Pre-construction condition survey Vienna record the condition before work starts next door.

Pre-construction condition survey Vienna: from the contractor who does the work — not from a broker.

Pre-construction condition survey Vienna: a condition survey for evidence purposes (Beweissicherung) costs €450 to €900 for a flat in Vienna and €2,500 to €6,500 for a tenement building. Inspection with photos, crack log, measuring points and report – the basis for being able to prove later what was already there beforehand and what was not.

A condition survey does not decide whether damage occurs, but who pays for it. When excavation, demolition or piling takes place next to a building, cracks often appear. Without a documented initial condition, it is one person's word against another's, and whoever claims the damage has to prove it – not the other way round. A report with photos, crack widths and measuring points before construction begins reverses this situation: whatever is not in the report is new. That is the entire purpose, and that is why timing matters more than scope.
✓ Documented before construction starts✓ Crack log with measurements✓ Vibration and settlement monitoring✓ Follow-up survey after completion✓ Report in digital and printed form

When a condition survey is necessary

ReasonWhy it is criticalUrgency
Excavation pit right on the property boundaryGround unloading, settlement of the neighbouring buildingvery high
Demolition of the neighbouring buildingVibration, loss of the shared party wallvery high
Underpinning, bored piles, sheet pilingVibration and ground movement at the same timevery high
Loft conversion in your own buildingChange in loads, cracks in the flats belowhigh
Road or sewer works in front of the buildingVibratory rollers, excavator work, groundwater loweringhigh
Underground railway and tunnel construction nearbySettlement over a greater distancehigh
Renovation in the same buildingDisputes with co-owners over existing damagemedium
Taking over a rented propertyDistinguishing between previous and new tenantmedium
The right moment is before the first dig of the excavator, not after the first crack. A condition survey prepared only after construction has begun loses exactly what makes it valuable: the undisputed initial condition. Anyone who only reacts when things start cracking is already documenting a changed condition and must additionally prove that the damage was not there before. As soon as the building permit hearing (Bauverhandlung) has been scheduled or a site fence is up, it is time.

Pre-construction condition survey Vienna: costs 2026

PropertyScopePrice netTime on site
Single flatInterior rooms, photos, crack log450–900 €1–2 hours
Detached house with outdoor areainside and outside, cellar, boundary walls and fences900–1.800 €half a day
Small residential building up to 6 unitsCommon areas and units1.400–3.200 €half to a full day
Tenement building up to 20 unitsFacade, stairwell, cellar, units2.500–6.500 €1–2 days
Additional residential unitper unit, during the same appointment120–260 €20–40 minutes
Commercial property, hallFloor, structure, gates, building services1.600–5.500 €depending on size
Follow-up survey after completionComparison with the initial survey40–60% of the initial surveyas above
Pre-construction condition survey Vienna: costs 2026 – net price overview
Pre-construction condition survey Vienna: the prices from the table at a glance, as of 2026, net.

Individual items

ServiceUnitPrice netNote
Inspection with photo documentationlump sumincluded in the base pricenumbered images with location details
Crack log with width measurementper crackincluded in the base priceCrack width measured with a crack gauge
Crack monitor installedpc.45–90 €readings possible over months
Plaster tell-tale setpc.25–45 €the simplest form of crack monitoring
Levelling point setpc.60–120 €for settlement monitoring
Levelling, measurement roundAppointment280–550 €Initial measurement and follow-up measurements
Vibration measuring deviceMonth350–750 €Installation and evaluation charged separately
Continuous monitoring with recording and alarmMonth450–900 €Exceeding a limit value is reported
Report in digital and printed formpc.included in the base priceadditional copy €60–120
Attendance at a building permit hearingAppointment280–550 €on request

The base price covers the standard case: inspection, photos, crack log, report. It becomes more expensive through quantity and access – many units, locked cellar compartments, inaccessible areas of the facade. It becomes cheaper when appointments are bundled and the property manager has arranged access in advance.

The legal side in plain words

Two points determine how a condition survey works in a dispute: who has to prove what, and how credible the document is.

QuestionPrincipleWhat this means in practice
Who has to prove it?whoever claims the damagewithout before documentation, that is the injured party
Liability for excavationExcavation must not deprive the neighbouring plot of its support (§ 364b ABGB, Austrian Civil Code)The party carrying out the construction must secure it, not the neighbour
Vibrations and nuisancelimits under neighbour law (§ 364 ABGB)what is customary for the area is a matter of interpretation, measured values help
Construction approved by the authoritiesProhibition usually ruled out, compensation possibleall the more important to document the damage properly
Court-ordered preservation of evidenceApplication under §§ 384 ff ZPO (Austrian Code of Civil Procedure)The court appoints an expert witness
Private condition surveyPrivate expert report or survey reportquick, cheaper, in a dispute a documentary record and basis
The difference between a private and a court-ordered preservation of evidence is not the quality of the survey, but its standing in the proceedings. A private survey report is a document that is submitted to and used by the court; an expert witness appointed by the court prepares an expert opinion for the proceedings themselves. In practice, almost everything starts privately, because it is quick and inexpensive – and because a complete before report in most cases means that it never comes to proceedings at all. The other side sees that everything has been documented and settles.
CriterionPrivate condition surveyCourt-ordered preservation of evidence
TriggerCommissioned by the owner or the party carrying out the constructionApplication to the court
Lead timea few daysweeks to months
Costs€450–6,500 depending on the propertyExpert witness usually €1,500–5,000, plus court fees
Access to the neighbouring propertyonly with consentenforceable through the court
EffectDocumentary record, basis for negotiationEvidence in the proceedings
Typical usebefore construction begins, comprehensiveif access is refused or there is a dispute

We prepare the private condition survey. If court proceedings are necessary or an expert opinion on the question of liability is required, that is a task for a court-appointed expert or your lawyer – our documents then serve as their starting material and save time and costs there.

Who needs the condition survey – and who pays for it

RoleInterestWho usually pays
Neighbour next to the construction siteBeing able to prove damage to their own buildingoften the party carrying out the construction, otherwise themselves
Client, developerfending off unjustified claimsthemselves, as part of the construction costs
General contractorDistinguishing from pre-existing damagethemselves or via the client
Property managerObligations towards the owners' associationThe association's reserve fund
Flat ownersKnowing their own flat is documentedproportionately or themselves
TenantDistinction at handoverthemselves
In practice, the party carrying out the construction commissions the survey of the neighbouring buildings itself – because it protects them, not the neighbour. Whoever builds carries the greater risk: after completion, cracks are reported that have existed for twenty years, and without a before report this cannot be refuted. A complete report costs the party carrying out the construction a fraction of a single unjustified claim. The same applies in reverse for the neighbour: if no condition survey is offered, commissioning one yourself is worth the money.

If access to the neighbouring flat is refused, documentation can be carried out from outside – facade, plinth, boundary walls, visible areas. That is less, but better than nothing, and the attempt, with a written request for an appointment, is itself recorded in the report.

The process

PhaseWhat happensDuration
1. Enquiry and scopeWhich properties, which units, what occasion, which date on the neighbouring site1 day
2. SchedulingAccess via the owner or property manager, notice posted in the building3–10 days
3. Exterior inspectionFacade, plinth, party wall, boundary walls, pavement, cellar entrance1–3 hours
4. Interior inspectionRooms, ceilings, walls, floors, windows, doors, stairwell, cellar20–40 min. per unit
5. Setting measuring pointsCrack monitors, plaster tell-tales, levelling points, if agreedhalf a day
6. ReportNumbered photos, crack list, site plan, summary3–7 days
7. Follow-up surveythe same inspection after completion, point-by-point comparisonas for the initial survey

The actual construction period lies between phases 6 and 7. If measuring points are monitored or vibrations recorded during this time, these measurements run in parallel and are incorporated into the final report. Without ongoing measurement, comparing the initial survey with the follow-up survey is sufficient – and in most Viennese cases, that is exactly what is needed.

What is documented

AreaWhat is recordedWhat receives particular attention
FacadeRendered surfaces, cornices, window reveals, plinthexisting cracks, hollow spots, detached render
Party wall to the neighbouring buildingSurface, junctions, metal flashingsthe most critical area during demolition
Interior wallsPlaster, paint, wallpaper, wall junctionsCracks above doors and windows
CeilingsPlaster, stucco, ceiling junctionsCracks along the timber joists in period buildings
FloorsParquet, tiles, screed, skirting boardsloose tiles, joint cracks, height offsets
Windows and doorsFunction, closing behaviour, glasssticking casements as a sign of settlement
StairwellSteps, railings, landings, wallsCracks around the bearings
BasementVaults, masonry, floor, moisture patternCracks at the crown of the vault, moisture line
Outdoor areasBoundary walls and fences, paving, retaining walls, garagessettlement shows here first
Building servicesvisible pipes and cables, radiator connectionsvisible only, no openings made
A usable report contains measurements, not impressions. “Crack present” is worthless. What is usable: room, wall, position in metres from the corner, length, width in tenths of a millimetre measured with a crack gauge, course, photo with the scale in the picture and a number. Only in this way can it be shown later that a crack has grown from 0.2 to 1.1 millimetres – and precisely this change is the point argued over in a dispute.

Recording and monitoring cracks correctly

MethodHow it worksCostsSuitable for
Crack gauge and photoThe width is measured at the crack and captured in the imageincluded in the base pricestandard for every report
Plaster tell-taleA plaster bridge over the crack that breaks if it moves25–45 €a simple yes-or-no answer
Plastic crack monitortwo plates with a scale, read in millimetres45–90 €reading movement over months
Measuring studs with callipertwo studs, the distance between them is measured60–120 €more precise than a monitor
Electronic crack recordingcontinuous recording, digital read-outbased on effortlarge projects, cases likely to go to court

The choice depends on the risk, not on the budget. For an excavation pit with underpinning next door, monitors on the main cracks make sense; for a loft conversion two streets away, photos and measurements are enough. What applies in every case: a crack is not measured once but at least twice – at the beginning and at the end, ideally in between as well.

Not every crack is damage. Settlement cracks from the time of construction, shrinkage cracks in plaster and cracks at material transitions are part of the existing fabric of Viennese period buildings. What matters is change: a crack that has stayed still for decades remains harmless; a crack that opens by half a millimetre while the neighbouring site is active is a finding. That is exactly why the before condition is so valuable – it separates the existing fabric from what has been added.

Vibration monitoring

Vibrations occur during demolition, piling, drilling, vibrating and heavy vehicle traffic on site. Whether they are harmful does not depend on how it feels in the building, but on the vibration velocity at the building element – and that can be measured.

TermMeaningWhy it matters
Vibration velocityMovement of the building element in millimetres per secondthe decisive parameter for structural damage
FrequencyOscillations per secondlow frequencies are more critical
Measuring pointFoundation or masonry in contact with the groundmeasurement in a living room gives different values
Reference valueGuide value according to ÖNORM S 9020varies depending on the building class
Sustained exposuremany events over weeksmore critical than a single peak value
The values at which people feel uncomfortable are far below the values at which building elements are damaged. A vibration can be felt well below the threshold at which plaster cracks. That is why neighbours suspect damage where, technically speaking, nothing has happened – and also why a measurement helps both sides: it takes the feeling out of the discussion and replaces it with a record including date, time and value.
Construction activityTypical vibrationRange of effect
Demolition with a hydraulic hammerhigh, impulsivenoticeable up to about 30 m
Driving sheet pilesvery highfar-reaching, depending on the soil
Bored piles, underpinningmoderate, but long-lastingimmediate vicinity
Vibratory roller in road constructionhigh, at low frequencyalong the street frontage
Excavation with an excavatorlow to moderateclose to the property boundary
Concrete cutting, core drillinglowlocalised at the building element

Measurements are taken where the value is meaningful: at the foundation or at the masonry in contact with the ground facing the site. If an upper floor is measured as well, the amplification across the storeys becomes apparent – in Viennese period buildings with timber joist ceilings, this difference is considerable. For the construction site itself, the most important figure is not the peak value but how often a limit value was exceeded and during which activity. With this information the method can be changed before damage occurs – shears instead of a hammer, static pressing instead of vibrating.

Settlement monitoring: when the building moves

Cracks are the consequence, settlement is the cause. Where deep excavation takes place next to an existing building, the soil beneath the neighbouring foundation loses part of its lateral support and the building gives way – often by only a few millimetres, but unevenly, and it is precisely this unevenness that produces cracks.

StepWhat is doneAccuracy
Setting levelling pointsMeasuring studs in the plinth area, all the way roundpermanent, easy to locate again
Zero measurementLevelling before construction beginstenths of a millimetre
Follow-up measurementsat fixed intervals during constructionsame method, same points
Final measurementafter completioncomparison with the zero measurement
EvaluationDifferential settlement between the pointsshows tilting, not just subsidence
The dangerous quantity is not the settlement itself, but the difference between two points. If a building settles evenly by five millimetres, usually nothing happens. If one corner settles by five millimetres and the other by one, the masonry distorts and cracks. That is why levelling points are set all around the building and not just on the side facing the site – only comparing them with one another makes the measurement meaningful.

How often measurements are taken depends on the construction sequence: before excavation, after excavation, after the excavation support has been installed, after the shell construction, at the end. If conspicuous values appear, the interval is shortened. The measurement is not an end in itself – it is meant to show in good time that intervention is needed, while it is still a matter of millimetres.

Vienna-specific features

Vienna's building stock reacts differently from a new build of the last twenty years. Four characteristics determine what to look out for in a condition survey.

FeatureWhy it is sensitiveConsequence for the report
Gründerzeit brick masonry (built 1848–1918) on strip foundationsshallow foundations, little reinforcement, lime mortarreacts noticeably to settlement, cracks at openings
Timber joist ceilingsflex and amplify vibrations upwardsrecord ceiling cracks along the joists, do not leave out the upper floors
Shared party wallstructurally belongs to both buildingsdocument the condition on both sides, photograph the junctions
Brick vaulted cellarsload transfer via the vault shape, sensitive to movement of the supportsrecord the crown and bearing areas separately
Courtyard extensions and Pawlatschen (open access balconies)added later, often with weaker foundationsseparate crack survey, separate measuring points
High groundwater level in parts of the citygroundwater lowering on site moves the soil over a wide areasettlement monitoring more important than vibration monitoring
Groundwater lowering is the most underestimated trigger. An excavation pit that pumps out water changes the groundwater regime over a considerably greater distance than vibration reaches. In areas with cohesive soil layers or old timber pile foundations, this can lead to settlement while no hammer is running on the site itself. That is why the occasion determines what is measured: for demolition, the vibration; for excavation with dewatering, the height level.

Timeline: how much lead time is needed

TimingWhat needs to be done
Building permit hearing or site fence announcedObtain a quote, define the scope
4 to 6 weeks before construction beginscommission, coordinate appointments with the property manager
2 to 3 weeks beforeLetter and notice in the building, state the appointment window
1 to 2 weeks beforeInspection, setting measuring points, zero measurement
before construction beginsHand over the report, have receipt confirmed
during constructionMeasurements as scheduled, record reports
within 4 weeks of completionFollow-up survey and final report

Four to six weeks sounds like a lot, but it is realistic as soon as several parties live in the building. The inspection itself takes hours; finding appointments takes weeks. If time is short, the critical areas are recorded first – cellar, ground floor, street-facing facade and the flats on the property boundary – and the rest is caught up on as long as the construction work allows.

Which additional methods are used

ProcedureWhat it deliversWhen it is worthwhile
Photo documentationPhotographic evidence with allocationalways, the basis of every report
Video walk-throughspatial context, recorded quicklysupplementary, does not replace individual images
Drone images of the facadeupper facade areas and roof without scaffoldingtall buildings, inaccessible party walls
3D laser scandimensionally accurate image, comparable laterlarge projects, listed historic fabric
Thermographymoisture and thermal bridges made visiblewhen moisture is part of the dispute
Endoscopya look into cavities without opening them uprarely, when there is a well-founded suspicion

Anything beyond this is expert-witness work and no longer a condition survey. The boundary is simple: we record what is there. The assessment of who is liable for a change and how much the damage is worth is made in a dispute by an expert witness or the court – on the basis of what we documented beforehand.

The most common mistakes

  • Commissioned too late. The report is prepared when the excavator is already on site. The initial condition is then no longer undisputed, and half the purpose is lost.
  • Only the side facing the site documented. Settlement affects the whole building, and cracks often appear on the side facing away.
  • Photos without scale and without location. A hundred images without allocation are worthless in a dispute, because nobody can say which wall on which floor is meant.
  • No crack widths measured. Without a figure, no change can be proven – and that is exactly what it is all about.
  • Cellar left out. Settlement shows first in the cellar, and that is where documentation is most meaningful.
  • Only common areas recorded. Damage is later reported inside the flats – without a before report in the units, there is nothing to compare against.
  • No follow-up survey. The initial report alone proves nothing; only the comparison shows the change.
  • Measuring points removed or painted over during construction. Then the series of measurements has to start again from scratch.
  • Report only filed digitally and never read. Anyone reporting damage two years later should have the report to hand – including the date and proof of handover.

The first and the seventh points together account for most of the lost cases. Both cost almost nothing to avoid: one appointment before construction begins and one afterwards.

If damage occurs during construction

StepWhat needs to be doneWhy
1. Document immediatelyPhotos with date, measure the crack, note the timelinks it in time to the construction activity
2. Record the construction activitywhat happened on site that dayconnects cause and effect
3. Report in writingto the party carrying out the construction and the site management, with proof of deliveryprevents later arguments about who knew what
4. Interim surveyRe-measuring the known pointsdocuments the change during construction
5. Structural engineer if there is dangerfor cracks over 2 mm, deformations, sticking doorshave the load-bearing capacity assessed
6. Only then repairRepair once movement has stoppedcracks plastered over too early open up again
Cracks are only repaired once the movement has ended. Anyone who plasters and paints while the neighbouring site is active does the work twice and loses the evidence along the way. The exception is damage that affects use or safety – loose tiles above head height, falling plaster, sticking emergency exit doors. These are made safe immediately, but photographed and measured first.

What the report contains

  • Commission and occasion: who commissioned it, which property, which neighbouring site, what point in time.
  • Description of the property: type of construction, year of construction where known, storeys, use, general condition.
  • Inspection record: which areas were entered, which were not and why.
  • Photo documentation: numbered, with room and wall details, for cracks with a scale in the picture.
  • Crack list: serial number, location, length, width, course, photo number.
  • Site plan or floor plan sketch: position of the cracks and measuring points.
  • Measuring points: type, position, zero values.
  • Summary: conspicuous areas, recommendation for monitoring.
  • Handover: date, recipient, copies.

The report is handed over digitally and, on request, in print. Where several parties live in the building, each party receives its own section and the property manager the complete report – this avoids discussions about data protection while still keeping the document usable.

Insurance: which cover applies to what

Damage to neighbouring buildings is generally not borne privately by the client, but settled through insurance. Which policy applies depends on who caused the damage and how it arose.

CoverWho holds itWhat it usually covers
Public liability insurance of the contractor carrying out the workConstruction firm, demolition contractorDamage to the neighbouring building caused by its own activities
Client's liability insuranceClient, developerDamage arising from the construction for which the client is responsible
Contractors' all-risks insuranceusually the clientunforeseen damage to the construction project itself
The neighbour's buildings insuranceOwner or owners' associationdepending on the terms, often with recourse against the party responsible
Legal expenses insurancepossible for both sidescosts of proceedings, not the damage itself
Each of these policies requires the same thing: proof that the damage was caused by the construction project. This is exactly where most claims fail. If there is a before report with measured crack widths, settlement is usually undisputed and takes weeks instead of years. Without one, the case becomes a matter for an expert witness – and then clarification alone often costs more than the condition survey would have.

In practice this means: report the damage immediately, enclose the before report, offer the follow-up survey and only start repairs once approved. We compile the documents so that they can be used without further questions – crack list with before and after values, allocated photos, timing of the construction activity. What we do not do is assess the amount of damage for the insurer; that is for the expert witness or the quote of the contractor carrying out the repair.

What you can prepare yourself

  • Arrange access: cellar, loft, courtyard, garage – have keys and a contact person ready on the day of the inspection.
  • Gather existing documents: older photos, plans, previous expert reports, invoices for crack repairs. This separates old from new.
  • Point out known damage: wherever there has been cracking or damp before is recorded specifically.
  • Move furniture away from critical walls: walls behind wardrobes cannot otherwise be documented.
  • Obtain the site documents: who is carrying out the construction, who is the site manager, when which works will begin.
  • Take your own photos: with the date, even if a report will follow – duplicates never hurt.
  • Inform tenants: in a let property, announce it in good time, otherwise the appointment fails because of access.

The second point is the most valuable. Old images from a flat handover or an earlier renovation are often the best proof that a crack has existed for years – and spare you the argument over whether the report was complete.

How to recognise a proper condition survey

FeatureGood workmanshipWarning sign
Timingbefore construction begins, date documented“we'll do it if something happens”
Scopeinside and outside, cellar, all sidesonly the side facing the site
Cracksmeasured, numbered, in a list and planonly photos without measurements
Photosnumbered consecutively, room and wall namedimage folder without allocation
Areas not inspectedexplicitly noted in the reportsilently left out
Measuring pointsposition documented, zero values recordedmonitors without an initial value
Follow-up surveyalready provided for in the quotenot mentioned
HandoverReport with confirmation of receiptverbal promise
A report that records only the good is worthless. Some clients expect existing damage to be played down – that turns the purpose on its head. The existing cracks in particular are the valuable part: they prove what cannot later be blamed on the construction site. That is why we record every existing defect, even if it looks unpleasant, and describe how it presents.

Condition survey in your own building

Even without a neighbouring construction site, there are occasions for recording the condition – above all where several parties are involved and there may later be disputes over who caused what.

ReasonWhat is documentedBenefit
Loft conversion in your own tenement buildingtop-floor flats, stairwell, ceilingsClear distinction towards tenants and owners
Riser pipe replacementBathrooms, kitchens, penetrations, units belowclarifies water damage during the works
Lift installation in the courtyard or stairwellFlight of stairs, foundation area, adjoining flatsSettlement and cracks can be attributed
Facade and scaffolding workFacade, windows, metal parts, courtyard areasDamage caused by scaffolding can be proven
Handover of commercial premisesFloor, walls, building services, shopfrontsSettling accounts at handback
Before a complete renovation beginsthe entire existing buildingBasis for defining the scope of work

In these cases the scope is usually smaller and the benefit still high, because those involved remain in the same building and the dispute would otherwise smoulder for years. Anyone planning a riser pipe replacement or a loft conversion should include the condition survey directly in the preparation – it costs a fraction of the construction work and saves the longest discussions.

Price examples from practice

Worked example 1 · tenement building with 14 flats, the neighbouring plot is being excavated
Exterior inspection, facade, party wall, courtyard, boundary walls€780
14 flats and stairwell, photos and crack log€2,520
Cellar and vaults, moisture pattern€460
8 crack monitors and 6 levelling points set€1,140
Zero measurement, levelling€420
Report, digital and two printed copies€380

Total approx. €5,700 net for 14 units, which is around €405 per flat. The follow-up survey after completion was agreed at €2,600, the follow-up measurements at €420 per measurement round.

Worked example 2 · detached house, the neighbouring house is being demolished
Interior and exterior inspection, cellar, garage€1,250
4 crack monitors on existing cracks€280
Vibration measuring device, 6 weeks during the demolition work€980
Evaluation of events, matched to construction activity€460
Follow-up survey after demolition was completed€620

Total approx. €3,590 net. Two new cracks were identified and settled via the demolition contractor's contractors' all-risks insurance – without proceedings, because the before condition had been documented.

For developers, property managers and construction firms

If you build regularly, you need the condition survey not as a one-off service but as a fixed process. For this we work to a standard specification that only needs to be adapted for each project.

PointArrangement
Scopeall directly adjoining properties, plus buildings within the defined radius
Timingbefore the first activity likely to cause vibration begins
Appointment organisationLetter, notice, two appointment windows per building, cancellations recorded
Report formatuniform structure across all properties, delivered digitally
Follow-up surveywithin four weeks of the end of the critical work
Reporting channelsone point of contact for neighbours, response within 48 hours
BillingBase price per property, unit price per residential unit, measurements charged by effort
The best condition survey is the one the neighbour experiences as a courtesy. Anyone who writes to neighbours before construction begins, offers appointments and hands over the report noticeably reduces the number of later claims – not because less happens, but because mistrust turns into an orderly process. Conversely, every refusal to provide information during construction creates claims that end up more expensive than the entire condition survey.

For construction firms, we also carry out condition surveys as a subcontracted service when your own team is needed on site – to the same reporting standard and, on request, naming the client.

How this differs from our other services

SituationMatching service
Recording the condition before a neighbouring construction site startsCondition survey, this page
Repairing cracks once movement has stoppedMasonry repair
Assessing and remedying damp in masonryWall damp-proofing
Demolishing buildings completely or partiallyDemolition
Strengthening or underpinning foundationsFoundation underpinning
Checking the condition of a tenement building before purchaseTenement building renovation
Construction management and coordination on your own siteConstruction management

When you do not need us

Not every construction site nearby justifies a condition survey. If a loft is being converted two buildings away, without excavation and without demolition, the risk to your building is low – your own dated photos are sufficient here. The same applies if there is a street with undisturbed ground between your building and the site and work is only being carried out above ground. But as soon as there is digging, piling, underpinning or demolition, the situation changes – and then the report is the cheapest insurance you can take out in this context.

Frequently asked questions about condition surveys in Vienna

How much does a condition survey cost in Vienna?
€450 to €900 for a single flat, €900 to €1,800 for a detached house, €2,500 to €6,500 for a tenement building with up to 20 units. Each additional residential unit during the same appointment costs €120 to €260.
When does the condition survey have to take place?
Before the first construction activity on the neighbouring plot, i.e. before demolition, excavation or piling. A report prepared after construction begins loses its most important advantage, because the initial condition is no longer undisputed.
Is a condition survey required by law?
There is no general obligation. However, it can be stipulated in the building permit procedure or in agreements with neighbours, and for the party carrying out the construction it is effectively indispensable, because otherwise unjustified claims cannot be refuted.
Who pays for the condition survey?
In practice usually the party carrying out the construction, because it protects them. If it is not offered, the neighbour can commission it themselves – in the event of damage, the costs form part of the claim, but they are not reimbursed automatically.
What is the difference from an expert opinion?
The condition survey records the condition; the expert opinion assesses the cause, responsibility and amount of the damage. We document; the assessment in a dispute is made by an expert witness or the court.
Is a private survey report valid in court?
It is submitted and used as a document. A court-appointed expert witness prepares their own expert opinion alongside it – and a complete private before report is usually the most important basis for that.
How long does the inspection take?
A flat 20 to 40 minutes, a detached house half a day, a tenement building with 14 to 20 units one to two days. The report follows three to seven days later.
What if the neighbour does not grant access?
Then documentation is carried out from outside, and the written request for an appointment, together with the refusal, is included in the report. Only the court can enforce access, in proceedings for the preservation of evidence.
Do all flats have to be recorded?
It makes sense, yes, because damage is later reported from inside the flats. If the scope is limited, then first the cellar, ground floor, top floor and the units on the property boundary.
What happens to the photos?
They are part of the report, numbered and allocated room by room. Each party receives its own section, the property manager the complete report.
How precisely are cracks measured?
With a crack gauge in tenths of a millimetre, plus length, course and position in the room. Without these figures, no change can be proven later.
What is a crack monitor?
Two marked plates over the crack on which movement is read in millimetres. Costs €45 to €90 each, installed; readings possible over months.
What are plaster tell-tales for?
A plaster bridge over the crack breaks as soon as anything moves. It costs €25 to €45 but only gives a yes-or-no answer, no measurements.
What is settlement monitoring?
Levelling using fixed levelling points on the building. What matters is not the subsidence as such, but the difference between the points, because that is what distorts the masonry.
How often is levelling carried out?
Zero measurement before construction begins, then after excavation, after the excavation support, after the shell construction and at the end. With conspicuous values at shorter intervals; a measurement round costs €280 to €550.
How much does vibration monitoring cost?
€350 to €750 per device per month; with recording and an alarm when limit values are exceeded, €450 to €900. Installation and evaluation come on top.
At what values does it become critical?
The decisive factor is the vibration velocity at the foundation, assessed according to ÖNORM S 9020 depending on the building class. Vibrations can be felt well below the values at which building elements are damaged.
Why do I feel vibrations even though the measurements show nothing?
People perceive oscillations very early, especially on timber joist ceilings. That is unpleasant, but not proof of structural damage – which is exactly why measurements are taken instead of arguments.
Which works are particularly critical?
Driving sheet piles, demolition with a hydraulic hammer, underpinning and excavation with groundwater lowering. With the latter, settlement monitoring is more important than vibration monitoring.
What about the shared party wall?
It is the most sensitive area when the neighbouring building is demolished and is documented on both sides, including junctions and metal flashings. After demolition it must also be protected against the weather.
Are existing cracks a problem for me?
Quite the opposite. Every documented existing crack is proof that it did not come from the construction site. A report that glosses over damage is of no use to anyone.
What should I do if a crack appears during construction?
Photograph and measure it immediately with the date, note what was being built that day, report it in writing to the party carrying out the construction and the site management, and schedule an interim survey.
When may I repair cracks?
Only once the movement has ended, otherwise the repair will crack open again. The exception is hazardous spots – these are made safe, but photographed and measured first.
How long should I keep the report?
Permanently, but at least as long as claims arising from the construction work are conceivable. Settlement sometimes only becomes apparent one to two years after completion.
Do you also carry out the follow-up survey?
Yes, with the same points and the same method, usually priced at 40 to 60% of the initial survey. Without a follow-up survey, the initial report has nothing to be compared with.
Do you also work for construction firms as a subcontractor?
Yes, with a uniform reporting standard across all properties in a project and, on request, naming the client to the neighbours.
Can you come at short notice?
For a single property, usually within a week. For buildings with several parties, scheduling needs lead time, so commission us four to six weeks before construction begins.
Do you also document the roof and the upper facade?
Yes, upper facade areas and roof surfaces with drone images if there is no scaffolding. For tall tenement buildings and inaccessible party walls, this is the only sensible way.
Do you also repair the damage afterwards?
Yes, that is our actual business: cracks, plaster, masonry, floors. We keep the condition survey itself separate from this – whoever documents should not depend on the result.
Do you also work outside Vienna?
In Klosterneuburg and the area surrounding Vienna, yes. Further afield, a travel surcharge is added, which is shown in the quotation.

Related services

◆ Partner company · Bling Premium Reinigung

Fine cleaning after the construction work?

Builders' and detailed cleaning after the work is finished is handled by our partner company Bling Bling Premium Reinigung. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: condition survey Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your condition survey in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.