Master builder Vienna who really is one is shown in GISA.
Master builder Vienna: from the building contractor that does the work — not from an agent.
Master builder Vienna: whether a company is a licensed master builder (Baumeister) can be checked in thirty seconds in the public trade information system GISA. That applies to every provider, including us. Skyline Bau is not a Baumeister – master builder services are provided by licensed partner companies.
Master builder services in Vienna from a single source — structural design and master builder services through licensed partner companies, site management by us. — One contract, one contact person.
“A builder in Vienna who keeps their promises” — for us that is not a marketing slogan but the basis of our business. For Skyline Bau, keeping promises means: a fixed price that is the same on the final invoice as in the quote; a handover date that is met; and construction quality that is independently confirmed at acceptance by the licensed master builder partner. Anyone planning a construction project in Vienna does not want surprises — and that is exactly what we do not deliver: neither on costs nor on the schedule.
How to check whether someone is a master builder
| Check | Where | What you see |
|---|---|---|
| Trade licence | GISA, public and free of charge | whether “Baumeister” is validly registered, and for which company |
| Company register | Extract from the company register | Company, management, registered office |
| Managing director under trade law | GISA entry | who actually holds the qualification |
| Liability insurance | Ask to see the policy | Sum insured and validity |
| Quote | Letterhead and bill of quantities | who the contractual partner is and who carries out the work |
Who may do what in construction
| Activity | Authorisation | Basis |
|---|---|---|
| Planning, permit submission, structural design, acting as responsible site manager | licensed master builder | § 94 no. 5 GewO |
| Drywall, tiling, painting, floor laying, insulation | regulated crafts | § 94 nos. 67, 38, 47, 7, 79 GewO |
| Electrical engineering | licensed electrical engineer | § 94 no. 16 GewO |
| Gas and sanitary engineering | licensed plumber | § 94 no. 25 GewO |
| Title “Baumeister” | only with a master builder licence | § 99 (5) GewO |
What do master builder services in Vienna cost?
Master builder services are regulated — the price depends on the actual effort. As a guide:
As of 2026 · Regulated master builder services under § 94 no. 5 GewO are carried out by licensed partner companies; Skyline Bau carries out the construction at a fixed price according to ÖNORM B 2110. Final price after site visit.
Particularities
Building in existing structures has legal and structural particularities where a licensed master builder is needed. What matters:
- Gründerzeit building stock — buildings from 1880–1914 with rubble stone walls and timber beam floors follow their own structural rules. Interventions in the load-bearing structure belong in the hands of a master builder.
- Structural design is a matter for the master builder — structural calculations and permit planning are reserved for the licensed master builder under § 94 no. 5 GewO. We carry out and coordinate; the partner company is responsible for the structural design.
- MA 37 building police — interventions in load-bearing components require a permit. Permit plans and structural design come from the master builder partner, construction from us.
- Protection zones & MA 19 — in protection zones, visible changes to facades and windows are restricted and must be agreed with MA 19.
- Occupied apartment buildings — in existing buildings, work usually takes place while the building is in use — scheduling and consideration for residents are decisive.
- One contractual partner — you commission one company; we bring together master builder partners and the other trades and are responsible for the process.
Master builder services Vienna for homeowners, property management & owners' associations
Clients planning a loft conversion
Anyone planning a loft conversion first needs a structural assessment of the existing building by a licensed master builder. We coordinate this assessment through our master builder partner and carry out the construction work. Order: first clarify the structure, then build.
Property managers & owners’ associations
In the event of damage to the load-bearing structure or a planned extension upwards, an owners' association needs the assessment of a licensed master builder. We provide the documented basis for the owners' resolution and coordinate the master builder partner.
Developers & investors
Anyone buying an old building to add storeys wants to know before the purchase what is structurally possible. We provide reliable fixed prices with a survey of the existing building — the structural feasibility is assessed by the master builder partner.
From the plan to the handover
What is a licensed master builder under Austrian law?
Anyone looking for a master builder in Vienna quickly comes across the question: what is a licensed master builder actually allowed to do — and what is a building contractor without this licence not allowed to do? The answer is in two sections of the Austrian Trade Regulation Act, and it is clear:
- § 94 no. 5 GewO defines the master builder trade as a regulated trade — the qualification examination is a prerequisite (TU Wien graduate or equivalent qualification, plus practical experience).
- § 99 GewO regulates the scope of authorisation: drawing up plans for building and civil engineering works, structural and building physics calculations, submission to the building authority (in Vienna MA 37), responsible site management and turnkey construction.
The master builder thus bears overall technical and legal responsibility for a construction project — from the first sketch to final acceptance. This licence is the highest trade-law authorisation in Austrian construction and distinguishes a master builder company from a pure craft business carrying out work.
Skyline Bau itself does not hold the master builder licence — we act as a building contractor. We award the regulated master builder services for your projects to licensed master builder partners from our network and integrate them into a single fixed-price contract according to ÖNORM B 2110 (2023 edition). This separation is required by law (§ 366 GewO) and protects clients from unauthorised trading.
Why commission Skyline Bau instead of a classic master builder company directly?
Going directly to a licensed master builder is a viable route — if you want to take on the coordination of interfaces yourself. With Skyline Bau, these interfaces are coordinated for you at no extra charge:
First — fixed price instead of unit price risk. Classic master builder companies often work with unit price calculations; changes in quantities during construction lead to extras. Skyline Bau provides a binding fixed price according to ÖNORM B 2110 (2023 edition) — what is in the quote applies.
Second — all trades from a single source. With a master builder company, the service often ends after shell construction plus interior fit-out. Skyline Bau also coordinates electrical engineers under § 94 no. 16 GewO, gas and sanitary engineers under § 94 no. 25 GewO and tilers under § 94 no. 38 GewO within the same fixed-price contract.
Third — federal reference. In 2022 Skyline Bau worked as a subcontractor on the renovation of the Austrian Parliament. A documented large-project reference that many medium-sized companies cannot show.
Protection zones, building freezes and the Vienna Building Code
Anyone building or renovating in Vienna has to deal with two particularities: protection zones and building freezes. Protection zones protect the townscape within the meaning of the Vienna Building Code — in the Innere Stadt, in Gründerzeit quarters and in locations that shape the townscape. For projects in protection zones, MA 19 Architecture and Urban Design is also involved — it examines facade, roofscape, choice of materials and colours. Skyline Bau knows the requirements and agrees the project in advance.
Building freezes are temporary orders of the City of Vienna for districts or streets in which new buildings are restricted — for example until a new zoning plan comes into force. Under a building freeze, MA 37 is stricter; certain projects are not approved at all or only with conditions. Before construction starts, clarifying the current building freeze situation is mandatory — Skyline Bau checks this as standard.
We work exclusively according to the Vienna Building Code (Bauordnung für Wien), OIB Guidelines 1 to 6 and the Austrian earthquake standard ÖNORM B 4015. Vienna's seismic zone requires dynamic calculations for new buildings and larger conversions — Vienna is not in a highly active earthquake area, but the requirements are real and must be met.
How Skyline Bau deals with master builder services
Skyline Bau is a building contractor in Vienna and not a master builder. We coordinate construction projects in Vienna — from detached houses to apartment building renovation and commercial buildings — and integrate licensed master builder companies and all other authorised specialists into a single fixed-price contract according to ÖNORM B 2110.
What sets Skyline Bau apart: a vetted network of licensed master builders in Vienna — we know who is particularly good at which construction tasks (old buildings, new builds, apartment buildings, loft conversions, structural upgrading). A clear separation of responsibilities: Skyline Bau is responsible for project management, the licensed master builder for technical responsibility. You have one contract, one fixed price, one contact person — and the certainty that all trades are carried out by validly authorised companies. €3 million construction liability insurance, references with original documents on the references page.
Subsidies: wohnfonds_wien, Hauskunft and renovation cheque
Anyone building or renovating in Vienna deals with three central subsidy and advisory structures. wohnfonds_wien is the subsidy body for residential building renovation — it checks applications, controls subsidies and monitors construction progress. Hauskunft Wien is the city's free advisory service for all renovation questions — from the first concept to subsidy eligibility. The federal renovation cheque (replacing the discontinued renovation bonus since 02.02.2026) subsidises thermal measures with up to 40 percent of the costs.
Skyline Bau works routinely with all three structures: planning is coordinated so that the measures actually meet the subsidy criteria — from the energy performance certificate before and after renovation to the U-value limits of the individual subsidy schemes. For apartment buildings, the basic renovation scheme of wohnfonds_wien is also an option, which makes larger renovation packages substantially cheaper.
Light or heavy loft conversion
A frequently requested focus of our general contractor work is loft conversion in Vienna. The Vienna Building Code distinguishes two categories: light loft conversion with a weight increase of at most 720 kg/m² of roof area (timber construction, without extensive structural upgrading) and heavy loft conversion (with screeds, tiles, full bathrooms — requires structural upgrading of the entire building).
A turnkey loft conversion in Vienna costs €3,000 to €4,000/m². Skyline Bau carries out the construction work and coordinates all trades. Planning, structural design and acting as responsible site manager in the legal sense are provided by a licensed master builder partner company (§ 94 no. 5 GewO) from a single source. Subsidies are possible through wohnfonds_wien for the creation of new living space.
Scope of authorisation under § 99 GewO in detail
The exact scope of authorisation of a licensed master builder results from § 99 (1) to (6) GewO. Anyone commissioning a master builder commissions a provider of several services:
- § 99 (1) GewO: drawing up plans for building and civil engineering works and constructing these structures.
- § 99 (2) GewO: structural and building physics calculations — the master builder may do structural design themselves, without an external civil engineer.
- § 99 (3) GewO: responsible site management and construction supervision on the property.
- § 99 (4) GewO: expert activities in construction.
- § 99 (5) GewO: turnkey construction of buildings, including activities of other regulated trades (within certain limits).
- § 99 (6) GewO: building physics reports — sound insulation, thermal insulation, moisture protection, fire protection.
The licensed master builder thus bears overall technical and legal responsibility for a construction project. At Skyline Bau, this is coordinated by a building contractor set-up with licensed master builder partners — we bundle responsibility in the fixed-price contract without Skyline itself having to hold the licence.
The master builder qualification examination in Austria
Anyone who wants to become a licensed master builder in Austria goes through a demanding qualification path:
- TU Wien graduate (civil engineering) or equivalent university degree plus several years of practical experience.
- Qualification examination at the Austrian Economic Chamber (WKO) — commercial, legal and technical examination. PAK Immobilien Bildungs GmbH is the leading preparatory academy.
- Proof of practical experience — typically 4–5 years with a licensed master builder.
- Registration with the master builders' guild of the WKO Vienna construction guild.
These high hurdles are the reason why there are comparatively few licensed master builder companies in Vienna — and why Skyline Bau works with a network of vetted partners instead of holding the licence itself. The advantages remain with the client: legally secure construction with a fixed price according to ÖNORM B 2110:2023.
Clarification: who we are — and who we are not: not a master builder ourselves
Skyline Bau is a building contractor, not a licensed master builder company itself. We coordinate regulated master builder services (§ 94 no. 5 GewO) exclusively through authorised subcontractor partner companies. This clarification is important to us and is in line with the Vienna Building Code and the Trade Regulation Act. If you are looking for information on master builders on this page — you are in the right place. If you are specifically looking for a building contractor for your construction project — you are also in the right place with us.
The master builder profession: term and job profile
- Master builder (Baumeister) under § 94 no. 5 GewO is a regulated profession in Austria. It requires a qualification examination and registration with the WKO construction guild.
- Master builder authorisations: planning, site management and construction of buildings as well as structural interventions. Plus scaffolding and earthworks.
- Master builders' guild: the Vienna construction guild within the Economic Chamber. An industry body with around 1,500 master builder companies — there you can check whether a company is a member.
- Vocational training: apprenticeship, foreman school, HTL or civil engineering degree plus practical experience and qualification examination.
- Insurance standard: master builders typically have construction liability insurance of €3–5 million. Skyline Bau coordinates with master builder partners in this insurance class.
- Warranty for master builder services: 3 years under § 933 ABGB.
- Master builder focus areas: shell construction, masonry, concrete and reinforced concrete construction, plastering, screed, foundations, structural work.
When do you need a master builder and when a general contractor?
Pure master builder services
If you only need masonry, plaster, screed, foundations or structural interventions — and want to coordinate the other trades yourself.
A building contractor such as Skyline Bau
If you have a construction project with several trades (e.g. complete renovation, extension, thermal renovation) and want one contractual partner for all trades — with a fixed price according to ÖNORM B 2110:2023.
Construction management / developer
If you as the client want to act as developer yourself and are looking for a construction management office for planning and contract management.
Engineering office / civil engineer
If you only need planning and structural design — and want to award the execution separately.
Which master builder services Skyline Bau coordinates through partners
- Shell construction: masonry, reinforced concrete floor slabs, reinforced concrete walls, stairs, foundations — entire shell construction up to the shell.
- Plastering: interior and exterior plaster (lime plaster, lime-cement plaster, renovation plaster, decorative plaster). Special plasters for Viennese Gründerzeit buildings.
- Screed work: cement screed, calcium sulphate screed (anhydrite), dry screed. Including heating screed for underfloor heating.
- Foundation work: strip foundations, floor slab of reinforced concrete C25/30, deep bored foundations for difficult ground conditions.
- Masonry renovation: renovation plaster system, horizontal barrier (chemical or mechanical) against rising damp, brick replacement in Viennese Gründerzeit buildings.
- Structural interventions: wall openings with steel beams, floor renovation work, structural strengthening.
- Full building construction: from the building application to the key handover — Skyline Bau as the building contractor.
The most important standards and regulations
- Vienna Building Code (WBO) — the central legal basis.
- Old Town Preservation Act — protection of historic building fabric, protection zones.
- OIB Guidelines 1–6 — Austrian building technology standard. Binding for buildings.
- ÖNORM B 1991 family — Eurocode 1: actions on structures.
- ÖNORM B 1992 family — Eurocode 2: reinforced concrete design.
- ÖNORM B 4710-1 — concrete standards.
- ÖNORM B 2110 (2023 edition) — works contract with a fixed price.
- BauKG (Construction Work Coordination Act) — safety and health protection plan.
- ASchG (Employee Protection Act) — site safety.
- GewO § 94 no. 5 — master builder qualification.
Why work with Skyline Bau as your building contractor?
First — one contractual partner for all trades. We coordinate master builder services (§ 94 no. 5 GewO), electrical engineering (no. 16), sanitary engineering (no. 25), heating engineering (no. 31), tilers (no. 38) and all other trades. One contract, one invoice, one warranty of 3 years under § 933 ABGB.
Second — fixed price according to ÖNORM B 2110:2023. You receive a bill of quantities with fixed items. What is in it applies. Extras only arise if you commission a change yourself or something comes to light in the existing building that nobody could see beforehand — with Viennese Gründerzeit fabric, for example, hidden moisture damage. We discuss both in writing beforehand, before any work is done.
Third — €3 million construction liability insurance and a statutory warranty of 3 years under § 933 ABGB. We will give you the policy number on request. Check this — with us and with every other provider.
Fourth — transparency about the trade licence. The trade licence is stated in the legal notice and can be checked in GISA, and we say openly which services we carry out ourselves and which go through licensed partners. Master builder services under § 94 no. 5 GewO — planning, structural design, submission to MA 37 — are provided by our master builder partner. Shell construction, facade insulation, adding storeys, loft conversion, foundations, demolition, excavation, grading, attic floor insulation and basement ceiling insulation we carry out ourselves as a building contractor in Vienna. You see who does what before the contract is signed.
Skyline Bau acts as an executing building contractor. Regulated trades — in particular master-builder services (§ 94 no. 5 GewO), planning and structural engineering, electrical engineering (§ 94 no. 16 GewO), gas and sanitary engineering (§ 94 no. 25 GewO) and tiling (§ 94 no. 38 GewO) — are carried out exclusively by suitably authorised subcontractors and partner companies. Construction work is performed by trade businesses within the group of companies that hold a valid trade licence.
Ask every provider for their GISA number. We give ours without being asked.
Three things you should ask for from every contractor.
What you receive from us before signing the contract
A lot is claimed in construction and little is proven. These three proofs are the difference between a promise and a commitment — and you should ask every contractor for them, not just us.
1. The GISA number
Ours: 37945732 (Bling Bling GmbH, construction trade business under § 99 GewO). Publicly searchable in GISA — checked in thirty seconds. A business that does not want to give you its number has a reason for it.
2. Proof of authorisation of the partner companies
For structural engineering (§ 94 no. 5), electrical work (§ 94 no. 16), gas/plumbing (§ 94 no. 25) and tiling (§ 94 no. 38) we use licensed companies. You receive their proof of authorisation before signing the contract — not on request, not later.
3. A fixed price according to ÖNORM B 2110
With a bill of quantities. It also states what is not included. Extra work only with your written consent — with photo documentation before work continues.
And what we document is something you normally never see: photos of the rough installation before the walls are closed. The waterproofing before tiling. Both disappear behind plaster and tiles — and both decide whether the property will still be watertight in twenty years. You receive the pictures at handover. Not on request.
What we do not promise.
Four things you hear elsewhere — but not from us
Trust does not come from someone promising everything. It comes from someone telling you where the limits are.
- “We are the cheapest.” — We are not. Anyone who ignores drying times, leaves out the waterproofing and does not price in disposal is cheaper. Until the final invoice.
- “It can be done in two weeks.” — Cement screed needs around 28 days to be ready for floor coverings. That is physics, not a matter for negotiation. Anyone who promises it anyway is working against the drying time — and in two years you will have hollow-sounding tiles.
- “I can tell you right away on the phone what it costs.” — No. What a renovation costs is decided by the condition behind the wall. You only see it after opening up. A price given over the phone is either too high — then we lose the job — or too low, and then the extra charges follow.
- “We do everything ourselves.” — We are not allowed to. Structural engineering (§ 94 no. 5), electrical work (§ 94 no. 16), gas/plumbing (§ 94 no. 25) and tiling (§ 94 no. 38) are regulated. Anyone who claims to do all of this themselves either holds four licences — or has a problem.
When you do not need us
Not every project needs a building contractor. During the site visit we will tell you honestly if we are the wrong choice for you — even if it costs us a job.
A single trade
If you only need a painter, you do not need a coordinator. Hire the painter directly — it is cheaper.
Mainly structural engineering and planning
If your project consists mainly of permit planning and structural calculations, go directly to a licensed master builder. A building contractor in between is one level too many.
Technically sound, just old
Copper pipes, waterproofing intact, no damp damage? Then a cosmetic refresh is enough. Save your money.
Why we say this: A customer we sold an unnecessary renovation to will not come back and will not recommend us. A customer we told honestly that their bathroom will last another ten years will call us in ten years — and in the meantime, when the riser pipes in the building are due for replacement.
Reference: Parliament building Vienna
- Parliament building Vienna 1010 — renovation 2022 — On the 2nd basement level of the Austrian Parliament building (Dr.-Karl-Renner-Ring 3), Skyline Bau carried out drywall, painting and filling work as well as floor upgrades. Regulated trades — electrical engineering (§ 94 no. 16 GewO) and tiling (§ 94 no. 38 GewO) — were carried out by licensed partner companies, coordinated by Skyline Bau. Client: W+R Schirmungstechnik GmbH. The reference letter dated 17.10.2022 certifies that the work was of high quality, on schedule and economical. View reference letter as PDF
- What this proves — In the Parliament building, nobody works according to a brochure. There are security requirements, access controls, tight time windows and an acceptance inspection that does not let any carelessness pass. Anyone who passes there can also handle a tenement building renovation with 30 households.
- And what it does not prove — It did not make us a licensed master builder. The regulated trades there were also carried out by authorised partner companies. That is not a weakness but the legal order — and we abide by it.
what you should know
So that you know exactly what to expect, we answer the most important questions here — honestly and from the practice of a building contractor that does the work itself.
What does a master builder do?
A master builder (Baumeister) is a licensed trade with comprehensive authorisations: planning, structural calculation, construction and site management. Master builder work is regulated and may only be carried out by authorised companies. Skyline Bau works as a building contractor together with licensed master builder partner companies.
What is the difference between a master builder and a building contractor?
The master builder holds the trade licence for regulated construction work including structural design and planning. A building contractor coordinates and carries out construction work and brings in licensed partners for regulated trades. What counts for you as a customer is the result from a single source — we organise both.
Who takes on regulated master builder work?
Regulated work such as structurally relevant interventions, structural planning or construction measures requiring a permit is carried out by our licensed master builder partner companies. We coordinate the project so that you have one contact person.
What does a master builder cost in Vienna?
The costs depend on the service and the scope of the project — from the structural assessment to complete construction. After a site visit you receive a binding fixed-price quote.
Master builder services in all 23 districts of Vienna
Master builder services are provided by licensed partner companies; we take care of coordination and execution – in every district. We work in 1010 Innere Stadt, 1020 Leopoldstadt, 1030 Landstraße, 1040 Wieden, 1050 Margareten, 1060 Mariahilf, 1070 Neubau, 1080 Josefstadt, 1090 Alsergrund, 1100 Favoriten, 1110 Simmering, 1120 Meidling, 1130 Hietzing, 1140 Penzing, 1150 Rudolfsheim-Fünfhaus, 1160 Ottakring, 1170 Hernals, 1180 Währing, 1190 Döbling, 1200 Brigittenau, 1210 Floridsdorf, 1220 Donaustadt, 1230 Liesing. What is typical in which district is on the page construction company Vienna.
Finding a master builder in Vienna through a recommendation – and checking the recommendation
Most clients first ask friends and acquaintances. That is a good start, because anyone who has built themselves knows whether deadlines were met and defects remedied. But a recommendation is only worth as much as the comparability of the projects: someone who had a bathroom renewed by a company can say little about how the same company handles a loft conversion with new structural design.
So ask specifically: how large was the project? Were there extras, and how were they justified? Who was on site every day, and who only signed? Was a formal handover carried out at the end? Then check the authorisation yourself in the public Austrian trade information system – it takes two minutes and shows which trade is actually registered. Also ask whether you may visit an ongoing site. Tidiness, safety measures and the way neighbours are treated often say more than any praise on the internet.
Is a master builder licence valid throughout Austria?
Yes. Although a trade licence is registered with a particular authority, it is valid for the whole country. A master builder from Graz or Linz may therefore also plan and build in Vienna. What changes is the building law: building codes in Austria are a matter for the federal states. In Vienna the Vienna Building Code applies, with its own rules on building classes, protection zones, loft conversions and parking spaces; in Lower Austria the Lower Austrian Building Code 2014. Companies that mainly work in another federal state often know the Viennese procedures at the building police, the requirements for permit plans and the typical conditions for Gründerzeit buildings less well. For a project in Vienna it is therefore worth asking how many projects the company has already handled here.
How the master builder licence is granted
Master builder is a regulated trade. Anyone who wants to practise it must prove their qualification – usually through the qualification examination together with the required practical experience – and then registers the trade with the trade authority, in Vienna with the responsible municipal district office. The authority checks the documents before the authorisation is entered.
A limited company (GmbH) can also practise the trade if it appoints a person with this qualification as managing director under trade law. This person must actually work in the company and is responsible to the authority for proper practice of the trade. For you as the client this means: behind every company with a master builder licence there is a named expert. Ask who that is and whether they personally accompany your project or are only formally behind it. The register also shows since when the authorisation has existed and whether it is dormant.
What you should bring to the first meeting
The more documents are available, the more concrete the first assessment. Helpful are existing plans, old building permits or official decisions, a land register extract for ownership questions, photos of problem areas and an honest indication of budget and time frame. For old buildings in Vienna, the permit plans are often in the plan archive of the building police; obtaining a copy saves surveying effort later. Anyone who also knows whether the building is in a protection zone saves a planning round. For coordinating an entire project with several trades, a general contractor is the right contact; for ongoing supervision, construction management.
Frequently asked questions about the master builder licence
How do I recognise a dubious construction quote?
Is Skyline Bau a licensed master builder?
When do I definitely need a licensed master builder?
What may a master builder do — and what a construction trade business?
How do I find a licensed master builder in Vienna?
Can I commission Skyline Bau if I need a master builder?
Who is liable for the work of the master builder partner company?
What is wohnfonds_wien?
What is Hauskunft Wien?
What do “light loft conversion” and “heavy loft conversion” mean?
What distinguishes a construction company from a licensed master builder partner?
What may a master builder do in Vienna?
What is a protection zone?
What is a building freeze in Vienna?
What happens to the lightning protection during structural work?
Is an MA 37 permit needed in Vienna?
Does Skyline Bau provide the structural engineer itself?
Which symptoms point to problems with the existing building?
How important is a pre-construction survey of neighbouring buildings?
Which insurance covers wall damage?
Can I have just one house wall underpinned?
Are there subsidies for renovation measures in Vienna?
How do I check whether someone is a master builder?
Master builder: is Skyline Bau a master builder?
Who may call themselves a master builder?
Do I need a master builder for my project?
How can I tell whether a recommendation for a master builder is any good?
May a master builder from another federal state build in Vienna?
What is a managing director under trade law?
Glossary & technical terms
Regulated trade. Only licensed master builders may plan, calculate and manage building construction and act as responsible site manager. The professional title is protected.
Trade licence for carrying out construction work within a defined scope, without the full planning and calculation rights of a master builder.
The number in the Austrian trade information system. It allows a public check of which trade licence a company actually holds.
Proof of the professional qualification required by a regulated trade — for master builders, the master builder qualification examination.
The Austrian standard for construction contracts — it regulates extras, deadlines and warranty and creates a fair, binding contractual framework.
The plans including structural design required for the building permit from MA 37. Reserved for the licensed master builder.
Proof of a building's load-bearing capacity. Structural calculations are a matter for the master builder and are the responsibility of the licensed partner.
A company that takes on and coordinates all trades of a construction project — with one contract and one contact person for the client.
Comparison of options
| Option | When it makes sense |
|---|---|
| Licensed master builder directly | If you only need structural design, permit plans or a master builder's certificate — without construction. |
| Skyline Bau + master builder partner | If the master builder service is part of a construction project and you want one contractual partner for all trades. |
| General contractor | For turnkey large projects with complete takeover of all planning and construction services. |
Reference projects
Apartment building renovation, Innere Stadt
Structural renovation of Gründerzeit fabric with coordination of the master builder partner for the structural parts.
Loft conversion preparation
Construction preparation for a loft conversion; the structural assessment of the existing building was carried out by the licensed master builder partner.
Adding a storey to a multi-occupancy building
Execution of the construction work for adding a storey, structural design and permit submission through the master builder partner.
Related services Skyline Bau
Related services
Building finished? The cleaning comes from the same source.
Every construction project ends with post-construction cleaning. Our partner company Bling Premium Reinigung takes care of it, coordinated with the construction schedule. More at bling-bling.at.
Send enquiry
Enquire directly here — fixed-price quote free of charge. Skyline Bau replies within 2 working days.
Ready for your construction project in Vienna?
Write to us directly on WhatsApp — send photos. Reply within 2 working days.
Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and is not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted construction trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (Baumeister). Under § 99 (5) GewO, the title “Baumeister” is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master-builder services, structural engineering, gas and sanitary engineering, electrical engineering — are carried out exclusively by authorised, licensed partner companies.