Call nowWhatsAppEmail

Building drying Vienna measure first, then dry.

Building drying in Vienna: from the construction company that does the work — not from an agent.

Building drying in Vienna: drying out a building in Vienna costs €18 to €45 per unit per day, and an average water damage case €1,200 to €4,500. Measurement, drying plan, setting up the equipment, documenting progress, final clearance measurement – with paperwork that the insurer accepts.

Drying does not mean setting up machines and waiting. It means first measuring where the moisture sits and how deep it goes, deriving a method from that and documenting progress until the substrate is demonstrably dry. Anyone who sets up dryers without measuring dries the room air rather than the screed – and then builds on a wet base. The consequence shows up six to twelve months later as mould under the new floor covering, and by then nobody pays any more, because the cause can no longer be proven. If the cause lies in a pipe, it must be repaired before drying begins – see pipeline construction. After a fire, soot contamination comes on top of the drying – for that, see fire damage restoration.
✓ Moisture measurement before drying starts✓ Documentation for the insurer✓ Equipment from our own stock✓ Clearance measurement before reinstatement✓ Restoration from a single source

What happens when water gets into the floor build-up

A floor consists of several layers. Water does not spread evenly; it takes the path of least resistance – and stays wherever it cannot evaporate.

LayerWhat happens to the waterDries out by itself?
Floor coveringSurface dries quicklyyes, but it hides what is going on underneath
Screedabsorbs water, releases it only slowlyonly very slowly
Impact sound and thermal insulationWater collects in the cavitypractically not at all
Perimeter joints and skirting areaWater migrates sideways into the wallsno
Structural slabcritical with timber joist ceilingsno, risk of rot
Wall plasterrises by capillary action, often 30–80 cm highslowly, with salt efflorescence
The critical layer is almost always the insulation beneath the screed. There the water stands in a closed cavity, has no contact with the air and does not dry out for years. That is exactly why it is not enough to put dehumidifiers in the room – they dry the air and the top of the screed. The water underneath can only be reached with negative-pressure or positive-pressure methods, in other words by deliberately drawing air through the cavity in the insulation layer.

Building drying in Vienna: costs 2026

ItemUnitPrice netNote
Moisture measurement and assessmentlump sum280–650 €Measurement report, proposed method
Dehumidifiers, condensation dryersunit per day18–32 €Room drying
Desiccant (adsorption) dryersunit per day28–45 €at low temperatures, basements
Side-channel blowers for insulation layer dryingunit per day26–42 €Negative-pressure or positive-pressure method
Water separators, filtersunit per day12–22 €required for the negative-pressure method
Core drilling for drying openingspc.45–90 €grid according to area, sealed afterwards
Set-up, instruction, dismantlinglump sum280–550 €Delivery and collection of the equipment
Check measurement during dryingvisit90–180 €usually every 3–7 days
Clearance measurement with reportlump sum180–380 €Proof of dryness
Electricity costsper unit per day3–9 €usually borne by the occupant, a sub-meter is recommended
Building drying in Vienna: costs 2026 – price overview, net
Building drying in Vienna: the prices from the table at a glance, as of 2026, net.

Typical total costs

Damage scenarioDurationCost net
Minor damage, one room, room drying only7–14 days600–1.400 €
Average water damage with insulation layer drying14–25 days1.200–4.500 €
Several rooms, two storeys affected21–35 days3.500–9.000 €
Basement after flooding21–40 days2.500–8.000 €
Drying with removal of screed and insulationdepending on build-upan additional €80–180/m²

The last line is the decision at the heart of every larger damage case: technical drying or removal. Both are right, but in different cases – and the difference amounts to several thousand euros.

Dry it or open it up: the decisive trade-off

CriterionTechnical dryingRemoval of screed and insulation
Duration2 to 5 weeks with equipment runninga few days of removal, then rebuilding
Costs1.200–4.500 €€80–180/m² plus rebuilding
Noise and disruptionEquipment runs day and nightshort, but loud and dusty
Habitabilityrestricted, but possibleroom cannot be used
Where mould has formedoften not sufficientnecessary
With contaminated waternot sufficientnecessary
With timber joist ceilingsonly with close monitoringoften the safe option
Insuranceusually coveredusually covered if justified

The rule of thumb from practice: clean mains water that has not been standing for long can usually be dried technically. Waste water, flood water, a long standing time or mould that is already visible all point towards removal, because germs and spores in the insulation cannot simply be dried away. This decision should follow from the measurement report and an assessment, not from the question of what happens to be quicker.

The methods

ProcedureHow it worksWhat forSpecial feature
Room drying with a condensation dryercools the air, water condenses, the air is returned to the roomSurfaces, plaster, top of the screedneeds temperatures above roughly 15 degrees
Desiccant (adsorption) dryinga drying agent extracts moisture from the airBasements, cold rooms, winteralso works at low temperatures
Insulation layer drying under negative pressureair is sucked out of the cavity and discharged through filterswet insulation beneath the screedpreferred where germs are suspected, as the air is extracted
Insulation layer drying under positive pressuredry air is forced into the cavitywet insulation, clean conditionsfaster, but spreads particles into the room
Wall drying via drill holesair is fed into cavities within the wallcavity walls, wall liningsdrilling grid depending on build-up
Infrared and heating panelsheat the building element in a targeted waylimited areas, edge zonesas a supplement, not as the sole method

Which method is right depends on the floor build-up – and that is precisely why every measurement must include an opening or drill hole showing whether there is a continuous insulation layer at all. In old Viennese apartments with timber joist ceilings there often is none; there the water sits in the fill, and that is a different case with a considerably higher risk to the structure.

Water damage above a timber joist ceiling

In Vienna's period buildings (Altbau), water damage is not just a moisture problem but a risk to the load-bearing structure. Beneath the screed there is no insulation board but a fill of sand or slag, with timber joists below. Water stays in the fill, and damp timber at room temperature is the ideal breeding ground for wood-destroying fungi. That is why we do not only measure the moisture here, but also open up and assess the timber – at the very least at the joist ends on the external wall, where damage occurs first.
StepWhy
Opening at the lowest pointshows whether the fill is wet and how deep
Measuring timber moistureabove roughly 20 per cent, fungal growth begins
Remove the fill if it is saturatedit will not dry out inside the structure
Ventilate and inspect the joistsdrying over weeks, with measurements
Only then a new build-upbonded fill, insulation, dry screed

This takes more effort than setting up equipment, and in this type of construction it is the only approach that lasts. What the new ceiling build-up looks like is explained on the page timber joist ceiling renovation.

The process

1 · Immediate measuresShut off the water, take up standing water, check the electricity in the affected area, move soaked furniture out of the way. Take photos before anything is changed.
2 · Measurement and assessmentMoisture in the screed, plaster, insulation and, where applicable, timber. Determine the floor build-up, mark out the affected area, measurement report.
3 · Drying planMethod, number of units, expected duration, power consumption. Decision between drying and removal, with written reasons.
4 · Setting up the equipmentDrill the holes, lay the hoses, put the units into operation, explain how to use them. Sub-meter for the electricity.
5 · Check measurementsEvery three to seven days. Progress documented, equipment adjusted, results visible.
6 · Clearance measurementOnly once the readings stay within the target range. The report is the precondition for reinstatement.
7 · ReinstatementClose the drill holes, build-up, floor covering, painting – by us if you wish, without a second firm.

Step six is the one most often skipped. Without a clearance measurement nobody knows whether the substrate is dry – and anyone who glues a floor covering onto it seals the residual moisture under an impermeable layer.

What the insurer needs

For damage caused by escaping mains water, an insurer usually pays – the household contents insurance of the person affected, the homeowner's or buildings insurance, or, for damage coming from the neighbouring flat, the neighbour's liability insurance. For this to go smoothly, documents count for more than arguments.

DocumentWhy it matters
Photos from the day of the damagecondition before any changes, extent recognisable
Claim notification with date and causedeadline and assignment to the insured event
Measurement report before drying startsproves the extent of the saturation
Drying planjustifies the number of units and the duration
Progress documentationshows that drying did not run longer than necessary
Electricity meter readingbasis for reimbursement of the electricity costs
Clearance measurement reportend of drying, start of reinstatement
Itemised invoiceunit-days, measurements and ancillary services shown separately
The most common cut made by insurers does not concern the drying itself, but its duration. If it is not documented how damp things were at the start and how the readings fell, there is no way to justify why the equipment ran for four weeks. That is why we measure before starting, document every check visit and finish with a clearance measurement. These documents are the difference between an invoice that is reimbursed in full and an argument.

On the question of electricity: drying equipment runs around the clock and uses roughly €3 to €9 worth of electricity per unit per day. With six units over three weeks, that comes to several hundred euros running through the occupant's meter. Insurers usually reimburse this, but they need the sub-meter reading. We therefore fit a meter and record the opening and closing readings in the report.

How long it takes

Build-upProcedureTypical duration
Tiles on screed, wet on the surfaceRoom drying5–10 days
Screed on insulation, cavity wetInsulation layer drying14–25 days
Two storeys, larger areacombined21–35 days
Basement after flooding, thick building elementsAdsorption21–40 days
Fill above a timber joist ceilingusually removal instead of dryingdepending on build-up
Walls after capillary riseWall drying3–8 weeks

These times are based on experience, not promises. How quickly a building element dries depends on temperature, air exchange, the thickness of the element and on how long the water had been standing before drying began. That is exactly why the most important factor is when you start: every day the water stays in the build-up prolongs the drying disproportionately and increases the risk of mould.

Mould: when it becomes a different matter

Mould needs moisture, warmth and a nutrient base. In a heated flat, two of these are always present, so it is the moisture that decides – and time.

Time since the damageWhat to expectConsequence
0–24 hourswater spreads, no growth yetbest starting position, measure immediately
2–4 daysfirst germination possiblestart drying now
5–10 daysvisible growth on surfaces possibledrying plus treatment
more than 2 weeksgrowth in cavities likelyconsider removal rather than drying alone
MonthsInfestation within the structureremediation, see mould remediation

The practical conclusion: with water damage, speed is the most effective and the cheapest measure. Starting two days earlier regularly saves a week of drying time – and sometimes the entire removal.

Building drying in new construction

Not every drying job follows damage. In new buildings and after major alterations, too, there is moisture in the building – from concrete, screed, plaster and mortar. A freshly laid cement screed contains water that has to be released before a floor covering may be laid.

SituationWhy drying is neededTypical duration
Cement screed before laying the floor coveringresidual moisture must fall below the limit valueweeks depending on thickness, shorter with drying
New build in winterconstruction moisture cannot escape2–6 weeks alongside the works
After internal plasteringlarge quantities of water in the walls1–3 weeks
Before paintingthe substrate must be dryfor a few days
Before installing parquettimber is sensitive to residual moistureuntil the clearance measurement

The difference from drying after damage: here the moisture is evenly distributed and known; the aim is to speed things up, not to limit damage. Measuring before the floor covering is laid remains essential – for screed with the CM (calcium carbide) device, because electrical measurements only provide approximate values. Anyone who lays parquet on screed that is too damp will get cupping and gaps, and the floor layer is rightly not liable for it.

The most common mistakes

MistakeWhy it happensConsequence
Setting up equipment without measuringit needs to be quickroom air dry, build-up still wet
Room drying only, with wet insulationthe floor feels drywater stays in the cavity, mould follows
Ending drying too earlythe equipment is a nuisance, costs keep runningresidual moisture trapped under the new floor covering
No clearance measurementregarded as a formalityno proof, disputes over consequential damage
Windows permanently open while the equipment runswell meantthe condensation dryer works against the outside air, using electricity to no effect
Heating turned offto save energydrying slows down considerably
Timber joist ceiling treated like a concrete slabbuild-up not checkedrot in the structure, the most expensive consequence of all
No electricity meter fittedit gets forgottenthe insurer does not reimburse the electricity costs
Floor covering laid before the clearance measurementTime pressurethe damage recurs, this time without cover

The fifth point surprises many people: a condensation dryer works best in a closed room. Anyone who airs the room constantly keeps drawing in damp outside air, which the unit then has to dehumidify as well – that costs electricity and achieves little. With desiccant dryers, on the other hand, controlled exhaust air can be part of the plan. We explain what applies when we instruct you on site.

What makes drying take longer – and what shortens it

In practice, two flats with the same pattern of damage often differ by ten days. That is rarely down to the equipment and almost always down to the surrounding conditions.

FactorEffect on durationWhat can be influenced
Time between the damage and the startthe strongest single factorreport it immediately, have it measured immediately
Room temperaturecool rooms dry considerably more slowlykeep the heating on, even with the equipment running
Thickness of the screedthick build-ups take longercannot be influenced, but can be planned for
Type of insulationclosed-cell insulation lets hardly any air throughadapt the method, remove if necessary
Tightness of the perimeter jointsleaky edges reduce the air throughputtape them off, seal the edge zones
Number of drill holestoo few noticeably prolong dryinggrid based on area, not on convenience
Ventilation habitsairing the wrong way reduces effectivenessfollow the instructions given
Switching off the equipmentevery interruption sets the process backleave it running
The most expensive mistake is waiting. Anyone who first asks the insurer whether drying is covered and lets a week go by as a result ends up paying more – because the drying takes longer and because after seven days mould growth in cavities becomes likely, which then makes removal necessary. Insurers expressly expect loss mitigation measures to be taken immediately. Report it, have it measured, start straight away – the question of cover can be clarified in parallel; the water in the build-up will not wait.

Conversely: once the first readings are available and the equipment is correctly placed, the rest is routine. The flat usually remains habitable, progress is documented, and after the clearance measurement it is clear what has to be reinstated. The largest share of the costs is the unit-days – and that is precisely the share an early start reduces.

Burst pipes in a Viennese tenement building (Zinshaus): why several flats are affected

In a Viennese tenement building, water damage rarely stays within one flat. If a pipe bursts in the riser or at a branch, the water spreads through service shafts, ceiling penetrations and the fill – and often reappears two storeys lower, without the flat in between looking wet.

LocationTypical pattern of damageWhat needs to be checked
Flat where the damage occurredwet floor, damp base of wallsopen up the build-up, measure the extent
Flat belowstains on the ceiling, peeling paintceiling plaster, fill, joist ends
Service shaftwater runs down vertically, invisible from outsideopen the shaft, measure moisture across all storeys
Staircase, basementwater collects at the lowest pointcheck the basement ceiling and the foot of the walls
Neighbouring flat on the same floorskirting board damp, parquet liftingmeasure edge zones and the screed joint
The mistake that costs the most money in tenement buildings is measuring too small an area. Measurements are taken only where it is visibly wet, and drying is done there too – and six months later the damage shows up in the neighbouring flat, where the cause can no longer be pinned down. That is why, for damage in multi-occupancy buildings, we always also measure the adjoining rooms and the storey below, and we record the dry readings as well. These baseline measurements cost little and later provide the evidence of what belongs to the damage and what does not.

For the property management, responsibility must also be clarified: pipes in common areas are a matter for the owners' association, while pipes from the branch into the flat onwards are usually the responsibility of the flat owner. We document the point of damage in a way that makes this demarcation clear from the records and, if requested, work for both sides in parallel, provided this is communicated openly.

Who pays for what

CauseWho usually paysWhat is covered
Burst pipe in your own flatHousehold contents or homeowner's insurancedrying, consequential damage to contents
Burst pipe in the building, common partsBuildings insurance of the owners' associationbuilding fabric, drying
Water from the neighbouring flatthe neighbour's liability insurancedamage suffered by the person affected
Faulty appliance, such as a washing machineHousehold contents insurance, partly liability insurancedepending on the policy
Penetrating rainwater or flood wateronly with additional coverfrequently excluded or limited
Construction defect, leaking waterproofingthe contractor who did the work, under warrantyremedying the defect, not insurance
Backflow from the seweronly with additional coveroften excluded

In practice, the allocation is often disputed, particularly between flat owners and the property management. For us, this does not change the work – we measure, dry and document. But it is precisely in these cases that the value of the documents becomes clear: anyone who can present a measurement report, progress records and a clearance measurement is arguing about responsibility, not about the damage itself.

A piece of advice that regularly comes too late: the claim should be reported to the insurer immediately, even if the extent is still unclear. Many policies require prompt notification, and a notification can be supplemented later – a late one cannot be put right.

Equipment at a glance

DeviceFunctionOutput and consumptionNoise level
Condensation dryerextracts moisture from the room airapprox. 0.4–0.9 kW, 20–50 l of water per dayaudible, continuously
Desiccant (adsorption) dryersdrying in cold conditionshigher consumption, warm exhaust airclearly audible
Side-channel blowerair through the insulation layerapprox. 0.5–1.5 kWloud, often fitted with a silencer
Water separator and filterair cleaning under negative pressurelowquiet
Fansair movement across surfaceslowmedium
Air purifier with HEPA filterwhere germs or spores are suspectedlowquiet

Noise is what bothers occupants most, especially with side-channel blowers. Wherever possible, we place them outside the living area or use silencers. Switching them off at night sounds like the obvious answer, but it prolongs the drying and insurers are reluctant to pay for it – an honest discussion with the occupants is better here than a quiet switch-off that distorts the progress record.

Measuring: what really tells you something

MethodWhat it measuresReliability
Resistance measurement with electrodesconductivity in the materialapproximate value, affected by salts
Capacitive measurementmoisture in layers near the surfacegood for marking out the area, not for depth
CM moisture testwater content of a material samplebinding for screed before the floor covering is laid
Oven-drying method in the laboratoryexact water contenthighest accuracy, takes longer
Timber moisture measurementmoisture in the timberdecisive for timber joist ceilings
Climate measurement of temperature and humidityconditions in the roombasis for assessing progress
Thermographytemperature differences on surfacesshows distribution, not quantity

The third line is the most important one for reinstatement: before a floor covering is laid, the CM measurement counts as proof, not the electrical hand-held meter. Anyone who hires a floor layer will be asked for it – and without a report, no reputable floor layer will accept the warranty.

Worked example 1 · Burst pipe in a flat, 1050 Vienna, 28 m² affected
Measurement, assessment, drying plan€480
14 core holes for insulation layer drying€840
4 blowers, 2 condensation dryers, 18 days€2,340
Set-up, 3 check measurements, clearance measurement€890
Closing the drill holes, making good the edge zones€420

Total approx. €4,970 net. About 47 per cent of this was for unit-days – which is why the start is so decisive: starting two days earlier would probably have saved four unit-days in this case, i.e. around €520.

Worked example 2 · Basement after heavy rain, 1210 Vienna, 60 m²
Pumping out, rough cleaning, assessment€1,150
2 desiccant dryers, 4 fans, 26 days€3,120
Check measurements, climate log€640
Plaster at the base of the walls removed, clearance measurement€1,480

Total approx. €6,390 net. Removing the plaster at the base of the walls was unavoidable: the flood water had carried salts into it, which remain in the plaster and later attract moisture again. Drying alone would have postponed the problem, not solved it.

Why drying and restoration belong together

Every drying job is followed by reinstatement: closing the drill holes, perimeter joints, floor coverings, painting, often plumbing. If a second company has to be found for this, two problems arise. First, time passes during which the flat cannot be used. Second, responsibility shifts: whoever lays the floor covering wants proof that the substrate is dry – and once the drying company is no longer involved, that proof becomes a point of dispute.

When measurement, drying, clearance measurement and reinstatement are all in one pair of hands, this interface does not exist. The clearance measurement is then not a formality between two firms but our own precondition for the next step of the work – and responsibility stays in one place.

Step after dryingTypical scopeOrder of magnitude
Closing drill holes, edge connectionsealing, levelling15–35 €/m²
Partially renewing the screedwhere removal was necessary60–120 €/m²
New floor coveringvinyl, laminate, parquet, tiles45–160 €/m²
Wall plaster at the base of the wallsremove and rebuild€45–95/linear metre
Paintingaffected areas or the whole room12–24 €/m²
Plumbing and electrical connectionswhere affectedbased on effort

What you get at the end

  • Measurement report from the start stating the affected areas and readings.
  • Drying plan with method, number of units and expected duration.
  • Progress documentation of every check measurement with its date.
  • Clearance measurement report as proof for the insurer and the floor layer.
  • Electricity meter readings for billing the consumption.
  • Itemised invoice: unit-days, measurements and ancillary services shown separately.
  • Reinstatement on request under the same contract, with our own proof of dryness as the basis.

These documents are not paperwork; they are the part of the service that pays off later – with the insurer, with the property management and, in the most unpleasant case, with an expert witness.

Drying in an occupied flat

Most drying jobs in Vienna do not take place in empty properties but in flats where people carry on living. That is possible, but it has consequences that need to be discussed beforehand – otherwise the equipment gets switched off after three nights and the drying starts all over again.

TopicWhat to expectWhat helps
Noise50 to 65 decibels continuously, comparable to a vacuum cleaner in the next roomclose doors, keep the bedroom free if possible, choose the equipment accordingly
Heatdryers give off waste heat, rooms become 3 to 6 degrees warmerin summer, air at night if the drying plan allows it
Power consumption€3 to €9 per unit per day, with five units up to €45 a dayfit a sub-meter, log the consumption, submit it to the insurer
Spaceequipment and hoses need floor space, furniture has to be moved away from the wallsplan for clearing and covering before drying starts
Switching offevery interruption prolongs the drying disproportionatelyonly after consultation, noted in the report
Rent reductionpossible in the case of considerable impairment, the amount is decided case by casedocument the condition and duration, clarify with the property management
The most important point is the sub-meter. The electricity costs are initially borne by the occupant and are usually reimbursed by the insurer – but only if the consumption is documented. A meter costs little, is read when the equipment is set up and removed, and the readings are recorded in the report. Without a meter, consumption is estimated, and estimated amounts are the ones most often cut. We fit the meter as standard and enter the readings in the same documentation as the measurement values.

If the flat becomes uninhabitable during drying – for example because screed is being removed or the only bathroom is affected – this should be clarified early on. Many household contents policies cover hotel or alternative accommodation costs for a limited period, provided the uninhabitability is confirmed by the contractor carrying out the work or by an expert. We issue this confirmation where it is factually correct.

How to recognise a proper drying company

With water damage, those affected make decisions under time pressure, often after a call from the insurer or the plumber. These six points separate a clean process from an expensive one:

  • Measurements are taken before setting up, not afterwards. Anyone who brings equipment without measuring knows neither the method nor the duration.
  • The floor build-up is opened up or drilled into. Without knowing whether there is an insulation layer, no method can be chosen.
  • There is a written plan with the number of units and the expected duration, not just a daily rate.
  • Check measurements are scheduled, not optional. Without a progress record there is no justification towards the insurer.
  • The clearance measurement is promised, with a report.
  • An electricity meter is fitted, otherwise the consumption remains with the occupant.

If one of these points is missing, things usually do not get cheaper – they just get more expensive later, either because the insurer makes cuts or because the build-up was placed on a damp substrate.

Special cases

CaseSpecial featureApproach
Water in the underfloor heatingleak in the heating circuit, drilling is riskylaying plan or thermography before every drill hole
Listed buildingsurfaces may not be opened up at willagree openings in advance, gentle methods
Parquet on wet screedthe floor covering cups and is usually lostremove the floor covering, otherwise drying is impossible
Waste water from the sewergerm contaminationremoval instead of drying, disinfection, protective measures
Server room or storeroombusiness carries ondrying with partitioning, equipment set up outside
Empty flat in winterno heating, cold building elementsdesiccant drying, arrange for heating
Damage across several flatsseveral owners and insurersseparate reports for each unit, joint coordination

Another point concerns the sequence: electrical installations in the wet area must be checked before any equipment is connected. Damp distribution boards and soaked sockets are not unusual in water damage cases, and the additional continuous load from drying equipment then hits an installation that is already under strain. We clarify this with the electrician before setting up, because a failure in the middle of drying not only costs time but also interrupts the documentation.

The last case is the norm in Viennese tenement buildings: a burst pipe on the third floor affects three flats and the staircase. Each unit then needs its own documentation, because each insurer only examines its own part – but the drying itself is planned as a single operation, otherwise the units work against each other.

What you can do yourself before we arrive

  • Turn off the water – at the main stopcock or the angle valve, if the source is clear.
  • Check the electricity: if there is water near sockets or in the distribution board, switch off the affected circuit.
  • Take photos before anything is cleared away – extent, water level, affected items.
  • Take up standing water, as far as this can be done safely.
  • Raise furniture or take it out of the room, especially wood and upholstery.
  • Remove carpets and loose floor coverings, as they hold the moisture in the screed.
  • Report the damage – to the insurer and, for rented flats, also to the property management.
  • Do not rip things out straight away: the measurement decides what needs to be opened up.

The last point saves money. Anyone who tears out the floor covering in the first moment of panic sometimes damages material that could have been kept and makes the assessment harder. On the other hand, airing and heating never do any harm in the first few hours.

For property managers and specialist firms

Water damage comes without warning, usually at the weekend and rarely on its own. What we offer for this:

ServiceWhat this means
Fixed daily rates per unitpredictable, without a separate quotation for each claim
Measurement within a few working daysshorter with a framework agreement
Consistent documentationmeasurement report, progress record, clearance measurement – in the same format for every property
Our own equipment poolno dependence on hire depots
Seamless transition to restorationscreed, flooring, painting, bathroom – without awarding a second contract
One contact personeven with several cases of damage at the same time

For plumbers, the last point is particularly relevant: once the pipe has been repaired, the wet build-up remains, and the customer expects a solution. If you then have a partner who measures, dries and reinstates, you pass the damage on instead of having to explain it.

How this differs from our other services

Your projectMatching page
Repair the damage and restore the flatWater damage restoration
Remove mould and eliminate the causeMould remediation
Damp basement walls without a burst pipeWall damp-proofing
Damp basement, waterproofing from the insideBasement renovation
Saturated timber joist ceilingTimber beam ceiling repair
Rebuilding the screedScreed laying

When you do not need us

A knocked-over vase, an overflowing washbasin, damp tiles – these dry out by themselves with airing and heating. We come in when water has got into the floor build-up or into walls, when an insurer is involved, when a wet insulation layer is suspected or when building work is needed after the drying.

Frequently asked questions about building drying in Vienna

What does building drying cost in Vienna?
€18 to €45 per unit per day. An average water damage case with insulation layer drying comes to €1,200 to €4,500, minor damage with room drying only to €600 to €1,400.
How long does the drying take?
Surface damage 5 to 10 days, a wet insulation layer 14 to 25 days, a basement after flooding 21 to 40 days. What matters is how long the water had been standing before drying began.
Is it enough to set up dehumidifiers?
Only where the wetness is superficial. If there is water in the insulation layer beneath the screed, a room dryer merely dries the air – the cavity can only be reached with negative-pressure or positive-pressure methods.
Why are measurements taken beforehand?
Because without measurements neither the method nor the duration can be justified. The most common cut made by insurers does not concern the drying itself but its duration – and that can only be proven with readings.
Will the insurer pay for the drying?
For damage caused by escaping mains water, usually yes. You will need the claim notification, photos, measurement report, drying plan, progress record and clearance measurement. Flooding and sewer backflow are often only insured with additional cover.
Who pays for the electricity?
The consumption runs through the occupant's meter, €3 to €9 per unit per day. Insurers usually reimburse this, but they need the opening and closing readings – that is why we fit a sub-meter.
What is a clearance measurement?
The final proof that the substrate is back within the target range. Without this report, no reputable floor layer will accept the warranty, and if consequential damage occurs, the evidence is missing.
Can I stay in the flat during the drying?
Usually yes, with restrictions. The equipment runs day and night and is audible, especially side-channel blowers. Where possible, we place it outside the living area or use silencers.
May I switch the equipment off at night?
Better not. It prolongs the drying, distorts the documented progress and insurers are reluctant to cover it. If the strain is too great, we discuss a solution rather than quietly switching off.
Should I air the rooms while the equipment is running?
With condensation dryers, no – windows left permanently open draw in damp outside air, which the unit then has to dehumidify as well. With desiccant dryers, controlled exhaust air can be part of the plan. We explain what applies when we instruct you on site.
Should the heating stay on?
Yes. Warmth speeds up drying considerably. Radiators turned off are one of the most common reasons why drying takes longer than planned.
When is removal better than drying?
With waste water, flood water, a long standing time or visible mould. Germs and spores in the insulation cannot be dried away. Removal costs €80 to €180/m² plus rebuilding, but in those cases it is the only lasting solution.
What is different with a timber joist ceiling?
There is no insulation board there, but a fill over timber beams. Wet timber at room temperature leads to fungal attack, so the ceiling is opened up, the timber moisture is measured, and the soaked fill is usually removed rather than dried.
When is there a risk of mould?
First germination is possible after two to four days, visible growth after five to ten. After two weeks, growth in cavities is likely. That is why an early start is the most effective and cheapest measure.
Do holes have to be drilled in the floor?
For insulation layer drying, yes – in a grid according to the area, €45 to €90 per hole. They are sealed again after the clearance measurement and are no longer visible after reinstatement.
What is the difference between negative and positive pressure?
With negative pressure, air is sucked out of the cavity and discharged through filters – preferred where germs are suspected. With positive pressure, dry air is forced in; this is faster but spreads particles into the room.
How is screed measured before the floor covering is laid?
With the CM measurement on a material sample. Electrical hand-held meters only give approximate values and are not suitable as proof – the floor layer will ask for the CM value.
Do you also carry out drying in new buildings?
Yes, construction moisture from concrete, screed and plaster, especially in winter. There the aim is to speed things up, not to limit damage – the moisture is evenly distributed and known.
What should I do immediately, before you arrive?
Turn off the water, check the electricity in the affected area, take photos, take up standing water, get furniture and carpets out, report the damage. Do not rip anything out straight away – the measurement decides what gets opened up.
How quickly can you come?
Measurement within a few working days, faster for property managers with a framework agreement. Because every day counts, we go through the immediate measures with you by phone before we are on site.
Do you also carry out the reinstatement?
Yes: closing the drill holes, screed, floor coverings, plaster at the base of the walls, painting. The advantage lies at the interface – the proof of dryness is then our own basis for the reinstatement, not a point of dispute between two firms.
Why did the plaster in the basement have to be removed?
After flooding, salts are carried into the plaster; they remain there and later attract moisture again. Drying alone only postpones the problem – the plaster at the base of the walls has to come off and be rebuilt.
Can the drying be ended early?
Technically yes, but it rarely makes sense. Residual moisture trapped under a new floor covering leads to mould months later – and by then the cause can no longer be proven and the damage is no longer covered.
How many units are needed?
That depends on the area, the build-up and the room volume, and it is set out in the drying plan. For 28 m² with insulation layer drying, four blowers and two condensation dryers are a typical set-up.
Do you work with hired equipment?
We work with our own equipment pool. This matters with water damage, because after heavy rainfall in Vienna the hire depots are empty within a day.
What should be done about damage coming from the neighbouring flat?
Report it immediately – to your own insurer and to the property management. The claim is usually settled through the liability insurance of whoever caused it. Your position depends on the documentation, not on the discussion.
Do you also dry commercial properties?
Yes, shops, storerooms and offices. There, the interruption to business is usually a bigger issue than the drying itself, so we plan the set-up and the timings around your operations.
What does the measurement alone cost?
€280 to €650 including the assessment and the proposed method. If drying follows, this forms the basis for the entire billing towards the insurer.
Can moisture get into a wall without a burst pipe?
Yes, for example through rising damp in older buildings. Then building drying will not help; what is needed is a horizontal damp-proof barrier – see wall damp-proofing.
Who is liable if mould appears after reinstatement?
The documentation decides. If there is a clearance measurement and the build-up was carried out professionally afterwards, the cause must be sought elsewhere. If it is missing, in practice the risk lies with whoever carried on building without proof.

Related services

◆ Partner company · Bling Premium Reinigung

Want the flat clean again after the drying?

Detailed cleaning and removal of the traces left by the drying are handled by our partner company Bling Bling Premium Reinigung. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Building drying Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your building drying in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.