Call nowWhatsAppEmail
Skyline Bau · Drywall Vienna

Drywall Vienna that turns one room into two.

Drywall Vienna: from the construction company that does the work — not from an agent.

Drywall Vienna: drywall work in Vienna costs 40 to 120 euros per square metre net at Skyline Bau. Simple stud wall €40–60/m², double boarding with insulation €60–95/m², fire-rated or wet-room wall €80–120/m², suspended ceiling €50–90/m². We work with Knauf and Rigips systems, fill to quality levels Q1 to Q4 and hand over with photo documentation.

Drywall work in Vienna costs €40 to €120 per square metre net, including material and labour. A simple plasterboard stud wall costs €40 to €60/m², double-boarded with mineral wool €60 to €95/m², fire protection F30 to F90 and wet-room walls €80 to €120/m². Suspending a ceiling costs €50 to €90/m², pre-wall installations €190 to €340 per linear metre. An average Viennese project with 40 m² of wall area is finished in three to five working days.
✓ Knauf and Rigips systems✓ Fire protection F30–F90✓ Sound insulation ÖNORM B 8115✓ Filling quality Q1–Q4✓ Fixed price ÖNORM B 2110

Drywall Vienna: costs 2026

Prices for Vienna, as of 2026, net, including material, labour, offcuts and disposal. The difference between €40 and €120 per square metre is not arbitrary; it results from the boarding, insulation, fire-protection requirement and stud spacing.

ServiceBuild-upNet priceWhat for
Stud wall, single-boardedCW 75, 1 × 12.5 mm per side€40–60/m²Room divider without special requirements
Stud wall, double-boardedCW 75, 2 × 12.5 mm, mineral wool€60–95/m²Standard in residential construction, good sound insulation
Fire-rated wall F30 to F90Special boards, tested system build-up€80–120/m²Escape routes, separation between apartments, plant rooms
Wet-room wallImpregnated boards, primer€70–105/m²Bathroom, WC, laundry room
Double stud wallTwo separate stud frames€95–140/m²Party wall between apartments, medical practice, recording studio
Lining wall on an existing wallCW 50 or direct hangers€35–70/m²Straightening crooked period walls, routing pipes and cables
Suspended ceilingCD profiles, 1 × 12.5 mm€50–90/m²Concealing pipes and cables, adjusting height
Acoustic ceilingPerforated board with fleece€95–160/m²Office, medical practice, restaurant
Boarding a sloping roofVapour retarder, counter-battens, board€65–110/m²Loft conversion
Pre-wall installation, bathroomStud frame with cistern element€190–340/lin. mConcealing sanitary installations
Fitting an access panelAluminium, plasterboard-faced€140–320/pcAccess to valves and shafts
Installing a door frameUA profile, reinforcement€180–420/pcStructurally required depending on door leaf weight
Filling Q3 instead of Q2Additional pass+€6–12/m²Grazing light, glossy paints
Filling Q4Full-surface, sanded+€14–24/m²Gloss paints, metallic wallpapers, large window areas
Site setup, protection, cleaninglump sum350–900 €Covering the staircase, dust protection, final cleaning
Drywall Vienna: costs 2026 – net price overview
Drywall Vienna: the prices from the table at a glance, as of 2026, net.
Worked example · period apartment, two new rooms
38 m² double-boarded stud wall€2,850
2 door frames with reinforcement€620
Q3 filling on the entire surface€340
Site, protection, disposal€560

Total around €4,370 net, construction time four working days. Painting and floors are not included; we hand over ready for finishing or, on request, ready for painting.

Why the price ranges are so wide

  • Boarding. Single or double determines material, labour time and filling area. Double-boarded means twice as many joints, but considerably better sound and fire protection.
  • Stud spacing. 62.5 cm is standard. For heavy loads or high walls it is reduced to 41.7 cm – that costs a third more profile and time.
  • Wall height. Above 2.80 m the profile type and structural design change. Viennese period buildings with ceiling heights of 3.20 to 4.00 m need CW 100 instead of CW 75 and often reinforcement.
  • Requirement. A tested F90 wall is a system of board, profile, screw, insulation and joint – none of it can be freely swapped. That is why it costs twice as much as a simple wall.
  • Substrate. Crooked period walls and uneven floors need levelling. Ten centimetres of unevenness over three metres is no exception in Gründerzeit buildings.
  • Accessibility. Fourth floor without a lift: boards 2.50 m long and 25 kg carried up the stairs, plus a parking-lane permit from MA 46. That adds €400 to €1,200.
  • Filling quality. Q2 is standard, Q3 for grazing light, Q4 for gloss paint. From Q2 to Q4 the filling effort doubles.

Partition walls: which type for what

Partition wall, plasterboard wall, stud wall, lightweight wall, metal stud wall – usually they all mean the same component, just with different names. The difference that counts lies in the build-up.

Construction typeBuild-upSound insulationNet priceWhat for
Single-boarded stud wallCW 75, one board per sideapprox. 40–44 dB€40–60/m²Room divider within an apartment
Double-boarded stud wallCW 75, two boards per side, mineral woolapprox. 50–55 dB€60–95/m²Bedroom, office, children’s room
Double stud walltwo separate stud framesapprox. 60–65 dB€95–140/m²Separation between apartments, medical practice, music room
Fire-rated wall F30 to F90tested system build-up, special boardsdepending on build-up€80–120/m²Escape route, plant room, separation between apartments
Wet-room wallimpregnated boards, waterproofingsame as standard€70–105/m²Bathroom, WC, laundry room
Masonry partition wallBrick or aerated concrete, plasteredapprox. 40–48 dB€130–220/m²when heavy loads or moisture require it
The masonry wall is not automatically the better wall. At the same price, a double-boarded stud wall with insulation achieves more sound insulation than a 10 cm brick wall – and it is finished in two days instead of two weeks plus drying time. Only one thing speaks against the drywall wall: when heavy loads are to hang on it and no cross-members were planned. That is why it must be clarified before the stud frame goes up what will later go on the wall – wall cabinet, washbasin, television, wall bed.
Question before constructionWhy it is asked now
What will hang on the wall later?A cross-member or mounting board must go into the stud frame
Does a pipe or cable run through it?Define stud spacing and penetrations
Which room is behind it?determines sound insulation and build-up
Will there be a door in it?UA profiles as door header construction, cannot be retrofitted
Will it be tiled?Wet-room board, thicker boarding, waterproofing
Does the wall have to be fire-resistant?tested system build-up, no mixture of leftovers

The door question is the one most often reworked. A door opening in drywall needs reinforced UA profiles running from the floor to the structural ceiling. If this is forgotten, the frame wobbles after six months – and by then the wall has already been filled and painted.

The build-up of a drywall wall, layer by layer

What looks like a simple board on a profile is a tested system. Every deviation – wrong screw length, missing sealing tape, boards without staggered joints – costs sound or fire protection.

Sealing tapeUnder every UW profile, at wall and ceiling. Without sealing tape, sound travels through the structure and the wall never achieves its test value.
UW and CW profilesUW as floor and ceiling track, CW as studs at a spacing of 62.5 cm or 41.7 cm. Profiles are not screwed together but set into the track – the wall must be able to move.
Reinforcement at openingsDoors get UA profiles made of 2 mm steel with floor angles. Anyone who hangs a frame only on CW profiles gets cracks above the door header.
Installation zoneElectrical and plumbing lines run through the punched openings in the profiles, with protective grommets. No cable may be crushed or run over a cut edge.
InsulationMineral wool of the right thickness, clamped in place, without gaps. Voids in the insulation cost more sound insulation than any other carelessness.
BoardingBoards with staggered joints, screws every 25 cm, edge distance 10 mm, screw head slightly countersunk. The second layer always staggered relative to the first.
Joints and fillingJoint tape or tapered edge, then filler in two to three passes, allowed to dry in between, sanded at the end.
Perimeter jointsAt ceiling, floor and adjoining wall a movement joint with permanently elastic material is used – the structure moves there, and a rigid filled joint would crack.

Filling quality Q1 to Q4: what you really need

The most common cause of disputes after drywall work is the surface. “Fully filled” does not exist – there are four defined levels, and the level must be specified before the contract is awarded.

LevelWhat is doneSuitable forSurcharge
Q1Joints and screw heads filled, burrs removedSurfaces that will be covered: behind tiles, pre-walls, false ceilingsBase price
Q2Additionally filled wide, transitions smoothedStandard for living spaces with woodchip or matt paintincluded in the price
Q3Additionally wider application, pores closedGrazing light, satin paints, fine wallpapers+€6–12/m²
Q4Full-surface filling, sandedGloss paint, metallic wallpapers, large window areas with low-angle light+€14–24/m²

The honest recommendation: in a normal living room with a ceiling light, Q2 is perfectly sufficient. Q4 is worthwhile when a large window front casts light sideways across the wall or you use gloss paint. Anyone who orders Q4 but paints matt has wasted money.

Fire protection: F30, F60, F90 and what is behind them

The designation states how long the wall retains its function in the event of fire – 30, 60 or 90 minutes. In Vienna, OIB Guideline 2 and the Building Code are decisive. What matters is: the value only applies to the tested overall build-up. Anyone who swaps a board for a cheaper make or leaves out the insulation no longer has an F90 wall but a wall without certification.

RequirementTypical build-upWhere required
F30 (REI 30)CW 50/75, 1 × 12.5 mm fire-protection board per side, mineral woolSeparation within one unit of use, plant rooms
F60 (REI 60)CW 75, 2 × 12.5 mm fire-protection board, non-combustible mineral woolIncreased requirements, commercial use
F90 (REI 90)CW 100, 2 × 15 mm fire-protection board, A1 insulation, special screwsWalls between apartments, escape routes, shaft walls
Shaft wallBoarded on one side, F90 from outsideInstallation shafts in the staircase
  • Penetrations are the weak point. Every cable and every pipe through a fire-rated wall needs an approved fire stop – fire collar or fire-stop compound. A simple hole filled with plaster destroys the certification.
  • Perimeter joints at ceiling and wall are backed with fire-stop compound and mineral wool strips, not with acrylic.
  • Documentation is part of it. You receive from us the system number, the test certificates of the boards used and photos before closing. Without them the wall cannot be verified in an emergency – and the insurer will ask questions.
  • Electrical boxes in fire-rated walls are installed offset, never opposite each other, and with a fire-protection insert.

Sound insulation: why the neighbouring apartment can hear you

The decisive standard is ÖNORM B 8115. For walls between apartments in new buildings, a weighted sound reduction index of at least 55 dB applies; for walls within one apartment considerably less. A good double-boarded stud wall with mineral wool achieves 50 to 55 dB – more than a 12 cm brick wall.

Build-upSound reduction index RwIn practice
CW 50, single-boarded, without insulationapprox. 33 dBConversation next door understandable
CW 75, single-boarded, with insulationapprox. 44 dBConversation audible, not understandable
CW 75, double-boarded, with insulationapprox. 52 dBQuiet in the next room, standard in residential construction
Double stud wall, double-boardedapprox. 60–65 dBSeparation between apartments, medical practice, music room

The four most common mistakes that ruin any test value: missing sealing tape, sockets directly opposite each other on the same axis, a rigid connection between the two stud frames of a double wall, and pipes or cables running across the wall. We set boxes offset, seal every penetration and consistently separate the stud frames.

Wet rooms: bathroom, toilet, laundry room

In wet areas, impregnated boards are used, recognisable by their green colour. They are water-repellent but not waterproof – the watertightness comes from the bonded waterproofing under ÖNORM B 3407, which is applied before tiling. Anyone who only installs impregnated boards in the bathroom and tiles on them does not have a watertight bathroom. Details can be found on our page Bathroom Renovation Vienna.

  • Stud spacing 41.7 cm in the area of heavy sanitary fixtures so that the boarding does not flex.
  • Install cross-members where grab rails, wall cabinets or a washbasin will later be mounted. That costs nothing during construction and half a day later.
  • Floor connection with a gap to the screed so that standing moisture is not drawn into the board.
  • Cement-bonded boards instead of plasterboard when the wall is permanently exposed to moisture, for example in commercial showers.

Suspended ceilings

In Viennese period buildings the most common job after the stud wall: hiding pipes and cables, bringing a ceiling height of 3.80 m down to a homely level, accommodating recessed lights or covering a damaged Dippelbaum (timber log) ceiling.

Suspended ceiling

CD profiles on nonius or direct hangers, €50–90/m². Distance to the structural ceiling freely selectable, from 6 cm for recessed lights, from 12 cm for ventilation ducts.

Directly boarded ceiling

Resilient bars directly on the structural ceiling, €40–70/m². Only 3 to 4 cm loss of height, but noticeably improves impact sound from the apartment above.

Acoustic ceiling

Perforated boards with acoustic fleece, €95–160/m². Reduces reverberation time in offices, medical practices and restaurants. Only works with sufficient cavity and an insulation layer.

Fire-rated ceiling

Independent classification, often F30 from below. Required for garages under living spaces and for basement ceilings in escape routes.

With timber beam ceilings in period buildings, suspension must be planned with particular care: the ceiling moves with the seasons. Rigid fixing leads to cracks at the perimeter joints. There we use resilient bars and deliberately leave the joint to the wall open as a movement joint, with a shadow gap or closed elastically.

Heating and cooling ceilings

A heating and cooling ceiling is a suspended plasterboard ceiling with water-carrying registers embedded in it. It heats in winter, cools in summer and takes up no space on the walls.

PointHow it worksWhat this means
PrincipleRadiant heating or radiant cooling via the ceiling surfaceno draughts, no radiators on the walls
Flow temperaturelow, suits a heat pumpefficient, but only sensible with an insulated building envelope
Cooling modeThe dew point must not be undershotControl with humidity sensor is mandatory
Build-upRegisters between profiles, plasterboard underneathLoss of height 10 to 16 cm
Coverage60 to 80 per cent of the ceiling area activePlan lights and ventilation outlets in advance
PriceCeiling build-up plus registers and connection€180–320/m² active area
The critical point is cooling, not heating. If the ceiling is cooled below the dew point, moisture condenses on the surface – and on a plasterboard ceiling that is not a cosmetic problem but structural damage. That is why every cooling ceiling needs a control with dew-point monitoring, and why in rooms with a high moisture load, such as kitchens, the ceiling is either designed differently or not operated actively at all. We build the drywall part; registers and system technology are handled by the licensed partner company.

Where it is only about cooling without converting the building services, air conditioning is the simpler solution. The heating and cooling ceiling is worthwhile where a heat pump is coming anyway, the ceiling is being suspended anyway and the wall surfaces are to remain free – typically in medical practices, law firms and high-quality renovated apartments.

Shaft cladding and installation shafts

Every riser replacement in an apartment block creates the same task: the new risers must be enclosed – tight, fire-resistant, acoustically decoupled and accessible again later.

RequirementExecutionWhy
Fire protectionShaft in F30 to F90, fire stop at every floor slabthe shaft connects all floors
Sound insulationPipes fixed with decoupling, insulation in the shaftotherwise the neighbouring apartment hears every flush
Inspection accessPanel in front of shut-off valves and manifoldswithout access, the next repair becomes a construction job
Dimensionsas tight as possible, as large as necessaryevery centimetre is taken from the bathroom
Surfaceready for tiling or filled to Q3depending on the connection to the room design
Price€110–260/lin. m of shaft heightdepending on fire-protection class and accessibility
The access panel is the point where people save money – and where it later becomes most expensive. A bricked-up shaft without access means: at the next drip, it is chiselled open, retiled and repainted – for a job that would otherwise have taken twenty minutes. A panel costs 180 to 520 euros. As a matter of principle we place one in front of every shut-off valve and every manifold and record their positions in the handover report.

Attic floor and sloping roof

In an attic conversion, the drywall is the visible part of a build-up that above all has to do one thing: keep the moisture from the living space away from the insulation. The order from inside to outside is boarding, installation zone, vapour retarder, insulation, counter-battens, roof underlay.

  • The vapour retarder is decisive. Every penetration – cable, pipe, screw through the membrane – is closed with tape and a sleeve. A leaking vapour retarder leads within two winters to damp insulation and blackened rafters.
  • Installation zone of 4 to 6 cm in front of the vapour retarder: cables and boxes run there without piercing the membrane. Anyone who saves on this zone is saving in the wrong place.
  • Choice of board: normal plasterboard on the slope, impregnated in the bathroom under the roof, gypsum fibreboard where stability requirements are higher.
  • Collar beams and knee walls must be formed neatly, otherwise a crack forms at the transition between slope and knee wall.

If you are converting an entire attic floor, drywall is only one trade out of eight. How the whole project runs is described on Attic Conversion Vienna.

Attic conversion in drywall construction

Converting an attic is largely drywall work: insulation between and below the rafters, vapour retarder, boarding, partition walls, suspended ceilings, dry screed. What matters is the order of the layers.

LayerTaskCommon mistake
Between-rafter insulationThermal insulation in the rafter planeInsulation stuffed in instead of fitted snugly
Vapour barrierkeeps room moisture out of the structureJoints and connections not taped airtight
Installation zoneRouting cables and pipes in front of the vapour retarderCables drilled through the retarder
Below-rafter insulationreduces the thermal bridge at the rafteromitted for lack of space, rafter shows through
BoardingSurface, fire protection, stabilitytoo thin for the rafter spacing
Dry screedFloor build-up without wet screedSubstrate not levelled
An attic conversion stands or falls with airtightness. Every leak in the vapour retarder lets warm room air into the structure, where it cools and releases its moisture into the timber. The result shows after two to four years as mould on the insulation or a rotten spot on the rafter – invisible under the finished lining. That is why connections are taped, penetrations are made with sleeves and, on request, checked with an airtightness test.

If it is only about fitting out within the existing roof covering without changing the building envelope, it is drywall work and usually exempt from procedure or subject to notification. If the roof is raised, dormers are added or the number of storeys changes, it is a building project requiring a permit – that is covered on the page Attic Conversion with costs, procedure and structural engineering.

Service in the atticNet price
Between-rafter insulation with vapour retarder€55–110/m²
Below-rafter insulation with boarding€45–85/m²
Sloping roof boarded and filled Q2€50–95/m²
Knee wall€55–105/m²
Dry screed on loose fill€65–120/m²
Airtightness test€480–1,200 per measurement

Drywall planning

For larger projects, planning decides half of the costs. What is specified beforehand costs a drawing; what is noticed afterwards costs site work.

Planning stepWhat is specified
Wall types per roomBuild-up, sound insulation, fire-protection class
Connection detailsWall to ceiling, wall to facade, floor connection
Doors and openingsReinforcements, header construction, type of frame
Load planwhere cross-members for wall cabinets, washbasin, television are located
Installation zoneCable and pipe routes, boxes, penetrations
Reflected ceiling planLights, outlets, access panels, joints
Surface qualityQ1 to Q4 per surface, matched to light and paint
Construction sequenceOrder with electrics, plumbing, painting
The reflected ceiling plan is the document that saves the most discussions. It shows where every light, every ventilation outlet, every detector and every access panel is located – coordinated with the substructure. Without it, the ceiling is closed and drilled afterwards, and the drill hits the profile or the cable. For medical practices, offices and restaurants it is standard; for apartments it is worthwhile from about three rooms with suspended ceilings.

Drywall in Viennese period buildings: five special features

1. Nothing is straight

Gründerzeit walls deviate by 5 to 15 cm over three metres, and floors slope towards the middle. A lining wall compensates for this but costs space: 5 cm of levelling on both sides means 10 cm less room. We measure beforehand with a laser and say honestly what the levelling costs – even when the answer is that a wall should stay crooked.

2. Ceiling heights over three metres

Above 2.80 m, CW 75 is no longer sufficient. CW 100 or double profiles are used, often with horizontal bracing. That is not an arbitrary surcharge but structural necessity: a 3.80 m high wall with too weak a profile vibrates when a door slams.

3. Timber beam ceilings

They have limited load-bearing capacity and they move. Walls must not be placed centrally on a beam without checking the load distribution. For larger projects we bring in structural engineering via a licensed partner company.

4. Listed buildings and stucco

Where stucco ceilings have been preserved, nothing is suspended; instead a lining is run only along the walls and the ceiling is left free. In conservation zones, MA 19 must be involved in any intervention affecting the appearance.

5. Narrow staircases

Plasterboard sheets are 2.00 to 3.00 m long and weigh up to 30 kg. In a building without a lift, the staircase determines the board length. We then deliver 2.00 m boards – more joints, but feasible at all.

Board guide: which board for what

“Rigips” is a brand name, not a type of material – just as Tixo is for adhesive tape. In fact, there are half a dozen board types, and the choice determines fire protection, moisture resistance and load-bearing capacity.

Board typeMarkingUseLimit
Standard plasterboardGKB, grey paper faceDry living spaces, ceilings, lining wallsNot in wet rooms, no fire-protection certification on its own
Fire-protection boardGKF, red printF30 to F90 in a tested build-upOnly in a system with matching profile and insulation
Impregnated boardGKBI, green paper faceBathroom, toilet, kitchen, laundry roomWater-repellent, not waterproof – waterproofing remains mandatory
Impregnated fire-protection boardGKFI, red and greenWet room with fire-protection requirementMore expensive, only where both are required
Gypsum fibreboardhomogeneous, no paper faceHigher load capacity, dry screed, attic conversionHeavier, harder to cut, more expensive
High-density gypsum boardcompacted coreImpact-prone areas, staircase, school, medical practiceHigher price, heavier
Cement-bonded building boardgrey, mineralPermanently wet areas, outdoor areas, tile backerConsiderably more expensive, more laborious to work with
Acoustic perforated boardperforated with fleeceReducing reverberation in offices, medical practices, restaurantsOnly works with a cavity and an insulation layer

For a normal Viennese room wall, 12.5 mm GKB is the right choice, double-boarded. In the bathroom GKBI, in the escape route GKF, under tiles in the shower ideally the cement-bonded board. We write the type into the quote so that nobody has to guess later what is in the wall.

How much can such a wall hold?

The most common worry before the first drywall project: “I won’t be able to hang anything on it.” Yes you can – if you know how and, above all, if you say so beforehand.

LoadFixingLoad capacityExample
LightPlasterboard plug in single boardup to 15 kgPicture frame, small shelf, towel rail
MediumCavity plug in double boardingup to 40 kgHanging shelf, mirror cabinet, small flat screen
HeavyScrewed directly into the CW profileup to 70 kgTelevision, wall shelf with books
Very heavyBuilt-in cross-member or timber noggin150 kg and moreKitchen wall units, washbasin, wall bed, grab rails
Continuous bracket loadSystem carrier in the stud frameaccording to manufacturerWall-hung toilet, wall-mounted washbasin

The decisive sentence during the survey is therefore: tell us what will hang where later. A cross-member costs €20 to €40 during construction. Afterwards the wall has to be opened, reinforced, closed, filled and painted – €300 and three days.

What else is possible with drywall

Lining wall

Straightening a crooked period wall, routing cables and pipes, insulating. €35–70/m², build-up from 5 cm. The fastest way to a straight wall without plastering.

Installation shaft

Enclosing risers, with access panel and F90 if required. Standard in every riser replacement in an apartment block.

Niches and shelves

Wall niche in the bathroom, shelf compartment in the living room, window seat. Costs little to build if it is planned together with the stud frame.

Indirect lighting

Light coves in the suspended ceiling, shadow gaps as the transition to the wall. Electrics are handled by the licensed partner company.

Room-in-room

Meeting box in the office, server room, music room. Double stud wall with decoupled ceiling, 60 to 65 dB.

Platform and steps

Raised level for beds or seating areas, covered with gypsum fibre or dry screed boards.

Building physics: moisture, heat, movement

Why vapour retarders are doubly important in period buildings

Warm indoor air carries moisture. If it meets cold components inside the wall build-up, it condenses. With an interior wall between two heated rooms this does not matter. With a lining wall on a cold external wall or on a sloping roof it does: there a vapour retarder belongs on the warm side of the insulation, otherwise the insulation gets wet and the structure goes mouldy – invisibly, behind the board.

Lining wall on an external wall: caution

Internal insulation is more demanding in terms of building physics than external insulation, because the wall is colder afterwards. In a Viennese Gründerzeit building with a stucco facade, however, internal insulation is often the only option. Then the rule is: capillary-active system or tested vapour retarder, clean connection to window reveals and ceilings, no cavities. Anyone who installs internal insulation without a concept produces mould behind the wall. We calculate this in advance and tell you if facade insulation would be the better solution.

Movement joints

Every building moves. Drywall must be able to absorb this movement, otherwise it cracks. Connections to solid components are made as separating joints, and large surfaces from about 15 m in length get their own movement joint. With timber beam ceilings this is not optional but mandatory – the ceiling rises and falls by several millimetres with the seasons.

Saving: sensible, wrong, expensive later

Sensible savings

Filling quality Q2 instead of Q3 if painting matt. Single boarding where no sound insulation is needed. Keeping the existing wall layout. Painting yourself.

Wrong savings

Leaving out sealing tape, skimping on insulation, thinner profiles from the DIY store, doors without UA reinforcement, replacing fire-protection boards with standard boards.

Expensive later

No cross-members for wall cabinets, no access panel on the shaft, pipes closed in without photo documentation. All three cost many times more at the next intervention.

Getting subsidies

As part of a subsidised renovation, drywall work can be partially subsidised, for example in an attic conversion or in the base renovation (Sockelsanierung) via wohnfonds_wien.

Three examples from practice

Example 1 · Dividing a room in the 16th district

A 34 m² Gründerzeit room with a ceiling height of 3.60 m was to become two rooms. Work carried out: 16 m² CW 100 stud wall, double-boarded with 60 mm mineral wool, one door opening with UA reinforcement, Q2 filling, connections as separating joints because of the timber beam ceiling. Construction time three working days, cost €1,980 net. Sound insulation measured after completion: conversations in the next room no longer understandable.

Example 2 · Fire protection in the staircase, 1100 Vienna

Property management, requirement after inspection: the installation shaft in the escape route had to be F90. Work carried out: shaft wall with 2 × 15 mm fire-protection board, A1 insulation, tested EI 90 access panel, all penetrations sealed with approved collars. Handover with system number, test certificates and photo documentation of every fire stop. 22 m², cost €2,640 net, four working days.

Example 3 · Medical practice in the 9th district

Conversion during ongoing operations; work was done from 5 pm and on Saturdays. Work carried out: 48 m² double stud wall for treatment rooms with increased sound insulation, 60 m² acoustic ceiling with perforated boards, light coves, lining walls on two external walls. Total cost €14,800 net, construction time three weeks in evening shifts. The practice was not closed on a single working day.

The common denominator of these three projects: the price was fixed before the first profile went up, and there were no change orders. That is exactly what we mean by a fixed price under ÖNORM B 2110.

The standards we work to

Drywall looks simple but is tightly regulated. These standards and guidelines determine what is permissible and what applies in the event of a dispute.

Set of rulesWhat it is aboutSignificance for your project
ÖNORM B 2110Contract standard for construction worksBasis for quote, invoicing, acceptance and deadlines
ÖNORM B 3415Drywall work, contract standardGoverns execution, measurement and invoicing in drywall
ÖNORM B 8115Sound insulation in building constructionMinimum values for walls between apartments and room walls
OIB Guideline 2Fire protectionSpecifies where F30, F60 or F90 is required
ÖNORM DIN 18202Tolerances in building constructionPermissible flatness of walls and ceilings
ÖNORM B 3407Bonded waterproofingMandatory for tiles on drywall in wet areas
Vienna Building CodePermit requirementDecides whether a wall requires notification or a permit

In the quote we state the standard according to which invoicing is done and which requirement each wall meets. That is not paper for the filing cabinet: if someone later asks why the wall cost €95 instead of €55 per square metre, the answer is there.

Measurement and invoicing: how areas are calculated

The most common point of dispute after completion is not the price per square metre but the quantity. Under the rules of ÖNORM B 3415, simplified:

  • The finished wall area is measured as length times height; boarding on both sides counts once.
  • Small openings are measured over. A door opening below a certain size is not deducted, because cutting around it is more work than the continuous surface. That is not trickery but a rule of the standard – it should, however, be explained in the quote.
  • Larger openings are deducted, and the reveal is charged separately instead.
  • Reinforcements, cross-members and access panels are separate items, not ancillary services.
  • Joint measurement. We measure together with you at acceptance and hand over the measurement sheet.

If one quote is significantly cheaper than the others, it is worth looking at the quantities: often less area has simply been entered there, and the difference comes at the end as a change order.

Scheduling: why drying cannot be accelerated

Installing a wall is quick. What takes time is the filling. Each pass has to dry through before the next one – at 20 °C and normal humidity that is 12 to 24 hours per layer. Anyone who fills faster gets cracks and shrinkage spots that become visible in the first grazing light.

ProjectInstallationFilling incl. dryingTotal
One room wall, 15 m²1 day1.5 days2–3 working days
Partitioning two rooms, 40 m²2 days2 days4–5 working days
Suspended ceiling, 30 m²1.5 days1.5 days3–4 working days
Attic floor, 90 m²5–6 days3–4 days9–12 working days
Medical practice with acoustic ceiling, 110 m²8–10 days4–5 days3 weeks

In winter and in unheated shell buildings, drying takes longer. We factor this in instead of promising a date that only holds under ideal conditions.

Interfaces with the other trades

Drywall rarely stands alone. The order decides whether everything fits together at the end or whether someone has to open up a finished wall again.

Before the drywallDemolition and stripping out completed, screed laid and at least partially dried, windows sealed. Nobody fills sensibly on an open site in winter.
During the stud frameElectrics and plumbing pull in their lines – via licensed partner companies. Then photo documentation, and only then is it closed.
After the first layerCheck the insulation, set cross-members for later loads, form window reveals.
After the drywallThe painter primes and paints, the tiler works on the impregnated board after prior waterproofing, the floor layer comes last.
At the very endHang door leaves, skirting boards, final cleaning. Only then can you see whether the flatness is right – that is why we check beforehand with grazing light.

When we work as the coordinating construction company, this is exactly our task: that nobody waits for anybody else and nobody has to come twice. What else we carry out is listed on the page Services.

Disposal and handling of material

Plasterboard is construction waste and must be disposed of separately – not in the residual waste container and certainly not in the building’s household waste. We provide our own container or take the offcuts with us on smaller sites; the disposal certificate is part of the final invoice.

  • Offcuts are below 10% with clean planning. We plan board lengths so that as few cross joints as possible occur – that saves material and filled joints.
  • Leftovers from standard boards are kept on larger projects – for repairs from the same batch.
  • Mineral wool is collected separately; it must not be mixed with gypsum waste.
  • Containers in Vienna need a permit from MA 46 when placed on public land. We take care of that too.

What you receive from us before signing the contract

  • Laser survey with photo report and recording of the unevenness of the existing structure.
  • Bill of quantities under ÖNORM B 2110 with system build-up, board type, profile type, insulation, filling quality and exclusions.
  • Construction schedule with installation and drying days, blocked periods and the date of acceptance.
  • Proof of construction liability insurance of €3 million and the proof of authorisation of the partner companies for electrics and plumbing.
  • For fire protection, additionally the system number and the test certificates of the boards to be used.
  • Payment schedule according to construction progress, with no blind advance payment.

How a drywall project runs

Day 0 · Survey and specificationWall layout, heights, fire and sound protection requirements, filling quality, position of doors and boxes. Laser survey, photo report, then a fixed price.
Day 1 · Protection and setting outCover the staircase and floors, dust-protection wall, mark the wall line on the floor and approve it with you before the first profile goes up.
Days 1–2 · Stud frameSealing tape, UW and CW profiles, door reinforcement, noggins for wall cabinets or a television.
Day 2 · Electrics and plumbingPull in the lines – via licensed partner companies – while the wall is open. Photos of every line before closing.
Days 2–3 · Insulation and first layerFit mineral wool clamped in place, first board layer with staggered joints.
Day 3 · Second layerStaggered relative to the first, screw spacing 25 cm.
Day 4 · FillingFirst pass with joint tape, after drying second and third passes, then sanding.
Day 5 · AcceptanceFlatness check with straightedge and grazing light, acceptance report, photo documentation, fine cleaning. Handover ready for finishing or ready for painting.

In occupied apartments we work with a dust lock and daily rough cleaning. It gets noisy when cutting profiles and sanding – usually two days.

The eight mistakes we most often have to correct

  • No sealing tape. Saves 40 cents per linear metre and costs half the sound insulation.
  • Sockets opposite each other. On the same axis on both sides, the wall becomes an intercom.
  • Door frame without UA profile. After a few weeks a crack runs diagonally from the upper corner of the door.
  • Board joints not staggered. A continuous cross joint through two layers – it will reliably crack.
  • Screwed too deep. The screw head pierces the paper face, and the board no longer holds at that point.
  • Rigid joint to the ceiling. Without a separating joint, the transition cracks as soon as the structure moves.
  • Insulation stuffed instead of clamped. Compressed mineral wool insulates worse, and voids even worse.
  • Fire-rated wall patched with standard boards. A single wrong board makes the test certificate worthless.

How to make three quotes comparable

Which system build-up?Profile type, stud spacing, number and thickness of boards, insulation with thickness. “Drywall wall” alone is not a description.
Which filling quality?Q1 to Q4 belongs in the quote. Without it you get Q2 – and argue about grazing light later.
Are door reinforcements included?UA profiles and floor angles are often charged separately.
Who disposes of the waste?Offcuts, packaging, container, certificate. For 40 m² of wall that is €250 to €600.
Fire and sound protection specified?If F30 or 52 dB is required, the quote must name the tested system build-up.
Is there a line “not included”?Painting, floors, electrics, door leaves – whatever is missing should be named.

Material: what we work with

Building componentWhat we useWhy
BoardsKnauf or Rigips, 12.5 and 15 mmBoth systems fully tested, spare parts and accessories available everywhere
ProfilesCW/UW galvanised, 0.6 mm; UA 2 mm at doorsThinner DIY-store profiles vibrate at ceiling heights above 2.80 m
InsulationMineral wool 40 to 100 mm, non-combustible A1Sound and fire protection in one, no smouldering in a fire
ScrewsDrywall screws 25/35/55 mm, phosphatedLength matched to the number of layers, otherwise the second layer does not hold
FillerJoint filler with reinforcing tape, finish coat for Q3/Q4One product per work step, no mixture from three manufacturers
Sealing tapeClosed-cell sealing tapeThe basis of every sound insulation value

We do not tie ourselves to one brand, but within one wall the system stays closed. For fire-rated walls this is not a preference but a condition for certification.

Who we work for

Private clients

Dividing a room, partitioning a walk-in wardrobe, suspending a ceiling, converting an attic. Clear price, clean site, the apartment stays habitable.

Developers and general contractors

Drywall as a subcontract with our own site management, on schedule, with fire-protection documentation and measurement under ÖNORM.

Property management companies

Shaft cladding, fire protection in the staircase, ceiling repairs after water damage. Weekly photo reports.

Offices and medical practices

Room division with sound insulation, acoustic ceilings, conversion during ongoing operations – including evenings and weekends.

Reference: Austrian Parliament building, Vienna

In 2022, as part of the Parliament renovation, we carried out drywall, painting and flooring work on the second basement level, commissioned by W+R Schirmungstechnik GmbH. A project with access control, fixed time windows and documentation that proves every work step. Anyone who works like that can also run an apartment site in Ottakring properly.

Drywall in the Viennese districts

The district decides less about the price than about the existing structure we encounter – and that determines the effort.

RegionTypical existing conditionWhat follows from it
1010 to 1090, GründerzeitTimber beam ceilings, high rooms, stuccoResilient bars instead of rigid suspension, forming stucco connections
1100 to 1150, mixedGründerzeit and post-war buildingsdifferent substrates, check fixing for each ceiling
1160 to 1190, hillside locations and villasVillas, attics, detached houseslots of sloping roof, insulation and airtightness in the foreground
1200 to 1230, new buildings and housing estatesReinforced concrete, prefabricated buildings, new-build apartmentsflat substrates, fast execution, sound insulation to the neighbouring apartment
Inner-city locations in generalnarrow access roads, no-stopping zonesMaterial delivered in stages, lift or staircase as the bottleneck

The prices are the same in all districts. Differences arise from delivery: a site on the fourth floor without a lift in a short-term parking zone takes more time than the same apartment on the ground floor with courtyard access. That is shown as a separate item in the quote and not hidden in the price per square metre.

Prices per square metre: with and without material

Quotes often become incomparable because they are calculated differently. Our prices are all-in prices, i.e. including material.

Calculation methodWhat is includedOrder of magnitude
All-in price, including materialProfiles, boards, insulation, screws, filler, labour, disposal€40–120/m²
Labour only, material provided by the clientLabour and installation€22–55/m²
Material share aloneBoards, profiles, insulation, small materials€14–40/m²
Skilled worker, hourly ratefor work that cannot be measured in m²€68–92/hr
Providing material yourself rarely saves what it promises. Anyone who buys boards and profiles themselves pays retail prices instead of trade terms, bears the risk of wrong quantities and types, and in the event of defects has shared responsibility: the company is liable for the workmanship, not for the material. It makes sense where leftover stock from a previous site is available or where a particular product is specified for visual reasons.

What drives up the price per square metre is not the boards but the number of corners, connections and openings. A straight wall over eight metres is cheaper per square metre than the same area spread over three short wall sections with two doors – same material, three times the time.

When you do not need us

A single 6 m² wall without special requirements is too small for a coordinating construction company – a one-person drywall installer is cheaper and quicker for that. It becomes worthwhile with several rooms, with fire or sound insulation requirements, when electrics and plumbing are involved or when documentation is needed. And if you only want to renew a ceiling because of water stains: first check whether the cause has been fixed – otherwise the stain will come back.

Drywall planning in the 18th district: what Währing’s buildings require

In the 18th district, two very different construction methods meet. Around Währinger Straße and Kutschkermarkt there are dense Gründerzeit apartment blocks with timber beam ceilings and ceiling heights of over three metres. In the Cottage quarter and towards Pötzleinsdorf, villas and detached houses predominate, many of them with a converted or convertible attic. For drywall in 1180 Vienna this means: before the first board is ordered, it must be clear what the wall stands on and what the ceiling hangs from.

Drywall planning therefore starts with a survey of the existing structure. With timber beam ceilings we clarify whether a new partition wall runs across or along the beams, because this determines whether it bears its load at points or distributed. In the villas it is more often about sloping roofs, airtightness and the question of how a new insulation layer connects to old wall plates. Many houses in the Cottage quarter are also in a conservation zone. Interior work is usually not affected by this, but a new dormer or roof window certainly is.

In the end the plan shows wall types per room, connection details to stucco and cornices, the position of reinforcements and the reflected ceiling plan. Only with these documents can a price be named that holds on site. If you are also considering the attic floor, you will find the processes under Attic Conversion in Vienna.

Drywall prices per m² with material: what is realistic in Austria

Anyone searching online for prices per square metre often ends up on German guides. Their figures cannot be transferred one to one. Austria has its own collective agreements, ancillary wage costs are distributed differently, and VAT is 20 per cent instead of 19. Some portals also quote gross prices, others net, and it is not always clear whether filling, disposal and small materials are included.

Our ranges are net guide values including material: a single-boarded stud wall costs €40–60/m², a double-boarded one with mineral wool €60–95/m², a suspended ceiling €50–90/m². These values refer to Viennese sites, i.e. delivery through the staircase, loading zones instead of courtyard access and noise restrictions in occupied buildings. On a freely accessible new-build site in the countryside the same build-up can be somewhat cheaper; in a top-floor apartment on the fifth floor without a lift, more expensive.

When comparing two quotes, a simple question helps: is the price per square metre an all-in price, or are filling level, corner protection, access openings and disposal added as separate items? Only when both quotes are calculated the same way does the figure mean anything. If painting is to follow, the costs for that are described under Painting Work.

Putting up a plasterboard wall: what a single wall costs

Many enquiries concern exactly one wall, for example to partition a children’s room off a large living room. A worked example with net guide values shows how the price is made up. It assumes a wall 3.6 metres long and 2.9 metres high, i.e. around 10.4 square metres, double-boarded with insulation and one door opening.

ItemQuantityGuide value net
Stud wall double-boarded, insulated10.4 m²625–990 €
Door opening with reinforcing profile1 pc180–420 €
Painting both sides of the wall20.8 m²250–580 €
Total–around €1,050–1,990

Not included are the door leaf and frame, sockets and a light switch in the new room. Electrical work is carried out by an authorised partner company and shown separately. It is striking that the wall itself costs only about half. The rest is in the opening and the surface, and that is exactly where cheap quotes differ from reliable ones. If a radiator is also in the way or the new room needs its own window, the partition wall becomes a small conversion that should be inspected beforehand. For such cases, Interior Fit-Out is the right page.

Drywall in the area around Vienna: what determines the costs in Lower Austria

In the Lower Austrian area around Vienna we mainly carry out drywall work in detached and terraced houses, for example in Mödling, Purkersdorf, Klosterneuburg or Korneuburg. Prices there are roughly at Viennese level; the same net guide ranges as in the table above apply, i.e. around €40 to €60/m² for a single-boarded and €60 to €95/m² for a double-boarded stud wall with insulation. What shifts the costs in the surrounding area is less the location than the task. Often it is about converting an attic floor with sloping roofs, knee walls and vapour retarder, which means more cutting and connection work than a straight partition wall in a city apartment. On the other hand, narrow staircases and loading zones are usually not an issue, and the material is delivered right to the door. For small jobs, travel weighs more heavily, so we like to combine several jobs into one appointment. More on building projects in the surrounding area is on the page Construction Company Lower Austria, and on converting the roof space on the page Attic Conversion.

Drywall near you: why short distances matter for small jobs

Anyone searching for a drywall installer nearby usually has a smaller job: a lining wall for pipes and cables, a suspended ceiling in the hallway, a wall dividing a children’s room. With such work, the actual installation is often done in one or two days, but there are drying times for the filling in between. The drywall installer therefore comes several times: to erect and board, to fill, to sand and for the second coat of filler. If the company is far away, each of these trips is paid for as well. That is why we work in Vienna and the immediate surrounding area and not beyond. Within this area we plan appointments so that the distances between sites remain short. For individual small tasks, the page Small Repairs is the right one; for larger interior conversions, the page Interior Fit-Out.

Frequently asked questions about drywall in Vienna

What does 100 m² of drywall cost?
For a standard double-boarded wall with insulation, €6,000 to €9,500 net, including material, Q2 filling and disposal. Doors, reinforcements and site setup come on top.
What does it cost to suspend a 20 m² ceiling?
€1,000 to €1,800 net, depending on suspension height, recessed lights and substrate. With timber beam ceilings in period buildings rather at the upper end, because resilient bars and separating joints are needed.
What is cheaper: masonry or drywall?
Drywall, in almost all cases. A brick wall with plaster costs €90 to €150/m², needs drying time and loads the ceiling with 150 to 250 kg/m². A drywall wall weighs 25 to 50 kg/m², can be finished the next day and insulates better against sound at the same thickness.
How do I calculate the cost of a drywall wall?
Wall area in square metres times price per square metre, plus door reinforcement per opening, plus site setup. Example: 18 m² double-boarded wall at €75/m² = €1,350, plus €310 door reinforcement, plus €400 site = €2,060 net.
How long does drywall work take?
A 15 m² room wall is finished in two to three working days, including filling and drying times. 40 m² of wall area takes four to five days. The limiting factor is not installation but the drying of the filler coats.
How much sound insulation does a drywall wall achieve?
Double-boarded with mineral wool around 52 dB, a double stud wall 60 to 65 dB. That is above a 12 cm brick wall. Prerequisites are sealing tape, offset sockets and separate stud frames.
What do F30, F60 and F90 mean?
The wall retains its function for 30, 60 or 90 minutes in the event of fire. The value only applies to the tested overall build-up of board, profile, insulation, screw and joint design. You receive the system number and the test certificates from us.
Which filling quality should I choose?
Q2 for normal living spaces with matt paint or woodchip. Q3 for grazing light and satin paints. Q4 only for gloss paint, metallic wallpaper or large window areas with low-angle light. Q1 is enough for surfaces that will later be tiled or covered.
Is drywall possible in the bathroom?
Yes, with impregnated boards and closer stud spacing. However, the watertightness does not come from the board but from the bonded waterproofing under ÖNORM B 3407, which is applied before tiling.
How thick is a drywall wall?
Single-boarded with CW 75: 10 cm. Double-boarded: 12.5 cm. Double stud wall: 20 to 25 cm. A lining wall in front of an existing wall needs 5 to 10 cm, depending on unevenness.
Do I need to register anything for a drywall wall?
Non-load-bearing partition walls within an apartment in Vienna generally require neither a permit nor notification. It is different if escape routes, fire compartments or the division of apartments are affected – then a submission to MA 37 is necessary, which we handle via a licensed partner company.
Does the apartment remain habitable during the work?
As a rule, yes. We work with a dust-protection wall and a lock, do a rough clean every day and announce noisy work in advance. Cutting profiles and sanding are dust-intensive, usually on two days.
Do you also do the painting?
Yes, on request we hand over primed and painted. Otherwise our service ends with the agreed filling quality – then the quote explicitly states “painting not included”.
Drywall: how quickly can I get an appointment?
Survey within five working days, quote within two working days after that. Construction starts in two to five weeks, depending on workload.
Drywall: what warranty is there?
Three years under § 933 ABGB on the construction work. Cracking at perimeter joints due to building movement is excluded if the joints were properly made as separating joints – that is why we document them.
Do you also do acoustic ceilings?
Yes, perforated-board ceilings with acoustic fleece for offices, medical practices and restaurants, €95 to €160/m². The effect depends on the cavity and the insulation layer, not just on the board – we calculate that beforehand.
How high are drywall prices in Vienna per m²?
As an all-in price with material, €40 to €120 per m². Single-boarded stud wall €40 to €60, double-boarded with insulation €60 to €95, fire-rated wall €80 to €120, lining wall €35 to €70, suspended ceiling €50 to €90.
What does drywall cost per m² without material?
€22 to €55 per m² for labour only. The material share is €14 to €40 per m². Client-provided material usually saves less than expected, because retail prices apply instead of trade terms and responsibility for defects is shared.
What does a drywall installer charge per hour?
€68 to €92 per skilled-worker hour net in Vienna, labourers €48 to €65. Only work that cannot be measured in square metres is charged by the hour – adjustments, touch-ups, special details. Areas are charged at unit prices.
What is a drywall installer not allowed to do?
Anything that falls under a regulated trade: electrical installation, gas and plumbing, structurally relevant interventions in the load-bearing structure. We carry out the drywall and construction work and bring in authorised partner companies for this, whom we name in the quote.
Is a drywall wall worse than a masonry wall?
No. A double-boarded stud wall with insulation achieves around 50 to 55 dB, more than a 10 cm brick wall – at about half the cost and without drying time. The difference lies in loads: heavy objects need cross-members in the stud frame.
What does a partition wall in an apartment cost?
A stud wall 3 m long and 2.6 m high, double-boarded with insulation, costs €470 to €740 net. With a door opening and reinforced header construction, €180 to €420 is added.
Can I have a heating and cooling ceiling installed?
Yes, as a suspended ceiling with embedded registers, €180 to €320 per m² of active area. Dew-point monitoring in cooling mode is important – without it, moisture condenses on the ceiling. Registers and system technology are handled by the partner company.
What does shaft cladding cost in a riser replacement?
€110 to €260 per linear metre of shaft height, depending on fire-protection class and accessibility. The access panel costs €180 to €520 and is the point where saving money backfires most expensively.
Do you also do attic conversions?
Yes, the drywall part: between- and below-rafter insulation €45 to €110/m², sloping roof boarded and filled €50 to €95/m², dry screed €65 to €120/m². If the roof is raised or dormers are added, it is a building project requiring a permit – details on the Attic Conversion page.
Why is airtightness so important in an attic conversion?
Because warm room air is drawn through every leak into the structure, where it cools and releases its moisture into the timber. The result is mould or rot after two to four years – invisible behind the finished lining. Connections are taped and penetrations are made with sleeves.
Is Rigips the same as plasterboard?
Rigips is a brand name, plasterboard the type of construction. We work with systems from several manufacturers and never mix components from different systems within a tested fire-protection build-up – that would void the classification.
Do you also offer drywall planning?
Yes: wall types per room, connection details, load plan, installation zone, reflected ceiling plan and surface qualities. The reflected ceiling plan pays off from about three rooms with suspended ceilings; for medical practices and offices it is standard.
Can underfloor heating be connected in a drywall wall?
Manifolds and pipes can be neatly accommodated in lining walls and shafts, with access to the manifold. The heating installation itself is carried out by the licensed partner company.
Do you work in all Viennese districts?
Yes, at the same unit prices. Differences only arise with delivery – a fourth floor without a lift in a short-term parking zone takes more time than a ground floor with courtyard access. That is a separate item in the quote.
What do I need to bring for drywall planning?
Ideally a floor plan; even an old sketch from the purchase contract is enough as a starting point. Plus photos of the ceilings, the windows and the places where walls are to be built, and a short list of what will go into the rooms: wall cabinets, television, washbasin. During the site visit we re-measure, check the ceiling build-up and specify wall types, reinforcements and connections.
Are drywall prices higher in Austria than in Germany?
Partly, but above all they are stated differently. In Austria 20 per cent VAT applies, wages follow their own collective agreements, and on Viennese sites delivery and parking add to the effort. So only compare net prices with the same scope of work, i.e. the same boarding, insulation, filling level and including disposal.
Can a plasterboard wall be put up in one day?
A team of two can often manage the stud frame and boarding of a single wall in one day. But that does not make it finished: filling is done in several passes, each needs drying time, then it is sanded and painted. Three to five working days spread over a week are realistic until the wall is ready.

Choosing a drywall company in Vienna: what matters

According to the Chamber of Commerce, over 300 companies are registered for drywall in Vienna, from one-person firms to industrial service providers. The price range for the same wall runs from €35 to €130 per square metre. These six points separate a reliable quote from a cheap one.

  • Trade licence. Drywall (plasterers and drywall installers) is a regulated craft under § 94 no. 67 GewO. Ask about the licence anyway, and about who does the electrics and plumbing; those are regulated trades.
  • Insurance. For work in occupied buildings, construction liability insurance is a must. Our sum insured is €3 million, verifiable before work begins.
  • System integrity. Anyone who mixes components in fire protection delivers a wall without certification. A serious quote names the manufacturer and system number.
  • Measurement according to the standard. Invoicing is done according to ÖNORM B 2110 or the rules of the relevant contract standard – not by feel. Openings below a certain size are measured over; this should be made transparent.
  • Disposal. Plasterboard is construction waste and must be disposed of with documentation. Anyone who leaves the offcuts in the courtyard has not calculated them.
  • Availability after the job. Three years of warranty are no use if the company no longer exists after two years. Ask how long the company has been in business.

More frequently asked questions

Which board is right for my project?
Standard plasterboard for dry living spaces, impregnated board in the bathroom, fire-protection board where fire protection is required, gypsum fibre for higher loads, cement-bonded board in permanently wet areas. We write the type into the quote.
Can I hang kitchen wall units on a drywall wall?
Yes, if there is a cross-member or timber noggin in the stud frame. This allows 150 kg and more. Without reinforcement the limit is about 40 kg with cavity plugs in double boarding.
How much space does a drywall wall take up?
Single-boarded with CW 75 around 10 cm, double-boarded 12.5 cm, double stud wall 20 to 25 cm. A lining wall needs 5 to 10 cm, depending on how crooked the existing wall is.
Can drywall be placed on a timber floor?
Yes, with load distribution. With timber beam ceilings we check where the beams run and do not place the wall in the middle of a bay. For larger projects we bring in a structural assessment via a licensed partner company.
What happens to the cables and pipes in the wall?
They run through the pre-punched openings in the CW profiles, with protective grommets against chafing. Before closing, we photograph every line with dimensions – so that nobody drills blindly later.
Does drywall work create a lot of dust?
When cutting the profiles and sanding the filled surfaces, usually on two days. We work with a dust-protection wall and lock, sand with extraction and do a rough clean every day.
Can I install a sliding door in a drywall wall?
Yes, with a sliding-door pocket kit in the stud frame. This requires a wall thickness of at least 10 to 12.5 cm and must be planned before boarding. Surcharge €600 to €1,400 depending on the system.
How flat does the wall have to be?
The flatness tolerances of ÖNORM DIN 18202 are decisive. For walls with increased requirements it is 3 mm over 1 m measuring length. We check with a straightedge and grazing light and record the result at acceptance.
Can you tile on drywall?
Yes. With single boarding up to 25 kg/m² of covering, with double boarding up to 50 kg/m². In wet areas, the bonded waterproofing under ÖNORM B 3407 goes onto the impregnated board first.
Why is my drywall wall cracking?
In nine out of ten cases for one of three reasons: no UA profile at the door, board joints not staggered, or the connection to ceiling and wall was filled rigidly instead of as a separating joint. All three are avoidable, and all three only show after weeks.
How soon can I paint after drywall work?
As soon as the filled areas have dried through, usually 24 to 48 hours after the last pass. Prime first, otherwise the filled areas absorb the paint differently and every joint shows.
Do you also take on small jobs?
From about 10 m² of wall area or when several trades come together. For a single small wall without special requirements, a one-person company is cheaper – we tell you that openly instead of writing an overpriced quote.
Do you also work in the evening or at weekends?
Yes, for conversions during ongoing operations – medical practices, offices, restaurants. This involves a surcharge and is shown in the quote. In residential buildings we keep to the usual hours and announce noisy work in advance.
What does it cost to remove a drywall wall?
€15 to €35 per square metre including disposal, depending on build-up and accessibility. More for fire-rated walls, because the material is disposed of separately.
Drywall: do I get a fixed price?
Yes, after the survey, as a bill of quantities under ÖNORM B 2110 with items, quantities, system details, filling quality and explicit exclusions. Without a survey any figure would be a guess, especially in period buildings with crooked walls.

Related services

◆ Partner company · Bling Premium Cleaning

Drywall finished? Sanding dust is particularly fine.

Filler dust settles everywhere and can hardly be removed with household appliances. Bling Premium Cleaning takes care of the final construction clean with industrial vacuums and fine-dust filters. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quote free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Drywall Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your drywall project?

Write to us directly on WhatsApp — send a floor plan and photos of the rooms. Reply within two working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and is not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted construction trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (Baumeister). Under § 99 (5) GewO, the title “Baumeister” is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master-builder services, structural engineering, gas and sanitary engineering, electrical engineering — are carried out exclusively by authorised, licensed partner companies.