Commercial premises refit in Vienna every week of building work is a week without revenue.

Commercial premises refit in Vienna: from the construction firm that does the work — not from a broker.

Commercial premises refit in Vienna: converting a commercial unit in Vienna costs €350 to €1,500 per square metre – from shops and offices to medical practices and restaurants. One contract, one construction schedule with an opening date, a fixed price under ÖNORM B 2110.

With commercial premises, the critical figure is not the price per square metre but the opening date. Rent is due from handover, while revenue only begins once you open. Every week in between costs you twice. And that date is rarely dictated by the building work itself, but by two other factors: official procedures if the use of the premises changes, and the delivery times for technical equipment. Clarify both first and plan the refit around them, and you will open on time. Start with the strip-out and apply for the permit on the side, and you may end up standing in a finished unit that is not allowed to open its doors.
✓ Construction schedule with opening date✓ Permits clarified in advance✓ Work outside business hours too✓ Regulated trades through partner firms✓ Fixed price under ÖNORM B 2110

What the refit costs – by type of use

Guide prices, net, per square metre of usable floor area, as of 2026, excluding fittings and equipment. Binding after a site visit.

UseTypical scopePrice netConstruction time
Shop, retailFloors, ceilings, lighting, changing rooms, painting350–700 €/m²3–6 weeks
OfficePartition walls, electrics and network, acoustics, kitchenette450–850 €/m²4–8 weeks
Medical surgery, practiceHygiene areas, plumbing, step-free access700–1.200 €/m²6–10 weeks
Café, restaurantKitchen, ventilation, grease separator, guest toilets900–1.500 €/m²8–14 weeks
Storage, workshopFloor, doors and gates, electrics, heating250–550 €/m²2–5 weeks
Commercial premises refit in Vienna: costs 2026 – net price overview
Commercial premises refit in Vienna: the prices from the table at a glance, as of 2026, net.

Why the range for restaurants is so much higher than for shops: a sales floor consists essentially of surfaces and lighting. A restaurant also contains a kitchen, ventilation, a grease separator, guest toilets and building services – components that can each cost as much as the entire fit-out of a shop of the same size. That is why the type of use is the single most important detail in any enquiry.

Unit prices

ItemUnitPrice netWhat is included
Removing the previous tenant's fixturesm²25–70 €Dismantling, disposal with documentation
Drywall partition with sound insulationm²65–120 €Stud wall, insulation, filling
Suspended acoustic ceilingm²65–140 €Substructure, panels, access hatches
Commercial floor coveringm²55–140 €Vinyl, tiles or rubber, with the right usage class
Repairing or levelling the screedm²25–60 €Substrate for the new covering
Electrics per workstationpc.450–950 €by a licensed electrical contractor
Sales floor lightingm²35–120 €Track system or recessed lights
Network and data cablingPoint120–320 €Cable, socket, test report
Step-free accesslump sum1.500–9.000 €Ramp, door width, doorbell as required
Accessible customer toiletpc.9.000–18.000 €to ÖNORM B 1600
Grease separator for restaurantspc.4.500–12.000 €Installation by licensed partner firms
Commercial kitchen ventilationlump sum12.000–45.000 €Design and installation by licensed partner firms
Shopfront and entrancelump sum4.000–25.000 €depending on protection zone and material
Replacing the shop windowpc.3.500–12.000 €Mind the structural engineering of the opening
Air conditioninglump sum6.000–28.000 €depending on floor area and outdoor unit
Worked example 1 · 85 m² ground-floor unit, formerly a mobile phone shop, converted into a medical surgery
Strip-out, disposal, planning for the change of use€6,800
Partition walls, ceilings, floors€28,400
Electrics, plumbing, hygiene areas€31,500
Step-free access, toilet, painting€18,600

Total around €85,300 net, roughly €1,000/m², in nine weeks. The permit for the change of use runs in parallel with the detailed design, so the construction period does not have to wait for it.

Worked example 2 · 64 m² café with a small kitchen, formerly an office
Strip-out, wall openings, disposal€9,200
Kitchen construction work, tiling, grease separator€26,500
Ventilation with exhaust ducting via the roof€31,000
Guest toilets, electrics, floor, surfaces€27,800

Total around €94,500 net, roughly €1,475/m², in twelve weeks. The largest item is not the kitchen but the ventilation – because the extract air has to be routed over the roof and agreed with the other residents and owners of the building.

If the existing floor is cracked or has subsided, it needs repairing before the fit-out: industrial floor repair.

Before the fit-out comes the removal of the previous tenant's fixtures: strip-out in Vienna.

Taking over premises full of old contents? We clear and dispose of everything beforehand: house and premises clearance in Vienna.

Permits: what really determines the schedule

Building work in commercial premises is usually measured in weeks, official procedures in months. That is why everything starts with an assessment: what is planned, does the use change, and which procedures does that trigger?

ProjectWhat usually needs to be clarifiedLead time
Renewing surfaces, replacing fittingsusually no procedure, check the leasenone
Partition walls without touching the structureusually unproblematic, observe fire safetylow
Changing the use, e.g. shop to restaurantclassification under building law and operating facility permit (Betriebsanlagengenehmigung)several weeks to months
Opening in a load-bearing wallstructural engineering and approvalWeeks
Shopfront, signage, awningtownscape, additionally reviewed in protection zonesWeeks
Routing extract air over the roofowners' consent, technical coordinationWeeks
Outdoor seating or pavement terrace (Schanigarten)separate procedure, depends on the seasonMonths
The operating facility permit is not a formality – it dictates how you build. It sets out ventilation, noise, escape routes, sanitary facilities and opening hours – precisely the points that have to be implemented in the construction. Build first and submit later, and you risk having to tear parts out again because the authority sees things differently. That is why we clarify the classification before the detailed design, together with the planner who prepares the submission. This creates costs early on, but they are a fraction of what removal and rebuilding would cost.

Restaurants: the points where it gets expensive

With restaurants, the difference from a shop lies not in the look but in the technology. Four issues determine costs and the schedule.

TopicWhy it is complexOrder of magnitude
Kitchen ventilationextract air must be removed, usually over the roof, with sound insulation and grease filtering12.000–45.000 €
Grease separatormandatory, takes up space, needs access for emptying4.500–12.000 €
Guest toiletsnumber and design depend on the number of guests, frequently step-free9.000–25.000 €
Kitchen floor build-upwaterproofing, fall towards the drain, slip-resistant covering120–260 €/m²

The most common planning mistake in this area concerns the extract air. It has to go somewhere, and in an old Viennese building that almost always means upwards through the house. This requires a shaft or a duct route, the consent of the condominium owners' association (WEG) and an installation that brings neither odours nor noise into the flats. This question should be settled before a lease is signed – because if no solution is possible, the premises are simply not suitable for a restaurant with a kitchen.

Medical surgeries and practices: hygiene determines the fit-out

For medical uses, it is not the design that determines the fit-out but the requirements for cleanability, separation and accessibility.

  • Surfaces. Floors and walls in treatment rooms with as few joints as possible and resistant to disinfectants – which rules out many standard coverings.
  • Hand-washing stations. Their number and location follow from the use, and each position needs a supply and a drain.
  • Separation of areas. Waiting area, treatment, staff and storage are functionally separated – which creates walls and therefore extra electrical and ventilation work.
  • Step-free access. Practically always relevant for medical surgeries, including the door, turning circles and the toilet.
  • Sound insulation. Conversations must not be intelligible in the waiting area – which calls for the right wall build-up and door quality, not just a door.
  • Technical rooms. X-ray, sterilisation or a laboratory have their own requirements for space, power and ventilation.

Because these points depend on one another, the sequence is decisive: first the room schedule, then the services, then the surfaces. Move the treatment rooms after tiling and you redo half the electrical installation.

Offices: acoustics is the underestimated factor

In office refits, the most common shortcoming is not the technology but the sound. Open-plan areas look good but are hard to work in when every phone call disturbs half the room.

MeasureEffectCosts
Suspended acoustic ceilingnoticeably reduces reverberation, the biggest single lever65–140 €/m²
Acoustic panels on wallstargeted against flutter echoes80–220 €/m²
Carpet instead of hard flooringreduces impact sound and reverberation45–110 €/m²
Floor-to-ceiling partitions instead of half-height onesreal separation rather than visual65–120 €/m²
Doors with sealsprevents speech carrying into the corridor€450–1,200/unit

A tip from practice: if you are planning meeting rooms, take their sound insulation more seriously than their size. A small, quiet room gets used every day; a large one with thin walls does not.

The lease: what needs to be settled before the refit

Many expensive surprises in a premises refit stem not from construction issues but from the contract. These points should be in writing before work begins:

PointWhy it mattersWhat to agree
Consent to the refitwithout it, any alteration is riskyname the scope specifically, not in general terms
Reinstatement obligation on moving outcan run to five figuresWaiver of reinstatement for defined fixtures
Compensation for investments (Investitionsablöse)who pays for the fixtures on moving outagreement on which items will be compensated
Shopfront and signageaffects the townscape and the building's residentsconsent in advance, including the design
Extract air and equipment on the roofconcerns common parts of the buildingobtain the owners' consent
Rent-free construction periodreduces the double burdenpoint for negotiation, customary for longer refits
Condition at handoverbasis for the later return of the premisesreport with photos, drawn up jointly

The sixth point in particular is often overlooked: a rent-free construction or fit-out phase is negotiable in commercial leases and, with a three-month refit, can amount to a considerable sum – often more than any saving on materials.

Refitting while trading continues

Sometimes the premises cannot close – for instance because the brand needs a presence or part of the range keeps selling. That is possible, but it changes both the process and the price.

MeasureEffect on the businessImpact on costs
Working in sectionspart of the floor area stays open+10 to 25%, more set-up time
Dust partitionsseparate the site from the sales floor€1,500–6,000 depending on length
Working in off-peak hoursno noise during opening hours+15 to 30% labour costs
Night workbusiness continues unchanged during the dayconsiderably more expensive, only worthwhile for short phases

The honest assessment: in most cases a short full closure is cheaper than a long refit while trading – both in terms of costs and of the impression on customers. A half-finished space behind a dust partition leaves a stronger impression on visitors than two weeks of closure with a notice announcing the reopening.

The process up to opening day

1 · Site visit and assessmentWhat is planned, does the use change, what does the lease say? This produces the list of procedures required.
2 · Design and submissionStructural engineering and submission through licensed partner firms, while equipment with long delivery times is ordered in parallel.
3 · Strip-out and disposalEverything that is not staying comes out – separated by material type, with documentation.
4 · Services firstElectrics, plumbing, ventilation, network. Everything that will later disappear into walls and ceilings.
5 · Fit-outWalls, ceilings, floors, surfaces – in that order, so that dust does not settle on finished work.
6 · Furnishing and finishing workFurniture, equipment, lighting, signage. Here your shopfitter and our team work in parallel.
7 · Acceptance and handoverAcceptance report under ÖNORM B 2110, test reports, instruction on the building services.

Between steps two and three lies the point that decides whether the opening date holds: equipment with delivery times of six to twelve weeks – kitchen equipment, ventilation, special lighting – must be ordered before the strip-out begins. Order it only once the walls are up, and you lose exactly those weeks at the end.

The most common mistakes in a premises refit

MistakeWhy it happensConsequence
Building before the permittime pressure, the opening date is already setremoval of work, delays, in the worst case no operating permit
Raising the extract-air question too lateregarded as a detailpremises unsuitable for a restaurant with a kitchen
Ordering equipment latebudget is only released after the refitfinished premises waiting for equipment
Reinstatement obligation not clarifiedthe lease is only skimmedfive-figure costs on moving out
Accessibility not planned forseen as optionalretrofitting while the business is running
Electrics planned before the furniture layoutfurnishing comes lastsockets in the wrong place, visible cables
No sound insulation between the premises and the flatsonly becomes an issue once there are complaintsconditions imposed, restricted opening hours
Construction schedule without a bufferoptimistic planningopening postponed, advertising wasted

The sixth point is the most annoying because it would be so easy to avoid: the furniture layout must come before the electrical design. Once you know where the till, shelving, display cabinets and workstations will stand, sockets and outlets can be placed correctly – and you avoid cable trunking that every customer can see.

What a commercial unit in an old Viennese building brings with it

Most commercial units in Vienna are on the ground floor of Gründerzeit buildings (built 1848–1918). This brings recurring issues that you should know about before signing a lease.

FeatureWhat it meansConsequence for the refit
Vaulted ceilingscarry loads through compression, the thrust goes into the wallsno wall removed without structural engineering, suspensions only at suitable points
Damp masonry at the base of the wallsno horizontal damp-proof course presentdry out before building wall linings, otherwise mould behind the cladding
High roomsthree to four metres, a fine sense of spacehigher heating load, a suspended ceiling is often worthwhile
Low electrical supply capacityexisting supply designed for residential usecheck the connected load before planning a kitchen or air conditioning
No grease separator, no ventilation shaftintended for retail, not for restaurantsplan a retrofit or adapt the use
Shop window in a load-bearing walllintel above the openingchanges only with a structural assessment
Flats abovenoise and odours have a direct impactplan sound insulation and extract air from the outset

The fourth row is where restaurant projects most often fail after the lease has already been signed: the available connected load is not enough for a professional kitchen, and increasing it is either expensive or impossible in that building. This check costs next to nothing in advance and decides whether the project is feasible at all.

Cost drivers and potential savings

TopicWhat drives costsWhere you can save
Floor planevery new wall brings electrics, ventilation and surfacesuse the existing layout, keep open areas open
Building servicesventilation and drainage are the most expensive itemschoose premises that are already technically prepared
Surfacesspecial formats, special colours, sample areasstandard formats with good design instead of custom-made products
Lightingspecial luminaires with long delivery timestrack system, expandable later
Time pressurenight and weekend worka realistic date with a buffer instead of surcharges
Variationschanges after the installations have startedfix the furniture and use plan before construction starts

The biggest single lever is in the last row. A change to the floor plan decided before construction starts costs planning time. The same change after the services have been laid costs removal, reinstallation and time – in practice five to ten times as much.

Handover and operation

The end result is not just finished premises but building services that someone has to operate. What we hand over:

  • Acceptance report under ÖNORM B 2110 with snagging list and deadlines.
  • Test reports for each trade – electrics, plumbing, ventilation, each from the specialist firm that carried out the work.
  • Photo documentation of concealed work, especially cable and pipe routes. This saves searching and opening up whenever changes are made later.
  • Instruction on ventilation, heating, air conditioning and lighting control.
  • Maintenance notes with intervals, particularly for the grease separator and ventilation filters – both are essential to operations, not optional.

The second-to-last point is the one that saves the most trouble in everyday use: if you know where the cables run, you can later drill into the wall for a shelf without hitting one.

Which uses we refit premises for

The requirements differ more than they appear to from the outside. This overview shows what matters for each use – and where projects typically get held up.

UseDecisive requirementTypical bottleneck
Retailpresentation, lighting, customer flowlighting and shopfront, both with delivery times
Restaurants and cateringkitchen, ventilation, plumbing, operating facility permitextract-air route and connected load
Office and agencyacoustics, network, meeting roomssound insulation between the rooms
Medical surgery, therapyhygiene, separation, accessibilityroom schedule and plumbing lines
Hairdresser, beauty salon, studiowater connections, ventilation, lightingnumber and position of the connections
Gym and studioimpact sound, ventilation, sanitary facilities with showerssound insulation towards the flat above
Storage, workshopfloor, doors and gates, powerfloor load capacity and vehicle access

One pattern runs through every row: the bottleneck is almost never the visible floor area but something technical that can be clarified in advance. That is why every enquiry with us starts with two questions – which use, and what already exists on site – rather than with the price per square metre.

How to make two quotes comparable

For premises refits, quotes differ more than in any other area because the scope of work is rarely defined. These seven points make a comparison possible:

  • The type of use and room schedule must be stated in the quote – otherwise two contractors are pricing two different projects.
  • Strip-out and disposal as a separate item, stating what will be disposed of.
  • Building services itemised separately: electrics, plumbing, ventilation, air conditioning – each with the firm carrying out the work.
  • Contingency items for everything that depends on findings on site, with unit prices.
  • A construction schedule with phases and named dependencies on permits and deliveries.
  • Interfaces with the shopfitter clearly described: who supplies, who installs, who connects.
  • ÖNORM B 2110 as the contractual basis, with acceptance, retentions and rules for variations.

If one of these points is missing, the quote is not cheaper – it is incomplete. The difference turns up later, usually in the week before the planned opening, when it is at its most expensive.

Schedule: a realistic example

Using the example of a 64 m² café, from the first viewing to opening day. The construction period is the shortest phase.

WeekWhat happensWho
1Viewing, feasibility: extract air, connected load, plumbingus together with you
2Room schedule, quote, decisionus
3–4Design, submission, owners' consent for the extract airplanner, property management
3Ordering kitchen equipment and ventilation (delivery time 6–10 weeks)you together with us
5–6Strip-out, disposal, wall openingsus
7–9Electrics, plumbing, ventilation ducts, screed laid to fallsus with partner firms
10–12Tiling, drywall, surfaces, guest toiletsus
13Kitchen appliances, installing ventilation, commissioningpartner firm, supplier
14Furnishing, finishing work, cleaning, acceptancejointly
15Official inspections, staff training, openingyou

Two things stand out in this plan. First: the actual construction period is eight to nine weeks, while the whole lead time is fifteen. Second: the equipment is ordered in week three, not week ten – otherwise finished premises sit waiting for their ventilation. Anyone naming an opening date should therefore calculate backwards rather than hope forwards.

What to check when taking over existing premises

If you are taking over premises with fittings, a sober inspection pays off before the transfer fee (Ablöse) is negotiated.

CheckpointWhyEffort
Age and condition of the ventilationthe largest single item for restaurantsvisual inspection, maintenance records
Electrical inspection reportsafety and sufficient capacity250–550 €
Grease separatorfunctioning and records of emptyingcheck the documents
Kitchen floor build-upWaterproofing and falls in place?visual inspection, open up if in doubt
Existing permitsdo not automatically remain validinspection of the files at the authority
Condition of the sanitary facilitiesnumber and design according to the number of guestsvisual inspection

The fifth point is the one most often overlooked: an existing operating facility permit is tied to the business and to the approved scope. Anyone who changes or extends the use will usually need a new or amended procedure – even if the same thing was done there for years. We obtain this information before the design stage, so that the transfer fee is not paid for a permit that no longer applies in that form.

Accessibility in commercial premises

For businesses with customer traffic, step-free access is required depending on the use and the scope of the refit – and regardless of that it makes economic sense, because it makes the premises accessible to a share of customers in the first place.

ObstacleSolutionCosts
One or two steps at the entrancefixed ramp or level adjustment1.500–9.000 €
Several stepsramp with landing, platform lift or side access9.000–35.000 €
Entrance door too narrowreplace the door leaf, widen the opening1.800–6.500 €
Heavy doorautomatic door operator3.500–9.000 €
No accessible toiletinstallation to ÖNORM B 16009.000–18.000 €
Narrow aisles on the sales flooradapt the furniture layoutlow, often just planning

If a structural solution is ruled out by heritage protection or lack of space, there is almost always an organisational one: a mobile ramp, a doorbell with a sign, an ordering service. That is not equivalent, but it is better than nothing – and it shows that you take the issue seriously.

Protection zones and townscape

In Vienna's protection zones (Schutzzonen), the authorities examine how the premises present themselves to the street. This affects more elements than most people expect.

ElementWhat is examinedPractical consequence
Shopfrontmaterial, division, colourstandard profiles often not permitted, joinery solution needed
Letteringsize, typeface, illuminationlight boxes often excluded, individual letters possible
Awningshape, colour, projectiondome awnings often not allowed, straight shapes more likely
Shop windowdivision, frame thicknesscontinuous panes sometimes not permitted
Outdoor air-conditioning unitsvisibility from the streetinstallation in the courtyard or concealed

That sounds like a restriction and is often an advantage in practice: a shopfront that suits the façade looks more upmarket than a standard system – and stays current for longer. The only important thing is to know the requirements before placing the order, because a shopfront that has not been approved must be replaced at your own expense.

When you do not need us

If the job is only repainting and swapping the fittings, a painting firm working with your shopfitter will do. We become worthwhile as soon as walls, floors, electrics and plumbing come together, when an opening date has to be met, or when a procedure is under way that needs to be coordinated with the construction work.

Advertising, visibility and street presence

The refit does not end at the front door. How premises look from the outside decides how many people come in at all – and this part has its own rules and its own delivery times.

ElementEffectCostsWhat to look out for
Shopfront designshapes the first impression more than any advertisement4.000–25.000 €coordinated design in protection zones, allow for lead time
Letteringfindability, recognition800–6.000 €individual letters usually more readily permitted than light boxes
Shop window lightingworks above all outside opening hours1.200–6.000 €include a power outlet in the design
Awning or sun protectioncomfort and visibility2.500–9.000 €shape and colour reviewed against the townscape
Entrance area and floor coveringsignals quality before anyone steps inside1.500–8.000 €slip-resistant, flush with the pavement

One detail with a surprisingly large effect is the transition from the pavement into the premises. A clean, threshold-free entrance area with a matching covering is inviting and at the same time solves part of the accessibility issue. It costs relatively little, yet it is almost always considered only at the very end – when the interior flooring has already been chosen and no longer matches.

After the opening: what experience shows will follow

No premises are finished on opening day. These points typically come up in the first few months and can be prepared for rather than improvised:

  • Additional sockets. Once the business is running, it becomes clear where equipment actually stands. Empty conduits at critical points save on cable trunking later.
  • Readjusting the lighting. A track system can be extended and rearranged; fixed recessed lights cannot.
  • Acoustics. Only with guests does it become clear whether the room is too loud. Acoustic elements that can be retrofitted are cheaper than a second refit.
  • Storage and back-of-house space. Almost every business needs more storage than planned – a reserve in the floor plan pays off.
  • Maintenance. Ventilation filters, grease separators and air-conditioning units have service intervals. Planning for them avoids breakdowns while the business is running.

We record these points in the handover meeting, so it is clear which preparations were already made during construction and where something can still be retrofitted without opening walls.

Why a single point of contact saves the opening date

A premises refit typically involves six to ten parties: the construction firm, electricians, plumbers, ventilation specialists, the shopfitter, the kitchen supplier, the planner, the authority, the landlord and the property management. Every interface between two of them is a potential day of waiting – and waiting days add up at the end of the construction period, precisely when the opening has already been advertised.

That is why our model focuses on coordination rather than the individual price: one contract, one construction schedule, one party responsible for the sequence. You keep the decisions on design, fittings and equipment; we make sure the trades work in the right order and that the dependencies on permits and deliveries are visible in the schedule.

If something starts to go wrong, you hear about it as soon as it becomes foreseeable, not in the week before the opening. That is the difference that ultimately shows not on the invoice but in the date.

The cellar beneath the shop: storage, staff room or dining area?

Many ground-floor commercial units in Vienna's period buildings come with a cellar room, often a vault with brick arches. It looks like free extra space, but it can only be used as far as its moisture levels, height and access allow. As storage for packaging, drinks or seasonal stock, a dry floor, proper lighting and ventilation that prevents condensation in summer are usually enough. Anyone planning to store paper or textiles down there should first have the moisture content of the walls measured.

It becomes more demanding when people are to work in the cellar or guests are to be seated there. Then it is a question of escape routes, a second staircase or an emergency exit, sufficient ceiling height, fresh air and usually a change of use that has to be submitted to the authorities. Vaults are both a beauty and a constraint: services cannot simply be chased into the masonry wherever you like, and a suspended ceiling would destroy the feel of the room. Before a lease plans the cellar as guest space, we therefore clarify whether this is possible at all, structurally and legally. If the masonry is saturated with damp, the work begins with basement renovation.

When staff work on the premises: requirements for the workplace

Under employment law, a commercial unit becomes a workplace as soon as staff are employed there. The Austrian Workplace Ordinance (Arbeitsstättenverordnung) then sets its own requirements, which go beyond the building regulations and are enforced by the Labour Inspectorate (Arbeitsinspektorat). These include daylight, or at least a view to the outside, at permanent workstations, sufficient ceiling height, toilets for employees and, depending on the number of people, changing and break areas as well as washing facilities. In a small shop with two employees this is usually covered by one WC and a partitioned area for coats and breaks. For a restaurant kitchen or a medical practice with several employees, the space required is greater than many people allow for in their first floor plan. Anyone who forgets these rooms will later lose sales floor, because they have to be partitioned off retrospectively. We therefore build the staff areas into the floor plan from the outset, in consultation with the operator.

Power, heating, hot water: the building services of the unit

There is more building services engineering behind a new shop floor than meets the eye. Many units in older buildings depend on the previous tenant's ageing gas-fired flat heating or on night storage heaters that nobody wants to run any more. On the ground floor there are usually three options for heating: connection to an existing central plant in the building or to district heating, a heat pump with an outdoor unit in the courtyard, provided the owners agree, or an electric infrared solution for very small areas. Hot water is often produced locally with an instantaneous water heater, which in turn requires connected load. If the unit and the flats are served by the same system, the unit should be given its own meter so that consumption and costs are billed cleanly and separately. These questions have a direct bearing on how high the unit's running costs will be over the coming years. The electrical side is handled by a licensed partner firm; details under electrical work.

Frequently asked questions about refitting commercial premises in Vienna

How long does it take from the viewing to the opening?
For a 64 m² café, about fifteen weeks, of which eight to nine weeks are construction. The rest is design, submission, consents and delivery times. Anyone naming an opening date should calculate backwards.
What should be checked when taking over existing premises?
The condition of the ventilation, electrics, grease separator and kitchen floor – and above all the existing permits. They do not automatically remain valid if the business or its scope changes. We obtain this information before the design stage.
Is the electrical supply capacity sufficient for a commercial kitchen?
In old Viennese buildings often not, because the existing supply was designed for residential use. Checking this costs next to nothing in advance and decides feasibility – it belongs before you sign the lease.
What does it cost if I change the floor plan in the middle of the refit?
Many times the cost of the same change before construction begins. Once the services are laid, it means removal, reinstallation and lost time – in practice five to ten times the cost of the planning change alone.
What about vaulted ceilings on the ground floor?
They carry loads through compression, and their thrust goes into the walls. Removing walls or suspending loads is only possible after a structural assessment. In return, they are often visually the strongest feature of the premises – preserving them is worthwhile.
Can I have the premises checked for feasibility in advance?
Yes, and we recommend it before any contract is signed: extract-air route, connected load, plumbing lines, structural engineering of the openings, condition of the floor. This site visit is free of charge and prevents the most expensive surprises.
What does refitting commercial premises cost?
Shop €350 to €700/m², office €450 to €850/m², medical surgery €700 to €1,200/m², restaurant €900 to €1,500/m², each excluding fittings and equipment. An 85 m² medical surgery comes to around €85,300 net in our example.
Why is a restaurant so much more expensive than a shop?
Because of the technology. The kitchen, ventilation, grease separator and guest toilets each often cost as much as the entire fit-out of a shop of the same size. The look takes comparable effort in both cases; the building services do not.
How long does the refit take?
Shop three to six weeks, office four to eight, medical surgery six to ten, restaurant eight to fourteen weeks. Permits and delivery times for equipment run in parallel and are often longer than the construction period itself.
Do I need an operating facility permit?
For restaurants and many other businesses, yes. Among other things, it sets out ventilation, noise, escape routes and sanitary facilities – exactly what is implemented in the construction. That is why we clarify the classification before the detailed design.
What happens if I build before the permit is granted?
In the best case nothing; in the worst case work has to be removed because the authority takes a different view. That costs time and money and puts the opening date at risk – whereas the lead time for the submission can be planned.
What needs to be considered with a change of use?
If a shop becomes a medical surgery or a restaurant, procedures under building law and trade law may be necessary. The submission is handled by licensed partner firms, which we coordinate and which are named in the quote.
Where does the extract air from a commercial kitchen go?
As a rule over the roof, with grease filtering and sound insulation. This requires a duct route through the building and the owners' consent. This question should be settled before the lease is signed.
Can you work outside business hours?
Yes – by arrangement, we schedule noisy work for off-peak hours if neighbouring businesses or flats in the building are affected. This raises labour costs by around 15 to 30 per cent, but keeps operations free from disruption.
Can the premises stay open during the refit?
In sections, yes, with dust partitions. This makes the refit 10 to 25 per cent more expensive. In many cases a short full closure is cheaper and makes a better impression on customers than a half-finished space.
What do I need to check in the lease?
Consent to the refit, the reinstatement obligation on moving out, compensation for investments, and arrangements for the shopfront, signage and roof-mounted equipment. A rent-free construction period is also negotiable – with a three-month refit, a considerable sum.
Do you also handle the reinstatement when moving out?
Yes, with proof of disposal and a broom-clean handover to the landlord, and on request with final cleaning by our partner company. It makes sense to agree the scope with the landlord in writing beforehand.
Do you also build commercial kitchens?
We take on the construction part – floors with falls and waterproofing, walls, tiling, wall openings. Ventilation, grease separators and gas installations are handled by licensed partner firms, which are named in the quote.
Do the premises have to be accessible?
That depends on the use and the scope of the refit. For businesses with customer traffic, step-free access is often required and always makes economic sense, because it widens the customer base you can reach.
What does a ramp at the entrance cost?
For one or two steps €1,500 to €9,000; for several steps with a landing or a platform lift €9,000 to €35,000. Where nothing can be done structurally, an organisational solution such as a mobile ramp and a doorbell helps.
What needs to be considered in a protection zone?
The shopfront, lettering, awning, shop-window division and visible air-conditioning units are reviewed for their impact on the townscape. Standard systems are often not permitted, but a tailored solution looks more upmarket and stays current for longer.
When does equipment need to be ordered?
Before the strip-out. Kitchen equipment, ventilation and special lighting have delivery times of six to twelve weeks. Order them only once the walls are up, and you lose those weeks at the end of the construction period.
How is the opening date safeguarded?
Through a construction schedule with phases, buffer times and named dependencies – permits, deliveries, furnishing. If something is delayed, we tell you as soon as it becomes foreseeable, not on the day itself.
Who designs the electrics?
Licensed electricians, based on your furniture and use plan. That is why we need this plan early: where the till, shelving and workstations stand determines every socket.
What needs to be considered regarding sound insulation towards the residential building?
Music, ventilation and operations must not disturb the flats. In construction terms, it comes down to the ceiling and wall build-up, the placement of equipment and decoupled fixings. This belongs in the design, not on the snagging list.
Do I get a fixed price?
Yes, after the site visit, as a bill of quantities under ÖNORM B 2110 with a construction schedule and opening date. Anything that depends on findings on site is included as a priced contingency item. Variations only with written approval.
What is not included in the price?
Fittings, equipment, till systems and stock management. We build the shell, the services and the connections – the furnishings come from your shopfitter, with whom we coordinate the interfaces.
Do you work with my shopfitter?
Yes, that is the normal case. The only important thing is that the interfaces are fixed early: who supplies the back panels, who the lighting, who the connections. Wherever that remains open, waiting days arise.
How do you deal with unexpected findings in the existing building?
We stop, document with photos and submit a variation. Typical findings are damp walls behind cladding, old cables and pipes without plans, and floor build-ups that turn out to be unsuitable.
Can you also take on individual trades only?
Yes, for example just drywall or just floors. Coordination then stays with you. From three trades upwards, awarding the work to a single point of contact is usually cheaper, because the waiting days disappear.
How quickly is the construction schedule for the opening ready?
Site visit within five working days, quote with construction schedule two working days later. It sets out the dependencies on permits and delivery times, so that the opening date is reliable.
May I use the cellar beneath my commercial unit as a dining area?
Only if escape routes, ventilation, ceiling height and fire protection are adequate, and usually only after an approved change of use. A cellar room that has so far been used for storage is not, in legal terms, a habitable room. A second exit and mechanical ventilation are often needed. Check this before signing the lease; otherwise you will be paying for space that may only be used for storage.
Do my employees need their own break room on the premises?
That depends on the number of employees and the type of work. The Workplace Ordinance requires toilets for staff and, depending on size, changing and break facilities as well. In small shops a partitioned area with a cloakroom is often sufficient. For catering businesses with several employees you will usually need separate rooms. We plan this in before the conversion instead of carving out space later.
Can a commercial unit in an older building be heated with a heat pump?
Often yes, if a place can be found for the outdoor unit in the courtyard or on the roof and the owners' association agrees. Important points are sound insulation towards the flats above and the routing of pipes to the unit. In protected zones (Schutzzonen), a visible unit on the street side is usually not possible. For very high, poorly insulated rooms, a heat load calculation is worthwhile beforehand.

Related services

◆ Partner company · Bling Premium Reinigung

Opening day coming up? The post-construction clean fits into the schedule.

Before the opening, our partner company Bling Premium Reinigung takes care of the post-construction clean of your premises – floors, glass, surfaces, ready for trading. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Commercial premises refit Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your refit in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.