to effort
≈ €6,000–10,400 net + demolition
Worked example 8 · Related service

Underpinning 18 lin. m in an old building

  • Assumption:existing strip foundation too shallow, the structural engineer requires it to be taken deeper
  • Scope:section by section in stages according to the staging plan, condition survey, settlement monitoring
  • Duration:several weeks depending on the number of stages
  • Calculation:18 lin. m × from €1,450/lin. m — not a ground slab but foundation strengthening
from ≈ €26,100 net

Why small slabs cost more per square metre

Anyone who reads the price table above and then does the maths for a 12 m² garden house often comes out below the quotation. The reason lies in the fixed costs that arise for every slab: bringing in the excavator and vibrating plate, setting out, formwork all round, the minimum order of ready-mixed concrete and the pump if the mixer truck cannot drive right up. Spread over 12 m², these items weigh heavily; over 120 m², they hardly matter.

A second factor is the edge. A small slab has a large perimeter in relation to its area, and it is precisely the edge that is labour-intensive: formwork, edge insulation and, for residential buildings, the frost skirt. That is why an unreinforced slab for an outbuilding, although in the range of €110 to €190/m² net, tends towards the upper end for very small areas. The same applies, by analogy, to a garage with reinforcement within the range of €150 to €260/m².

Practical advice: if several small areas are due on the plot – garden house, bin store, parking space – it is worth having them concreted together. The travel and pump costs are then incurred only once. For simple pad or strip solutions for lightweight structures, see foundations.

Ground slab for a prefabricated house: what the manufacturer expects from you

Many prefabricated house manufacturers supply the house from the top edge of the ground slab. The slab itself is then work to be provided by the client, commissioned separately – and for which the manufacturer sets precise specifications. These specifications are often stricter than for a masonry house, because the prefabricated wall elements cannot compensate for inaccuracies.

Typical requirements include a certain flatness and dimensional accuracy of the outer edges, the position of all empty conduits and drainage connections according to the manufacturer's factory plan and sometimes an inspection before assembly. If a drain is a few centimetres away from the intended position, the prefabricated installation wall will not fit – and the correction is made with a breaker in fresh concrete.

That is why, before quoting, we ask for the manufacturer's slab plan, not just the submission plan. It shows dimensions, penetrations and tolerances. Only then can a fixed price be calculated that will not grow later through variations. If you first need the excavation or soil replacement, you will find details under excavation.

Laying concrete slabs is not the same as a ground slab

Some of the enquiries on this topic actually mean something quite different: laying concrete paving slabs for a terrace, garden path or driveway. Here, precast concrete slabs are laid on a bed of grit or mortar. That is paving, not a foundation. Such a surface carries no building load and needs no reinforcement or frost skirt, but it does need a well-compacted, frost-resistant sub-base and the right fall.

The confusion is understandable, because both jobs start with excavation and gravel. After that they go their separate ways: the ground slab is cast on site from reinforced concrete and structurally designed, while concrete slabs in the garden are laid and jointed. Prices and build-ups for paths, terraces and driveways can be found on the paving page.

Related services Skyline Bau

Related services

◆ Partner company · Bling Premium Reinigung

Slab finished? A clean base for the fit-out.

Before insulation and screed, the slab must be clean and free of mortar residue. Bling Premium Reinigung takes care of the rough cleaning of the shell surfaces. Find out more at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Ground slab Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your ground slab in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.