Stairwell renovation Vienna the first impression of the entire building.
Stairwell renovation in Vienna: from the contractor who does the work — not from an agent.
Stairwell renovation in Vienna: in a Viennese tenement building (Zinshaus) with four to five storeys, a stairwell renovation usually costs €25,000 to €90,000 net. Painting, steps, railings, lighting and fire protection – in an occupied building, section by section, with consideration for day-to-day life in the house.
What belongs to the stairwell – and why that matters
Before anyone talks about colours, it has to be clear which building components are actually part of the works. That determines who decides on them, who pays for them and which regulations apply.
| Building element | What it belongs to | What to look out for |
|---|---|---|
| Walls and ceilings | common part | in old buildings usually lime plaster, breathable paint required |
| Steps and landings | common part | slip and trip safety; worn edges are a liability risk |
| Railing and handrail | common part | height, fixing, gap width where children are concerned |
| Flat entrance doors | shared, depending on the agreement | fire protection requirement possible, outer face often a common part |
| Lighting | common part | escape route lighting, motion sensors, emergency lighting depending on the building |
| Stairwell windows | common part | smoke ventilation, ventilation, partly a protected zone |
| Risers and meters | common part | clarify before painting, otherwise the walls will be opened up again |
| Letterbox unit | common part | replacement cheaper if the wall is open anyway |
Why it differs from a flat renovation, step by step
Three differences determine the entire process – and therefore the price as well.
| Topic | Flat | Stairwell | Consequence for the works |
|---|---|---|---|
| Use during the works | empty, cleared out | daily, by everyone, around the clock | section by section, access always clear |
| Legal basis | owner decides | resolution, reserve fund, maintenance obligation | verifiable bill of quantities required |
| Regulations | few | escape route, fire protection, lighting | coordination before the works |
| Surfaces | quality of living | wear and tear, ease of cleaning | hard-wearing dado instead of living-room paint |
| Working hours | unrestricted | consideration for residents, night-time quiet | noisy work at off-peak times |
This has a direct impact on the calculation: an area that would be finished in one day in an empty flat takes two in a stairwell – because everything is covered, kept clear, cordoned off and reopened. When comparing offers, you should therefore check whether protective measures and section-by-section working are included or whether they will turn up later as a variation.
Stairwell renovation in Vienna: costs 2026
Guide values net, as of 2026, for a tenement building with four to five storeys and one staircase. Binding after a site visit.
| Scope | What is done | Price net | Duration |
|---|---|---|---|
| Refresh | repainting, dado, painting the railing | 25.000–40.000 € | 3–5 weeks |
| Repair | plus plaster damage, step repairs, new lighting | 40.000–65.000 € | 5–8 weeks |
| Complete renovation | plus renewing steps, fire doors, service lines | 65.000–90.000 € | 8–12 weeks |
Unit prices
| Item | Unit | Price net | What is included |
|---|---|---|---|
| Painting walls and ceiling | m² | 12–22 € | covering, filling, two coats |
| Hard-wearing dado coating | m² | 22–38 € | washable, up to a height of about 1.5 m |
| Repairing plaster damage | m² | 35–85 € | knocking off hollow areas, replastering |
| Repairing an artificial stone step | pc. | 80–220 € | rebuilding edges, grinding, finishing |
| Re-covering a step | pc. | 180–450 € | natural stone or artificial stone |
| Sanding and painting the railing | linear m | 45–110 € | rust removal, primer, top coat |
| Renewing the handrail | linear m | 60–180 € | wood or metal, fixing checked |
| Lighting with motion sensors | storey | 450–1.200 € | by a licensed electrical contractor |
| Replacing a fire door | pc. | 1.800–4.500 € | to the required class, with certification |
| Fire stopping of service lines | pc. | 150–600 € | penetrations through floors and walls |
| Renovating stairwell windows | pc. | 450–1.400 € | fittings, paintwork, seals |
| New letterbox unit | lump sum | 1.500–4.500 € | depending on number and design |
| Protection of doors and floors | lump sum | 900–2.500 € | for the entire construction period |
| Internal scaffolding or mobile scaffold tower | lump sum | 800–3.200 € | depending on height and floor plan |
Total around €44,600 net. The breakdown separates maintenance from improvement so that the property management can allocate the costs correctly.
Total around €55,500 net for both staircases. Per staircase this is below the tenement building example, because set-up time, travel and protective measures are spread over two staircases – an effect that carries considerable weight on larger complexes.
Fire protection in the stairwell: what is required and why
In the event of fire, the stairwell is the only escape route and at the same time the route by which the fire brigade enters the building. That is why requirements apply there that do not apply in flats. They all serve the same purpose: the way out must remain smoke-free and passable until everyone is outside.
| Topic | What it is about | Typical measure |
|---|---|---|
| Flat entrance doors | prevent fire and smoke from getting from the flat into the escape route | door with the required fire resistance class, tightly closing, self-closing where required |
| Smoke ventilation | smoke must be able to escape at the top | smoke vent window or opening at the very top, release mechanism tested |
| Service penetrations | open pipe penetrations pass fire and smoke on | fire stopping for each penetration, documented |
| Combustible fixtures | wooden panelling and stored items increase the fire load | remove or upgrade, keep the escape route clear |
| Lighting | the route must remain recognisable during a power cut | safety or emergency lighting depending on the building |
| Items left in the corridor | prams, shoe racks and boxes narrow the escape route | house rules, create alternative storage areas |
Which of these points are actually required depends on the building – year of construction, number of storeys, use and whether official proceedings are under way. We clarify this with the specialist firms before the works begin, rather than opening things up again afterwards. Because this is precisely the point at which an otherwise successful renovation becomes expensive: if the fire doors are replaced after the painting, every reveal turns into a construction site again.
The surfaces: why stairwells are painted differently
Wall paint in a stairwell has to do three things at once: withstand wear and tear, let the substrate breathe and be easy to clean. These three requirements partly contradict one another, and that is where the usual two-part division comes from.
| Area | Requirement | Suitable finish | Why not otherwise |
|---|---|---|---|
| Upper wall area and ceiling | breathable, opaque | emulsion or silicate paint | a dense coating damages the lime plaster |
| Dado up to about 1.5 m | washable, impact-resistant | hard-wearing dado coating or gloss paint | ordinary wall paint does not stand up to shoes and wheels |
| Damp areas on the ground floor | salt-tolerant | renovation plaster with breathable paint | emulsion paint seals the surface, the plaster flakes off |
| Metal railing | corrosion protection | rust removal, primer, top coat | paint without primer peels within a year |
| Wooden handrail | feel, abrasion | sanding, oiling or varnishing | a thick coat of varnish becomes slippery and cracks |
The most common mistake concerns the ground-floor area: in a Gründerzeit building there is almost always moisture at the base of the wall there, because there is no horizontal damp-proof course. If it is painted over with emulsion paint, salts bloom through the plaster again within one heating season. The right approach is to establish the cause first and build up the dado with renovation plaster – see wall damp-proofing.
Steps: repair, re-cover or replace
Viennese staircases are usually made of artificial stone, less often of natural stone or wood. Worn step edges are not just unsightly, they are a fall hazard – and therefore a liability issue for the owners' association.
| Condition | Measure | Price per step | Durability |
|---|---|---|---|
| edges slightly worn, surface dull | rebuild and grind | 80–220 € | 10–20 years |
| edges badly chipped | add an edge profile or re-cover the step | 180–450 € | 15–25 years |
| step cracked or loose | replace the step, check the bearing | depending on findings | permanent |
| Worn wooden staircase | sanding, adding nosings | 120–300 € | 10–15 years |
Why are steps usually repaired rather than replaced? Because in old buildings the steps are load-bearing components that are built into the stringer wall or rest on supports. Replacing them means intervening in the structure, temporary safeguarding and usually a structural assessment as well. Repairing the surface achieves the same level of safety at a fraction of the cost – as long as the step itself is intact.
Resolution, reserve fund and billing
In a condominium, the renovation of a common part is paid from the reserve fund, and the owners pass a resolution on it. For the property management, it is therefore not only the price that matters but also the form of the offer.
| What is needed | What for |
|---|---|
| Bill of quantities with quantities | comparability of several offers, basis for the resolution |
| Separation of maintenance and improvement | different allocation and resolution requirements |
| Schedule with sections | informing residents, planning withdrawals from the reserve fund |
| Before-and-after photo documentation | evidence for the owners, basis for any queries |
| Rules on variations | clear that additional work is only done after written approval |
What saves the most time in practice: when the offer is already structured so that it can be taken over into the draft resolution without reworking. That is exactly how we deliver it – not as a marketing brochure, but as a verifiable schedule of works.
The process in an occupied building
The basic rule is: the way to each flat's front door must be passable at all times, for every resident, at any time of day. Everything else is subordinate to that.
Two points are regularly underestimated in offers. First, the time lost by keeping areas clear: a surface is done in two passes instead of one. Second, drying times: a dado coating over which prams are pushed the same evening will not last. That is why we plan sections so that drying and use do not get in each other's way.
What should be clarified before the renovation
| Topic | Why now | Consequence if it is missing |
|---|---|---|
| Age and condition of the risers | usually run through the stairwell | freshly finished wall is opened up again for the riser replacement |
| Electrical cables and distribution boards | old cables are embedded in the plaster | chases cut through the new paintwork |
| Fire doors | replacement affects the reveal and the wall | rework on freshly painted surfaces |
| Planned lift installation | changes the stairwell void or the courtyard | parts of the renovation become redundant |
| Damp at dado level | the cause must be remedied before plastering | plaster flakes off within one heating season |
| Resolution and financing | reserve fund, majority, timing | delay after the contract has been awarded |
| Listed building or protected zone | historic elements, terrazzo, stucco | removing the wrong thing cannot be undone |
Historic fabric: what should be preserved
In Gründerzeit buildings, the stairwell often contains more historic fabric than is visible at first glance – under layers of paint, behind cladding or beneath PVC flooring.
| Element | Why it is valuable | How we handle it |
|---|---|---|
| Terrazzo floor | durable, distinctive, almost irreplaceable | grind and impregnate instead of covering over |
| Wrought-iron railing | defines the building, elaborate craftsmanship | remove rust and paint, re-forge missing parts |
| Stucco mouldings and cornices | part of the building's appearance | clean, complete, do not fill over |
| Panelled doors | solid wood, repairable | refurbish, keep the original fittings |
| Leaded and ornamental glass windows | historic, often one-offs | restore professionally, do not replace |
| Stencilled wall patterns and original colour schemes | original design | carry out a survey before painting over |
In old buildings, a simple test is worthwhile before the first coat: the layers are exposed at an inconspicuous spot. If a historic colour scheme appears underneath, you can decide whether to take it up again. This costs little and is the only opportunity – once everything has been painted over, the information is lost.
Accessibility and lifts
Many tenement buildings have no lift, and the stairwell is the place where that could change. Two approaches are common: installation in the stairwell void, or in the courtyard with connections to the landings. Both change the stairwell considerably and affect the structure, escape routes and fire protection.
| Option | Advantage | Disadvantage | Order of magnitude |
|---|---|---|---|
| Lift in the stairwell void | no loss of space in the courtyard, short distances | stairwell void often too small, the railing has to go | 85.000–160.000 € |
| Lift in the courtyard | more space, access at half-landing level possible | intervention in the courtyard, longer distances | 110.000–180.000 € |
| Ramp in the entrance area | inexpensive, creates step-free access | only solves the ground floor | 4.000–18.000 € |
Anyone planning a lift should combine the stairwell renovation with it, or at least schedule the renovation afterwards. Otherwise a freshly renovated stairwell will be opened up again for the installation – the same logic as with the service lines.
The most common mistakes
| Mistake | Why it happens | What it costs |
|---|---|---|
| Painting before the riser replacement | visible results first | wall is chased open, patching remains visible |
| Emulsion paint on a damp dado | faster and cheaper | plaster flakes off after one heating season |
| Dado coating without drying time | time pressure, residents want to get through | abrasion within weeks, rework |
| Painting the railing without removing rust | primer seems dispensable | rust bleeds through, a new coat is needed |
| Covering terrazzo instead of grinding it | a new floor covering seems simpler | irretrievable loss, lower property value |
| Fire protection after the painting | seen as a separate issue | reveals and walls damaged again |
| No protection for the flat doors | saves material | paint splashes on doors, complaints |
| No notice for the residents | considered unnecessary | complaints, obstruction, construction delays |
When you do not need us
If the only work is repainting and neither steps nor doors, service lines nor fire protection are affected, a painting firm is enough, and that is then cheaper. A coordinating construction company pays off as soon as plaster, steps, electrics and fire protection come together – or when the property management needs a verifiable breakdown for the resolution and the reserve fund.
How costs differ by type of building
Two stairwells with the same number of storeys can differ in price by a factor of two. The reasons almost never lie in the floor area alone, but in height, fittings and accessibility.
| Building type | Typical features | Cost drivers | Guide value per storey |
|---|---|---|---|
| Gründerzeit tenement building | high ceilings, stucco, terrazzo, box-type double windows | ceiling height, scaffolding effort, historic details | 6.000–14.000 € |
| Interwar building | plainer, lower ceilings, robust surfaces | usually lower, often just painting and steps | 4.000–8.000 € |
| Post-war building | concrete, straight flights, little ornamentation | lighting and fire protection rather than craftsmanship | 3.500–7.000 € |
| Residential complex with several staircases | identical geometry, high repetition | economies of scale lower the price per staircase | 3.000–6.000 € |
The single biggest factor in a Gründerzeit building is the ceiling height. With a clear height of four metres, every wall surface becomes scaffold work, and the same square metre costs many times what it costs in a post-war building with 2.50 metres. This also explains why flat-rate prices per storey without a site visit say little – the height is not stated in any property listing.
Safety: the four points that count
A stairwell is not living space but a circulation route. Safety defects here are not a matter of taste, but questions of liability for owners and the property management.
- Step edges. Worn, chipped or unevenly high steps are the most common cause of falls. Rebuilding and grinding costs less than a single liability case.
- Handrail. It must be continuously graspable and firmly anchored. Interruptions at landings and loose fixings are typical defects in old buildings.
- Lighting. Light has to be where people walk, and it has to come on immediately when they enter. Motion sensors on each level solve this more reliably than a timer switch that goes off halfway up.
- Slip resistance. Freshly ground terrazzo and varnished wooden steps can be slippery. A suitable after-treatment or an anti-slip nosing at the edge prevents this.
These points belong in every offer, even if they make no visual impression. They are the part of the renovation that counts in an emergency – and the part that is most expensive to retrofit afterwards.
After the renovation: how the result lasts
After five years, a freshly renovated stairwell looks very different depending on what happens afterwards. Three things decide this.
| Topic | Effect | Recommendation |
|---|---|---|
| Cleaning | dust and road salt attack surfaces | regular stairwell cleaning, more often in winter |
| Dado area | shoes, bicycles and furniture removals take their toll | hard-wearing coating, annual visual inspection |
| Damp on the ground floor | returns if the cause remains | damp-proofing before the renovation, not afterwards |
| Minor damage | becomes major damage if left unattended | repairs as part of ongoing building care |
Experience shows that properly executed painting in a stairwell lasts eight to fifteen years, the dado area five to ten, and repaired steps ten to twenty-five. Anyone who increases rather than reduces cleaning after the renovation extends these periods noticeably – and that is exactly where the cheapest lever in the entire life cycle lies.
How to recognise a reliable offer
Offers for stairwells vary widely, because the scope of ancillary work is rarely put out to tender. These points make a comparison possible:
- Wall areas with quantities rather than “stairwell, lump sum”. Only the figure in square metres makes two offers comparable.
- Protective measures as a separate item. Anyone who does not list them will charge for them later or not carry them out at all.
- Scaffolding or mobile tower named. In tall Gründerzeit stairwells this is a significant amount that is often missing.
- Dado area priced separately. A different paint, a different price – if it is not included, the same paint goes on at the top and the bottom.
- Steps at a unit price. This lets you decide how many are repaired without changing the entire offer.
- Section-by-section working guaranteed. Otherwise, if in doubt, half a staircase is closed off for days.
- Separation of maintenance and improvement. For the property management, the most important line in the whole document.
An offer that includes all of this looks more extensive and, at first glance, more expensive. In the final account it is almost always the cheaper one, because the items it lists turn up as variations with the other contractor.
What you get at the end
- Acceptance report under ÖNORM B 2110 with snagging list and deadlines.
- Photo documentation before and after the works, storey by storey.
- Breakdown separated into maintenance and improvement, usable directly for billing.
- Certificates from the specialist firms for electrical and fire protection work.
- Materials list with colour shades and products – important for later touch-ups, so that nothing has to be re-mixed.
The last point sounds trivial and in practice saves the most: if the colour shade has been documented, a damaged spot can be touched up three years later without repainting the whole wall.
From the first conversation to the handover
For common parts, the path from the idea to the start of works usually takes longer than the construction period itself. This is not down to the tradespeople, but to resolutions, reserve funds and coordination. Anyone who knows the process can plan realistically.
| Step | Who | Typical duration | What is decided |
|---|---|---|---|
| Survey and site visit | property management with us | 1 week | scope, condition, the service line question |
| Bill of quantities and offer | us | 2 working days | quantities, prices, schedule |
| Obtaining comparative offers | property management | 2–4 weeks | comparability on the basis of the bill of quantities |
| Owners' resolution | owners' association | 2–8 weeks | scope, financing, timing |
| Contract award and scheduling | property management | 1 week | start of works, sections, notice |
| Execution | us | 3–12 weeks | sections, protection, access |
| Handover and final account | jointly | 1 week | report, defects, retentions |
In practice, this means that anyone who wants the renovation done in autumn should start the survey in spring. And anyone who obtains comparative offers on the basis of a common bill of quantities shortens the entire process considerably – because the offers are then genuinely comparable and the discussion at the owners' meeting is shorter.
Special case: renovation after damage
Not every stairwell renovation is planned. After water damage from a burst riser, after a fire or after damage from a break-in, other questions arise: drying, insurance cover and speed.
| Type of damage | Sequence | Special feature |
|---|---|---|
| Water damage from a riser | repair the pipe, dry out, measure, then renovate | drying takes time, plaster only afterwards |
| Fire damage | remove soot, neutralise odours, then rebuild | soot penetrates deeply, painting over is not enough |
| Moisture damage from outside | repair the facade or gutter, then the interior | without eliminating the cause, the damage returns |
| Vandalism | documentation, police report, then repair | photos for the insurer before cleaning |
In all four cases, the same principle applies as for a planned renovation, only under time pressure: first the cause, then drying, then the surface. Anyone who cuts this process short will have the damage back within a few months – and then usually without insurance cover, because the work was not carried out properly. For water damage, we provide the documentation in the form insurers usually require: photos, drying measurement reports and an itemised breakdown.
What a renovated stairwell brings economically
The stairwell generates no rent, and yet it has an economic effect on three levels. This is the argument that is usually missing at owners' meetings.
| Level | Effect | Timing |
|---|---|---|
| Letting | The first impression is formed before the front door of the flat. Prospective tenants judge the property management and the condition of the building by the common areas. | with every new letting |
| Building fabric | Plaster damage, damp and loose steps become more expensive over time, not cheaper. | continuously |
| Liability | Worn steps, loose handrails and failed lighting are risks borne by the owners' association. | in the event of a claim |
| Sale | A well-kept stairwell signals a well-kept property – the impression is formed in the first thirty seconds. | on disposal |
This overview leads to a simple recommendation: the renovation should not wait until the condition bothers someone, but should be planned into the maintenance cycle. Anyone who renews the paintwork every ten to twelve years and keeps the steps in repair on an ongoing basis pays less overall than someone who waits thirty years and then has to renovate plaster, steps and railings all at once.
Communication with residents
The most common cause of conflict on this kind of site is not noise but a lack of information. What has proven effective:
- A notice two weeks in advance with the period, sections, contact person and the site management's telephone number.
- A weekly plan on the ground floor showing which storey is being worked on when – so everyone knows when it affects them.
- Wet paint signs directly on site, not just in the notice.
- Fixed times for noisy work, outside the quiet hours and, where possible, in the morning.
- One contact person instead of changing crews – this significantly reduces the number of queries to the property management.
These measures cost almost nothing and prevent the majority of complaints that would otherwise end up with the property management. For us they are standard, not an extra.
What is usually done around the stairwell at the same time
A stairwell does not end at the last step. If work is being done anyway, adjacent areas can be included with little extra effort – above all those that would otherwise require their own protection, scaffolding and travel.
| Area | Typical condition | Additional effort | Why it makes sense to combine |
|---|---|---|---|
| Building entrance and vestibule | worn door, weathered plinth | 2.500–12.000 € | shapes the impression more than any other area |
| Stairs down to the basement | damp, dark, plaster damage | 1.500–6.000 € | same trades, same materials |
| Bin room | odour, damaged surfaces | 1.200–4.500 € | a washable coating quickly pays for itself |
| Bicycle room or pram storage area | often improvised | 2.000–8.000 € | takes pressure off the escape route in the stairwell |
| Passage to the courtyard | plaster damage, vaulting, lighting | 3.000–15.000 € | one scaffold, two results |
| Letterboxes and doorbell panel | faulty, unlabelled | 1.500–6.000 € | wall opening already there |
The fourth point in particular is underestimated: anyone who creates a proper storage area for prams and bicycles permanently solves the problem of blocked escape routes. That is cheaper than any discussion about the house rules and lasts longer than a notice.
When a phased solution pays off
If the reserve fund is limited, there is no need to wait for the full package of works. Sensibly divided phases take effect sooner and do not get in each other's way – provided the sequence is right.
| Phase | Content | Why in this order |
|---|---|---|
| First phase | clarify service lines and fire protection, remedy safety defects | concerns building fabric and liability, not appearance |
| Second phase | Ground floor and entrance area | greatest effect per euro spent |
| Third phase | upper storeys, painting and steps | even wear, easy to plan |
| Fourth phase | ancillary rooms, basement, bin room | can be done afterwards without scaffolding |
What does not work: painting the ground floor before the damp at the base of the wall has been dealt with, or bringing the painting forward even though the riser replacement is due in two years. Both scenarios are common, and both mean paying for the phase a second time.
Building entrance, front door and intercom: the first few metres
Anyone renovating a stairwell thinks of walls and steps first. But the impression a building makes is formed before that – at the front door, in the vestibule and at the doorbell panel. In many Gründerzeit buildings the door is made of wood, heavy, often with a fanlight and original fittings. Preserving it is usually worthwhile: stripping, replacing damaged parts, renewing the lock and door closer, repainting. Replacing it with an industrial door almost always looks out of place in a historic carriage entrance and is a delicate matter in a protected zone anyway.
Technically, the entrance often brings the greatest improvement per euro. A working door closer prevents the door from standing open and letting cold, dirt and strangers into the building. A new intercom, with video if desired, is best coordinated with the painting, because cables have to be run in the wall for it. Anyone who leaves this work until the end opens up freshly painted surfaces a second time. The electrical work for it is carried out by licensed partners; coordination lies with us – more on this under electrical work.
Season and drying in a cold stairwell
A stairwell is usually unheated. In winter, the temperature at external walls and on the ground floor is often only a few degrees above the outside air. That is a problem for painting and filling work: according to the manufacturers, most paints and fillers need at least around +5 °C in the air and on the substrate, otherwise they do not cure properly and remain vulnerable. On top of that comes moisture from shoes and umbrellas, which dries only slowly in the cold air.
That is why the period from spring to autumn is ideal for the large surfaces. In winter, work that is less sensitive to temperature can be done: electrical installations, fire doors, refurbishing railings in the workshop, repairing steps. If painting has to be done in the colder half of the year, site heaters help, along with a plan that deals with the upper, warmer storeys first. For property management companies, this results in a simple rhythm: resolution and tender in winter, works from spring onwards.
Surfaces for heavily used buildings
In buildings with many flats, prams and bicycles, an ordinary coat of paint in the lower wall area does not last long. A two-part solution has proven itself: at the bottom a hard-wearing, washable dado up to about chest height, at the top a breathable paint. Where scribbling or graffiti become an issue, a protective coating in the entrance area can make sense, from which paint can be removed more easily. Which paint systems suit which purpose is explained on the page about painting work.
Frequently asked questions about stairwell renovation in Vienna
How often should a stairwell be renovated?
What does it cost with several staircases?
How much does ceiling height affect the price?
What happens after water damage in the stairwell?
Can cleaning after the renovation be commissioned at the same time?
How long does the result last?
How much does a stairwell renovation cost?
What does the price depend on most?
Who pays for the stairwell renovation?
Can residents stay in the building during the works?
How long does the renovation take?
Why should the riser replacement be done first?
Do the fire doors have to be replaced?
What are the rules for prams and shoe racks in the stairwell?
Which paint is suitable for a stairwell?
What happens to worn steps?
Can a terrazzo floor be preserved?
What about the wrought-iron railing?
Is there any funding?
How is the resolution prepared?
Who carries out electrical and fire protection work?
Is the lighting renewed as well?
What about smoke ventilation?
Can the flat doors be included?
How is the building protected during the works?
What happens with a listed building or a protected zone?
Is it worth planning the lift at the same time?
How do you deal with variations?
What happens if damp turns up under the plaster?
Do residents get a contact person?
Do you also do individual sections?
How is billing handled with the owners' association?
How quickly will I get an offer?
Should the old front door be kept during a stairwell renovation?
Can a stairwell be renovated in winter?
When should the intercom be renewed?
Related services
Stairwell freshly done? Regular cleaning keeps it that way.
After the renovation, our partner company Bling Premium Reinigung takes over the stairwell cleaning – as a one-off after the works or on an ongoing basis for the property management. More at bling-bling.at.
Send enquiry
Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.
Ready for your stairwell renovation in Vienna?
Write to us directly on WhatsApp — send photos. Reply within 2 working days.
Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.