Skyline Bau · Mödling district

Construction company Brunn am Gebirge just past Liesing, but under provincial law.

Construction company in Brunn am Gebirge: a Viennese general contractor for renovation, conversion and extensions in the Mödling district.

Brunn am Gebirge borders directly on Vienna's 23rd district, but in terms of building law it belongs to Lower Austria. Anyone renovating here deals with the market town (Marktgemeinde) as building authority, with its own development plan and with houses that mostly date from the sixties to the eighties. Our focus remains Vienna – we serve its southern fringe with the same team and the same process.

In short: in Brunn am Gebirge and the neighbouring municipalities of the Mödling district, it is the mayor who decides on your building project, not MA 37. What counts is the Lower Austrian Building Code 2014 (NÖ Bauordnung), the zoning plan and – if the municipality has issued one – the development plan. Construction prices are in line with what we charge in Vienna; for travel and site logistics to the south we add 3 to 5% and show this separately.
✓ Market town instead of city council✓ Development plan read in advance✓ Terraced house, detached house, commercial hall✓ Lump-sum price based on ÖNORM B 2110✓ Licensed partners for electrical, gas, plumbing, structural design

Why building in Brunn is not like building in Liesing

Between Atzgersdorf and the built-up area of Brunn, you hardly notice a border on the road. Legally, though, it is a clear one: on the Viennese side the Vienna Building Code applies, the building control authority is MA 37, and townscape questions end up with MA 19. A few hundred metres further on, the Province of Lower Austria sets the rules, and they are enforced by the municipality itself. This has practical consequences that many clients only notice once a plan has already been drawn.

The most important difference lies in how projects are classified. The Lower Austrian Building Code distinguishes between projects that need a building permit, those that only have to be notified to the authority, and those that require neither. A Viennese client is used to almost every change to load-bearing elements or to the external appearance going through a submission procedure. In the Mödling district the range is wider, and that is exactly why it pays to clarify the classification before the first draft. Anyone who plans too early sometimes plans for the wrong procedure.

The second difference is how close you are to the authority. In Vienna you face a large administration that works according to uniform procedures. In a market town such as Brunn or Perchtoldsdorf, the building office is small, the officials know the streets and often the history of a plot as well. That can be an advantage, because queries are answered more quickly. But it also means that local practice – for instance how strictly fences, roof shapes or outbuildings are assessed – carries more weight than the letter of the law alone.

QuestionVienna, e.g. 23rd districtBrunn am Gebirge and Mödling district
Which law?Vienna Building CodeLower Austrian Building Code 2014 with the Lower Austrian Building Technology Ordinance
Who decides?City council, MA 37Mayor as building authority of first instance
What governs development?City zoning and development planLocal spatial planning programme, zoning, possibly a municipal development plan
Who inspects commercial installations?Municipal district officeMödling district authority (Bezirkshauptmannschaft)
Where does the rainwater go?usually into the sewerinfiltration on your own land is often required
Who subsidises renovations?City of Vienna, wohnfonds_wienProvince of Lower Austria, plus federal programmes

Permit, notification or nothing at all: classification comes first

Whether a project needs a permit, needs to be notified or can be carried out freely depends not on the amount of money involved, but on what happens structurally. New builds, extensions and changes that affect structural stability, fire protection or neighbours' rights generally require a building permit in Lower Austria. This submission requires plans, a building description and, depending on the scope, an energy performance certificate and structural documents. Neighbours are involved and can raise objections insofar as the law grants them rights – for example regarding distances, building height or daylight.

In addition, there is a group of measures that must be reported to the municipality in writing beforehand. The authority then has a deadline within which it can prohibit the project or require a permit after all. Exactly which works fall into this group is laid down in the law and has changed over several amendments. We therefore do not rely on a list from memory but check with the building office before committing to a schedule. That costs a phone call and, in the worst case, saves months.

Finally, there remains a set of works that need no procedure – typically maintenance, replacing components like for like, or interior work that does not touch anything load-bearing. This is where the most common misconception lies: exempt from procedure does not mean that the Building Technology Ordinance, the OIB requirements or the distances to the neighbour do not apply. Anyone who, for example, changes the sill height when replacing a window, or whose façade insulation projects over the plot boundary, is quickly back in permit territory.

Our approach: we describe the project in two or three sentences, present it to the municipality and record the answer in writing. Only then does the quotation state whether planning submission drawings, a notification or just the construction work are included.
ProjectUsual classificationWhat is often overlooked
Conservatory or extension to a terraced housePermitBuilding density and distance to the neighbouring plot
Adding a storey to a bungalowPermit, with structural designpermissible building height according to the development plan
Opening in a load-bearing wallnotification or permit, depending on scopeProof by a licensed structural engineer
Bathroom renovation without changing the layoutusually exempt from procedureWaterproofing under the tiles, gas appliances in the bathroom
Re-covering the roof, same shapeusually exempt from procedureDormers or roof windows change the situation
Thermal insulation of the external wallvaries depending on municipality and locationTownscape requirements in the village centre, insulation thickness at the plot boundary

What building in Brunn am Gebirge costs in 2026

The following ranges are net guide prices for 2026 and are based on the prices on our Viennese service pages. For the Mödling district, a surcharge of 3 to 5% is added for travel, equipment and site set-up, as we also state on the page for southern and the rest of Lower Austria. A price only becomes binding after the site visit, because in houses from the seventies in particular there is often more behind the plaster and tiles than you can see from the outside.

WorkNet rangeTypical cost drivers in the Mödling district
Re-covering a pitched roof including sarking membrane180–320 €/m²Scaffolding in a narrow terraced-house garden, sheet metal work
Re-covering with over-rafter insulation280–450 €/m²Junction with the neighbouring half of a semi-detached house
External thermal insulation composite system on the external wall120–190 €/m²Adapting plinth, window sills, canopies
uPVC windows, triple-glazed, per unit750–1.100 €Roller shutter boxes from the original construction
Complete bathroom, 6 to 8 m²14.000–22.000 €Galvanised steel pipes, no floor drain
Solid masonry extension, one storey1.800–2.600 €/m²Foundations next to an old strip foundation
Adding a storey in timber-frame construction1.800–2.600 €/m²Load-bearing capacity of the top-floor ceiling
External basement waterproofing with excavation250–500 €/m²Slope water at the edge of the Vienna Woods, access for the excavator
Complete renovation of a house900–1.800 €/m²Scope of building services, condition of the ceilings

Why the ranges are so wide can be shown with a roof. If only the covering on a terraced house is renewed, rafters, insulation and interior lining remain untouched, and the price is at the lower end. As soon as stripping reveals that the rafters at the eaves are rotten or the old mineral wool between the rafters has slumped, the re-covering turns into a roof renovation with insulation – and the price per square metre moves upwards. We therefore include open items for such findings in our quotations, instead of hiding them in a lump sum.

The travel surcharge to the south is comparatively low, because Brunn, Perchtoldsdorf and Maria Enzersdorf can be reached quickly from Vienna via Triester Straße or the A2 Südautobahn. It becomes noticeable mainly for short jobs with many trips, such as minor repairs, and on sloping sites in Gießhübl or Hinterbrühl, where not every lorry can get up to the house and material has to be brought in with smaller equipment.

Worked example: terraced house from the seventies, 120 m²

The following example is a model calculation, not an invoiced project. It shows how the costs of a typical terraced house in the Mödling district are made up when roof, windows, bathroom and building services all fall due together.

Model calculation · Terraced house built around 1975, two storeys, 120 m² living space
Site visit, checking existing plans, moisture measurement€1,900
Removal of bathroom, floors, old pipework€9,800
Re-covering the roof, over-rafter insulation 75 m²€27,000
Nine windows and one patio door€11,600
Insulating the façade, 140 m² wall area€21,700
Heating, plumbing, electrical via licensed partners€46,000
Bathroom, floors, painting, interior doors€38,500
Travel and logistics, 4%€6,260

Total approx. €162,760 net, around €1,356 per square metre of living space. The calculation assumes a construction period of five to six months. The biggest uncertainty is the building services: if there are still steel pipes in the screed, the floor has to be opened up in several rooms, which brings screed and flooring items along with it.

What kinds of houses stand in the Mödling district

The district's building stock is more varied than the view from the motorway would suggest. Anyone renovating should know when their house was built, because each construction period brings its own weak points and the order of work depends on them.

Building typeWhere it is commonly foundWhat usually needs doing
Winegrowers' and village-centre houses, often with a cellar and press houseold village centres of Brunn, Perchtoldsdorf, GumpoldskirchenDamp in the masonry, roof structure, townscape for façade and windows
Villas and country houses from around 1900Mödling, Hinterbrühl, Maria EnzersdorfTimber ceilings, chimneys, stucco, careful insulation
Detached and terraced houses 1960–1990Residential estates in all municipalities, SüdstadtRoof, windows, façade, bathroom, pipework – often all at once
Residential complexes from the nineties onwardsalong the Südbahn railway, edges of the villagesTerraces, balcony waterproofing, underground car park, flat conversions
Halls, offices, retail spaceWiener Neudorf, Vösendorf, commercial zones in BrunnTenant fit-out, floors, drywall, fire protection

The largest group are the detached and terraced houses of the post-war decades. They were built at a time when plots in the south of Vienna became affordable for many families and building had to happen fast. Typical features are hollow blocks or vertically perforated bricks without additional insulation, precast concrete ceilings, flat roofs or shallow-pitched gable roofs, and windows that could by now be replaced for the second time. The building services often still date from the original construction or from a first modernisation in the nineties.

These houses have one good quality: structurally they are usually straightforward and cope well with alterations. Their weakness is thermal performance, and the fact that roof, windows, heating and bathroom are all roughly the same age. Anyone who renews only one of them will open up the same areas again later. That is why, for these houses, we almost always recommend an overall plan, even if the work is then carried out in phases over several years. We describe how the measures interact under energy-efficient renovation.

Old village centres and winegrowers' houses

Wine has been grown along the Thermenlinie for centuries, and you can see it in the village centres. In Brunn, Perchtoldsdorf or Gumpoldskirchen there are one- to two-storey houses with a carriage entrance, a narrow courtyard and a cellar originally built for barrels and the press, not for living in. These houses are built of rubble stone or mixed masonry, often without waterproofing against the ground and with timber beam ceilings above the ground floor.

The most common problem is moisture drawn up from the ground into the walls. Over the decades, later owners sealed the walls with cement plaster, emulsion paint or tiles, so the water can no longer evaporate and rises higher. Before talking about new finishes, a measurement is needed: how damp is the masonry at what height, how high is the salt content, and where is the water coming from? Only then can you decide whether a horizontal damp-proof course, hacking off impermeable plaster or improving the drainage in the courtyard is the right first step. The options are described on our page on damp-proofing masonry.

A second issue is the townscape. Many municipalities in the district have requirements for their historic centres concerning roof shape, window divisions, colour schemes and materials, some in the development plan, some in separate ordinances. A uPVC window without glazing bars, or thick external insulation that swallows the cornice, may not be permitted there. If a building is listed, the Federal Monuments Office (Bundesdenkmalamt) must also be involved. We clarify this before windows are ordered or insulation boards are costed.

A wine cellar is not a basement storey. A vaulted masonry cellar can be dried out, ventilated and used for storage or as a tasting room. For living space, however, it usually lacks daylight, ceiling height and a second escape route – and even the best renovation does not change that.

New housing along the Südbahn

Since the nineties, numerous residential complexes and rows of terraced houses have been built along the Südbahn railway and at the edges of the villages. For these buildings, owners and property managers ask less often for a complete renovation than for targeted work: leaking terraces above underground car parks, balconies with flaking surfaces, cracks at junctions between precast and in-situ concrete, or the conversion of a flat after a change of ownership.

With terraces above occupied rooms or garages in particular, the cause almost never lies in the surface but in the waterproofing underneath or at the junctions with the door and balustrade. New tiles on old, cracked waterproofing only shift the damage elsewhere. The sensible approach is to open up the build-up at one point, document the layers and then decide whether a partial repair is enough or whether the build-up must be renewed down to the structural slab. How such a renovation proceeds is explained on the terrace renovation page.

In condominium complexes there is an additional legal dimension. Whether a terrace is a common part or belongs to a particular flat determines who commissions and pays for the renovation. That is a question for the condominium agreement and the property management – we can provide the structural findings, but we cannot replace the legal assessment.

At the edge of the Vienna Woods: slopes, access and slope water

West of Brunn, the land rises towards the Vienna Woods. In Perchtoldsdorf, Gießhübl, Hinterbrühl and the upper parts of Mödling and Maria Enzersdorf, many houses stand on slopes, some with driveways that are wide enough for a car but not for an articulated lorry. For a building site this means: material often has to be delivered in smaller quantities, excavated soil moved with mini excavators and dumpers, and the crane positioned so that it does not block the road for longer than permitted.

Technically, on a slope, water is the main concern. Rain falling on the plot higher up seeps through the topsoil and flows downhill over denser layers – straight against the uphill basement wall. Pressurised water builds up there at times, even if there is no groundwater nearby. Internal waterproofing alone cannot hold this back in the long term. What works is a combination of external waterproofing, a drainage layer in front of the wall and a drain that carries the water away in a controlled manner, with the discharge to be agreed with the municipality.

Situation on the slopeTypical consequenceWhat we propose
Basement buried in the ground on the uphill sidedamp wall, efflorescenceExcavation, waterproofing, drainage, dimpled membrane
Garden terrace on made groundSettlement, tilted slabsCompacted sub-base or retaining wall
Extension on the downhill sidedifferential settlement relative to the old buildingSoil report, separate foundations, movement joint
Steep, narrow accesshigher logistics costsSmall equipment, deliveries in part loads, stopping place agreed with the municipality

Where ground has to be retained, retaining walls come into play. Above a certain height and depending on their position relative to the plot boundary, they require a permit and a structural calculation by a licensed designer. The drainage behind the wall is at least as important as the wall itself. Details of how they are built can be found on the retaining wall page.

Soil, basements and damp in the Vienna Basin

East of the Thermenlinie the land becomes flat. In Vösendorf, Wiener Neudorf and the lower parts of Brunn, plots lie in the Vienna Basin, where gravel, sand and clay layers alternate. How much load the ground can bear and how high the groundwater is can differ even between two neighbouring plots. For a bathroom renovation this is irrelevant; for an extension with a basement or a new floor slab it is not.

For new foundations we therefore have a geotechnical engineer assess the ground before the structural design is fixed. Such a report costs a fraction of what wrongly sized foundations later cause in cracks and remedial work. In existing basements we distinguish between three causes of damp that are often confused: water rising by capillary action in the masonry, water pressing against the wall from outside, and condensation that forms on cool basement walls in summer when warm air is let in. Waterproofing does nothing against condensation; what helps is correct ventilation and, where necessary, insulation.

Another point concerns rainwater. For new builds and extensions, many municipalities in the district require roof water to be infiltrated or retained on your own plot. Whether a soakaway, a swale or a cistern with overflow is suitable depends on the soil and the municipality's requirements. We plan this in from the start, because a soakaway that is only installed after the garden has been laid out means twice the effort. If the basement itself is to be renovated, read on under basement renovation.

More space: extensions and additional storeys

When the family grows or a study is needed, an extension is the most common answer in the Mödling district. Moving house is expensive in the area, and many plots still have reserves – at least at first glance. Whether this reserve may actually be built on is determined by zoning, building density, type of development and the prescribed distances. With terraced houses on narrow gardens, the scope is often smaller than expected, because the permissible built-up area is already used up by the house, garage and garden shed.

That is why we do not start with a design but with a calculation: how much floor area is permitted under the development plan, how much is already built on, and how tall may the building be? Only once these figures are established is it worth asking whether a single-storey extension towards the garden or an additional storey is the better solution.

CriterionExtension into the gardenAdding storeys
Footprintuses up garden and permissible built-up areano additional footprint
Structural designnew foundations next to the existing buildingthe existing structure must carry the load, strengthening often needed
Habitability during constructionusually perfectly possibleroof is open, living below is restricted
Most common limitDistance to the neighbouring boundarypermissible building height
Construction method we often recommendsolid masonry or timber frametimber frame, because it is lighter

With an extension, the connection to the existing building determines the quality. Old and new foundations settle differently, and a rigid connection cracks within the first few years. A properly planned joint, adapted foundations and a well-thought-out roof junction prevent this. For an additional storey, the seventies bungalow is a rewarding candidate, provided the flat roof slab is made of reinforced concrete and is strong enough. A lightweight timber-frame structure puts considerably less load on it than brick and is weathertight within a few days. More on this on the extension and adding a storey pages.

Renovating existing buildings: roof, façade, bathroom, windows, terrace

Most of our work in the Mödling district is not about enlarging, but about renewing what is already there. The order of work matters more than any individual measure. Anyone who replaces the windows before insulating the façade puts the new windows in the wrong position in the reveal and has to rework the junctions later. Anyone who renews the bathroom before the risers will hack open the fresh tiles again when the pipes are replaced.

Roof and top-floor ceiling

The first thing to clarify is whether the roof space is to be used. If it stays cold, walkable insulation of the top-floor ceiling is often sufficient, and that is much cheaper than insulating the roof. If it is to be converted, the insulation belongs in the roof plane.

Façade and windows

Both are planned together, so that the window sits in the insulation plane and the junction can be made airtight. Roller shutter boxes from the original construction are often the biggest thermal bridge in the whole house.

Building services

Pipework, heating and electrical installations come before the finishes. Regulated parts are handled by licensed plumbers and electricians, whom we coordinate.

Bathroom and interior fit-out

Only once the pipes have been renewed do waterproofing, tiles, floors and painting follow. A bathroom in a terraced house is usually between six and nine square metres.

Terrace and outdoor areas

Last of all, when there is no scaffolding or skip in the way any more. Falls, waterproofing and the junction with the patio door are all redone at this stage.

This sequence is not dogma. If the roof leaks, it is repaired first, whatever the plan says. But it shows why, with houses of this generation, we so often advise an overall concept that is then carried out in two or three construction phases. For the individual jobs we refer you to the specialist pages, for example on roof renovation or bathroom renovation.

Subsidies in Lower Austria

In Lower Austria there are provincial subsidies for thermal renovation and heating replacement, supplemented by federal programmes. The conditions, funding rates and deadlines change regularly, sometimes several times a year. We therefore do not give any amounts on this page, but refer you to the current guidelines of the Lower Austrian housing subsidy (NÖ Wohnbauförderung) from the Province of Lower Austria and to federal information, for example via oesterreich.gv.at.

What hardly changes over the years are the basic rules. First: timing matters. For many programmes the application, or at least a registration, must be made before work starts or before the contract is awarded. Second: as a rule, what is subsidised is a measurable effect, demonstrated by an energy performance certificate before and after the renovation. Third: usually only certain items are eligible, such as insulation, windows or the heating system, but not the new tiles in the bathroom.

For you this means: the eligible work should be shown separately in the quotation, so that you or your energy consultant can transfer it into the application without recalculating. We do this as standard. The application itself, and the assessment of which programme suits your case, belong in the hands of an energy consultant, not a construction company.

Commercial premises in Wiener Neudorf and Vösendorf

With the industrial centre in Wiener Neudorf and the retail space around Shopping City Süd in Vösendorf, the Mödling district is one of the densest business locations in Lower Austria. For businesses it is rarely about large new buildings, more often about tenant fit-outs, conversions after a change of tenant, new sanitary areas, drywall partitions, industrial floors or adapting to fire protection requirements.

Different priorities apply here than in a detached house. A shop or hall that stands idle earns no money. We therefore plan backwards from the opening or handover date, work in sections or outside operating hours if necessary, and coordinate deliveries with the site's logistics. For changes to a commercial installation, the district authority (Bezirkshauptmannschaft) may be responsible in addition to the building authority; whether an amendment approval is needed should be clarified early by the operator and designer, because the schedule depends on it. More on conversions for retail and catering can be found under converting commercial premises.

How a project with us works

StepWhat happensWhat you prepare for it
1. EnquiryYou describe the project using the form, ideally with photosAddress of the property, year of construction, rough wishes
2. Site visitWe look at the house, access and plot, and measure damp if necessaryAccess to basement and loft, existing plans
3. Clarification with the municipalityClassification as requiring a permit, requiring notification or exemptConsent for us to enquire at the building office
4. QuotationItems by trade, open points clearly named, travel shown separatelyPriorities and budget
5. Design and permit submissionLicensed designers prepare the submission documents, if neededSignatures, land register extract, consent of co-owners
6. ConstructionA site manager coordinates all trades, weekly progress updateAvailability for decisions, e.g. choice of tiles
7. HandoverJoint acceptance, list of defects, documents for the completion noticeTime for a thorough walk-round

The step that affects the schedule most is the third. For a bathroom renovation that needs no procedure, work can start a few weeks after the go-ahead. If a building permit is needed, several months usually pass before construction can begin, depending on how complete the documents are, the involvement of neighbours and how busy the building office is. This time cannot be shortened, but it can be put to good use – for detailed planning, selecting samples and booking dates with the partner firms.

Once approved work is finished, completion must be notified to the building authority, together with the documents the law requires for this. Depending on the project, these include confirmations of proper execution, inspection reports on the chimney and electrical installation, and an updated energy performance certificate. We collect these certificates during the construction period so that they do not have to be laboriously chased up at the end.

Licensed partners for regulated trades

Skyline Bau is a general contractor. This means we take overall responsibility for planning the sequence of work, carrying out the building work and coordinating everyone involved. In Austria, however, some work may only be carried out by firms holding a specific trade licence. This includes electrical installations, gas and water installations, heating engineering, structural calculations and the preparation of planning submission drawings. With us, these services are provided by licensed partner firms with whom we work regularly.

For you, little changes as a result: you have one contract, one contact person and one schedule in which all trades are coordinated. The partner firms issue the inspection reports and test records prescribed for their trade, which you will later need for the authority, your insurer or a sale. Who provides which service is stated in the quotation, so that there is no uncertainty about licences and liability.

For property management companies and owners' associations

In the Mödling district, many property management companies look after mixed portfolios: older residential complexes, newer developments with underground car parks and individual tenement buildings in Mödling. Different things matter to them than to detached-house owners. Decisions are made at owners' meetings or by circular resolution, and that requires documents that are easy to follow. We provide quotations broken down into items that an owners' association can compare, with photos of the findings and an explanation of why a measure is necessary.

When a building remains occupied, informing the residents is also crucial. When will the water be turned off, when will the entrance be closed, when will the noise come? We announce such dates in good time by notice and keep to local quiet hours. For property managers with several smaller jobs in the region, it is worth bundling site visits. An overview of our services for residential complexes is given on the staircase renovation page.

Neighbours, plot boundaries and the building site

In the district's housing estates, houses stand close together, gardens adjoin directly and terraced houses share a party wall. Every building site therefore also affects the neighbours. In the permit procedure they are parties and can raise certain objections. Regardless of that, it pays to inform the neighbours before work starts and to document the condition of adjoining structures if vibration is expected – for example during demolition or excavation right at the boundary.

If the neighbouring plot has to be entered for scaffolding or work, an agreement with the owner is the cleanest way. Placing skips or material on municipal roads requires a permit from the municipality. We apply for it and plan the area so that driveways and footpaths remain usable.

When in the year to build

External work such as roof, façade and terrace belongs in the months with stable temperatures, because adhesives, renders and waterproofing need a minimum temperature to be applied. Spring is particularly in demand for this, so capacity is booked up early. If you plan in autumn and complete the submission in winter, you can start in March or April. Interior work such as bathrooms, floors or drywall can be carried out all year round and often has shorter lead times in winter.

Also in these municipalities

From Brunn we work throughout the Mödling district and in the adjoining parts of Vienna. The process is the same everywhere; the differences lie in the authority, the development plan and the access.

MunicipalityCommon construction work there
MödlingOld-town houses, hillside villas, flats in multi-occupancy buildings
Maria EnzersdorfSüdstadt from the sixties with terraced houses and residential complexes, hillside villas
PerchtoldsdorfVillage centre with Heuriger wine taverns, slopes towards the Heide
Wiener NeudorfCommercial premises in the industrial centre, detached houses
VösendorfRetail space, residential complexes, estate houses
Gießhübl and HinterbrühlSlopes in the Vienna Woods, narrow access, extensions
Guntramsdorf, Gumpoldskirchen, LaxenburgWinegrowers' houses, detached houses, older village centres
Vienna 23, adjacentEstate houses, commercial premises in Liesing, Viennese law applies here

For places further north we refer you to the page building in Klosterneuburg, and for the whole surrounding area to construction company Lower Austria.

When you do not need us

Not every project needs a general contractor. If all you need is one room painted, a parquet floor sanded or a tap replaced, a local tradesperson is usually the cheaper choice, because there is no coordination effort or travel. Working with us makes sense as soon as several trades interlock, dates have to be coordinated or an authority is involved. A bathroom in which the plumber, electrician, tiler and painter work one after another is such a case. A house in which the roof, windows and heating are all being renewed at the same time, all the more so.

Frequently asked questions about building in Brunn am Gebirge

Does the Vienna Building Code apply in Brunn am Gebirge because the town borders directly on Vienna?
No. Brunn am Gebirge is in Lower Austria, so the Lower Austrian Building Code 2014 applies, together with the associated Building Technology Ordinance. Being close to Liesing does not change this. For clients this mainly means a different classification of procedures, a different authority and the municipality's own requirements in the development plan.
Where do I submit applications in Brunn?
To the market town, because the building authority of first instance is the mayor. The building office accepts building applications and notifications and provides information on zoning and the development plan. Decisions can be appealed within the municipality, after which the Regional Administrative Court of Lower Austria decides.
How do I find out how much I may build on my plot in the Mödling district?
From your municipality's zoning plan and, if there is one, its development plan. These set out building density, type of development and height limits. The plans can be inspected at the municipal office, and many municipalities also publish them online. On this basis we calculate how much area may still be built on.
Does a conservatory on a terraced house in Brunn need a permit?
As a rule, yes, because a heated or permanently attached conservatory is an extension and increases the built-up area. What then matters is the distance to the plot boundary and the permissible density. With narrow terraced-house gardens in particular, this is the point at which projects fail or have to be redesigned.
How high is your travel surcharge for Brunn am Gebirge and the surrounding area?
For Brunn and the neighbouring municipalities to the south, we charge 3 to 5% on the building work. The rate depends on the duration and type of site: a conversion lasting several months spreads the trips better than a short repair. The surcharge is always shown as a separate item in the quotation.
What does it cost to renovate a terraced house from the seventies?
If the roof, windows, façade, building services and bathroom are renewed together, you are usually looking at €1,200 to €1,600 per square metre of living space net, including travel. If only individual components are due, correspondingly less. The biggest upward swing almost always comes from building services embedded in the screed.
Can an old wine cellar in the village centre be used as living space?
Usually not. A vaulted cellar can be dried out, ventilated and used as storage, a wine cellar or a hobby room. For a habitable room, however, building law requires adequate daylight, ceiling height and escape routes, which a cellar dug into the ground rarely offers. An on-site survey shows which use is realistic.
Why does my basement wall on the slope in Perchtoldsdorf get wet after every rain?
Because slope water flows down against the uphill wall and builds up there. This happens even without groundwater. The remedy is external waterproofing with a drainage layer and a drain that carries the water away. An internal coating alone will not withstand the pressure in the long term.
Do you need a soil report for an extension in Vösendorf or Wiener Neudorf?
For new foundations we recommend one almost every time. In the Vienna Basin, gravel, sand and clay layers alternate over short distances, and the groundwater level can vary. The report determines how the foundation is built and costs only a small fraction of the later shell construction costs.
Do I have to let the rainwater from my new roof soak away on my own plot?
In many municipalities in the district, yes, at least partly. The exact requirements are set out in the sewer regulations or the official decision. Options include a soakaway, a swale or a cistern with overflow. Whether the soil is permeable enough is shown by an infiltration test, which we arrange before planning.
May I install uPVC windows in the centre of Perchtoldsdorf?
That depends on the municipality's townscape requirements and on whether the house is listed. In historic centres, glazing bars, profile thickness and colour are often prescribed. We clarify this before ordering, so that the windows are not objected to after installation.
Can a bungalow in the Mödling district be raised by one storey?
Often yes, if the development plan permits the height and the existing ceiling can take the load. A structural engineer checks the ceiling, walls and foundation. An additional storey in timber-frame construction is lighter than brick and is therefore usually the practical solution for houses of this era.
What subsidies are there in Lower Austria for façade insulation?
The Province of Lower Austria subsidises thermal renovation through its housing subsidy scheme, and there are also federal programmes. Conditions and amounts change constantly, so we do not give any figures. What matters is to check the subsidy before awarding the contract and to plan for an energy performance certificate before and after the renovation.
Do you separate the eligible work from the rest in the quotation?
Yes. With us, insulation, window replacement and heating system appear as separate items, apart from the interior fit-out. That way the energy consultant can transfer the amounts directly into the application. We do not make the application ourselves, because choosing the programme requires specialist advice.
Do you also work on commercial premises in the Wiener Neudorf industrial centre?
Yes, particularly on tenant fit-outs, drywall, sanitary areas, floors and conversions after a change of tenant. We plan backwards from the handover date and work in sections if necessary. Whether a change to the commercial installation needs approval from the district authority should be clarified early by the operator.
Who carries out electrical and gas installations on your projects in the Mödling district?
Licensed partner firms holding the relevant trade licence. We coordinate them as general contractor, so you have just one contract and one contact person. The prescribed inspection reports and test records are issued by the specialist firm concerned and handed over to you at handover.
How long does it take in Brunn from enquiry to start of construction?
For work that needs no procedure, such as a bathroom renovation, often only a few weeks after the order is placed. If the project needs a building permit, several months are added for planning, submission and the procedure. We use this time for detailed planning and selecting samples, so that construction then proceeds swiftly.
What do I have to report to the municipality after approved work is completed?
The completion of the project, together with the documents required by law. Depending on scope, these are confirmations of execution, inspection reports on the chimney and electrical installation, and an energy performance certificate. We collect these certificates during the construction period so that nothing has to be submitted later.
Can I stay living in my house in Maria Enzersdorf during the renovation?
For work on the roof, façade or individual rooms, usually yes. For a complete renovation with open floors, the heating switched off and pipework being renewed, we advise moving out for a few months. That shortens construction time and saves costs, because living areas do not have to be protected every day.
Do I need a permit for a skip outside my house in Mödling?
Yes, as soon as it stands on a public road or pavement. The permit is issued by the municipality, usually with conditions on area, duration and safety measures. We apply for it on your behalf and position the skip so that driveways and footpaths remain usable.
Do you also renovate terraces above underground car parks in residential complexes along the Südbahn?
Yes. With such terraces, the damage usually lies in the waterproofing or at the junctions with the door and balustrade, not in the surface. We open up the build-up at a test point, document the layers and then propose either a partial repair or renewal. The order is normally placed via the property management.
Is a Viennese construction company worthwhile for a small project in Gießhübl?
For work involving just one trade, such as painting or a floor covering, a local firm is usually cheaper. A general contractor pays off as soon as several trades need coordinating or the authority and structural design come into play. On a slope there is also the logistics, which we plan in.

Related services

◆ Partner company · Bling Premium Reinigung

Cleaning after the build?

Builders' and detailed cleaning after the work is finished is handled by our partner company Bling Bling Premium Reinigung. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Construction company Brunn am Gebirge
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your building project in Brunn am Gebirge?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.