Stairwell renovation Vienna the first impression of the entire building.

Stairwell renovation in Vienna: from the contractor who does the work — not from an agent.

Stairwell renovation in Vienna: in a Viennese tenement building (Zinshaus) with four to five storeys, a stairwell renovation usually costs €25,000 to €90,000 net. Painting, steps, railings, lighting and fire protection – in an occupied building, section by section, with consideration for day-to-day life in the house.

The stairwell is the only space that every resident, every visitor and every prospective tenant or buyer sees several times a day. At the same time, it is a common part of the building – so not an area where someone decides according to personal taste, but one on which the owner or the owners' association resolves and which the property management bills. In construction terms it is also a special case: it is an escape route, it carries service lines, it has fire protection requirements, and the work takes place while everyone walks through it every day. Anyone who treats the stairwell like a large flat underestimates both the regulations and the logistics. For individual defects in the stairwell, minor repairs are often enough instead of a full renovation.
✓ Work carried out in an occupied building✓ Access always kept clear✓ Fire protection checked as well✓ Breakdown for the reserve fund✓ Fixed price under ÖNORM B 2110

What belongs to the stairwell – and why that matters

Before anyone talks about colours, it has to be clear which building components are actually part of the works. That determines who decides on them, who pays for them and which regulations apply.

Building elementWhat it belongs toWhat to look out for
Walls and ceilingscommon partin old buildings usually lime plaster, breathable paint required
Steps and landingscommon partslip and trip safety; worn edges are a liability risk
Railing and handrailcommon partheight, fixing, gap width where children are concerned
Flat entrance doorsshared, depending on the agreementfire protection requirement possible, outer face often a common part
Lightingcommon partescape route lighting, motion sensors, emergency lighting depending on the building
Stairwell windowscommon partsmoke ventilation, ventilation, partly a protected zone
Risers and meterscommon partclarify before painting, otherwise the walls will be opened up again
Letterbox unitcommon partreplacement cheaper if the wall is open anyway
The most important question before any stairwell renovation is not “which colour?” but “what is inside this wall?”. In Vienna's old buildings, risers for water, gas and electricity almost always run through the stairwell. If they are more than fifty years old, their replacement is only a matter of time. Anyone who paints first paints twice: for a riser replacement, chases are cut into the freshly painted wall, and the patching remains visible afterwards. That is why the work always starts with a survey of the service lines, not with the colour chart.

Why it differs from a flat renovation, step by step

Three differences determine the entire process – and therefore the price as well.

TopicFlatStairwellConsequence for the works
Use during the worksempty, cleared outdaily, by everyone, around the clocksection by section, access always clear
Legal basisowner decidesresolution, reserve fund, maintenance obligationverifiable bill of quantities required
Regulationsfewescape route, fire protection, lightingcoordination before the works
Surfacesquality of livingwear and tear, ease of cleaninghard-wearing dado instead of living-room paint
Working hoursunrestrictedconsideration for residents, night-time quietnoisy work at off-peak times

This has a direct impact on the calculation: an area that would be finished in one day in an empty flat takes two in a stairwell – because everything is covered, kept clear, cordoned off and reopened. When comparing offers, you should therefore check whether protective measures and section-by-section working are included or whether they will turn up later as a variation.

Stairwell renovation in Vienna: costs 2026

Guide values net, as of 2026, for a tenement building with four to five storeys and one staircase. Binding after a site visit.

ScopeWhat is donePrice netDuration
Refreshrepainting, dado, painting the railing25.000–40.000 €3–5 weeks
Repairplus plaster damage, step repairs, new lighting40.000–65.000 €5–8 weeks
Complete renovationplus renewing steps, fire doors, service lines65.000–90.000 €8–12 weeks
Stairwell renovation in Vienna: costs 2026 – net price overview
Stairwell renovation in Vienna: the prices from the table at a glance, as of 2026, net.

Unit prices

ItemUnitPrice netWhat is included
Painting walls and ceilingm²12–22 €covering, filling, two coats
Hard-wearing dado coatingm²22–38 €washable, up to a height of about 1.5 m
Repairing plaster damagem²35–85 €knocking off hollow areas, replastering
Repairing an artificial stone steppc.80–220 €rebuilding edges, grinding, finishing
Re-covering a steppc.180–450 €natural stone or artificial stone
Sanding and painting the railinglinear m45–110 €rust removal, primer, top coat
Renewing the handraillinear m60–180 €wood or metal, fixing checked
Lighting with motion sensorsstorey450–1.200 €by a licensed electrical contractor
Replacing a fire doorpc.1.800–4.500 €to the required class, with certification
Fire stopping of service linespc.150–600 €penetrations through floors and walls
Renovating stairwell windowspc.450–1.400 €fittings, paintwork, seals
New letterbox unitlump sum1.500–4.500 €depending on number and design
Protection of doors and floorslump sum900–2.500 €for the entire construction period
Internal scaffolding or mobile scaffold towerlump sum800–3.200 €depending on height and floor plan
Worked example 1 · tenement building, 5 storeys, one staircase, repair
Protection, plaster damage, painting 720 m²€21,600
Dado coating 180 m², railing 42 linear metres€9,800
34 steps repaired€4,800
Lighting on 6 levels, fire stopping€8,400

Total around €44,600 net. The breakdown separates maintenance from improvement so that the property management can allocate the costs correctly.

Worked example 2 · residential complex, 8 storeys, two staircases, refresh
Protection and cordoning off, both staircases€3,800
Painting 1,980 m², dado 460 m²€38,900
Railing 96 linear metres painted€7,600
Lighting supplemented, minor repairs€5,200

Total around €55,500 net for both staircases. Per staircase this is below the tenement building example, because set-up time, travel and protective measures are spread over two staircases – an effect that carries considerable weight on larger complexes.

Fire protection in the stairwell: what is required and why

In the event of fire, the stairwell is the only escape route and at the same time the route by which the fire brigade enters the building. That is why requirements apply there that do not apply in flats. They all serve the same purpose: the way out must remain smoke-free and passable until everyone is outside.

TopicWhat it is aboutTypical measure
Flat entrance doorsprevent fire and smoke from getting from the flat into the escape routedoor with the required fire resistance class, tightly closing, self-closing where required
Smoke ventilationsmoke must be able to escape at the topsmoke vent window or opening at the very top, release mechanism tested
Service penetrationsopen pipe penetrations pass fire and smoke onfire stopping for each penetration, documented
Combustible fixtureswooden panelling and stored items increase the fire loadremove or upgrade, keep the escape route clear
Lightingthe route must remain recognisable during a power cutsafety or emergency lighting depending on the building
Items left in the corridorprams, shoe racks and boxes narrow the escape routehouse rules, create alternative storage areas

Which of these points are actually required depends on the building – year of construction, number of storeys, use and whether official proceedings are under way. We clarify this with the specialist firms before the works begin, rather than opening things up again afterwards. Because this is precisely the point at which an otherwise successful renovation becomes expensive: if the fire doors are replaced after the painting, every reveal turns into a construction site again.

The surfaces: why stairwells are painted differently

Wall paint in a stairwell has to do three things at once: withstand wear and tear, let the substrate breathe and be easy to clean. These three requirements partly contradict one another, and that is where the usual two-part division comes from.

AreaRequirementSuitable finishWhy not otherwise
Upper wall area and ceilingbreathable, opaqueemulsion or silicate painta dense coating damages the lime plaster
Dado up to about 1.5 mwashable, impact-resistanthard-wearing dado coating or gloss paintordinary wall paint does not stand up to shoes and wheels
Damp areas on the ground floorsalt-tolerantrenovation plaster with breathable paintemulsion paint seals the surface, the plaster flakes off
Metal railingcorrosion protectionrust removal, primer, top coatpaint without primer peels within a year
Wooden handrailfeel, abrasionsanding, oiling or varnishinga thick coat of varnish becomes slippery and cracks

The most common mistake concerns the ground-floor area: in a Gründerzeit building there is almost always moisture at the base of the wall there, because there is no horizontal damp-proof course. If it is painted over with emulsion paint, salts bloom through the plaster again within one heating season. The right approach is to establish the cause first and build up the dado with renovation plaster – see wall damp-proofing.

Steps: repair, re-cover or replace

Viennese staircases are usually made of artificial stone, less often of natural stone or wood. Worn step edges are not just unsightly, they are a fall hazard – and therefore a liability issue for the owners' association.

ConditionMeasurePrice per stepDurability
edges slightly worn, surface dullrebuild and grind80–220 €10–20 years
edges badly chippedadd an edge profile or re-cover the step180–450 €15–25 years
step cracked or loosereplace the step, check the bearingdepending on findingspermanent
Worn wooden staircasesanding, adding nosings120–300 €10–15 years

Why are steps usually repaired rather than replaced? Because in old buildings the steps are load-bearing components that are built into the stringer wall or rest on supports. Replacing them means intervening in the structure, temporary safeguarding and usually a structural assessment as well. Repairing the surface achieves the same level of safety at a fraction of the cost – as long as the step itself is intact.

Resolution, reserve fund and billing

In a condominium, the renovation of a common part is paid from the reserve fund, and the owners pass a resolution on it. For the property management, it is therefore not only the price that matters but also the form of the offer.

What is neededWhat for
Bill of quantities with quantitiescomparability of several offers, basis for the resolution
Separation of maintenance and improvementdifferent allocation and resolution requirements
Schedule with sectionsinforming residents, planning withdrawals from the reserve fund
Before-and-after photo documentationevidence for the owners, basis for any queries
Rules on variationsclear that additional work is only done after written approval

What saves the most time in practice: when the offer is already structured so that it can be taken over into the draft resolution without reworking. That is exactly how we deliver it – not as a marketing brochure, but as a verifiable schedule of works.

The process in an occupied building

The basic rule is: the way to each flat's front door must be passable at all times, for every resident, at any time of day. Everything else is subordinate to that.

1 · NoticeA notice is posted two weeks in advance with the schedule, a contact person and a note on noisy work. People who are informed complain less often.
2 · ProtectionFlat doors, floors, handrails and letterboxes are covered. The protection stays in place for the entire construction period, not just on working days.
3 · From top to bottomWorking downwards storey by storey, so that dust and materials are not carried over finished areas.
4 · Working one half at a timeWhere possible, one half of the landing is kept clear so that nobody has to walk over fresh paint.
5 · Low-odour materialsWater-based paints and varnishes, ventilation via the stairwell windows. Solvent-based products only where technically necessary, and then at off-peak times.
6 · Handover with the property managementReport, before-and-after photos, breakdown separated into maintenance and improvement.

Two points are regularly underestimated in offers. First, the time lost by keeping areas clear: a surface is done in two passes instead of one. Second, drying times: a dado coating over which prams are pushed the same evening will not last. That is why we plan sections so that drying and use do not get in each other's way.

What should be clarified before the renovation

TopicWhy nowConsequence if it is missing
Age and condition of the risersusually run through the stairwellfreshly finished wall is opened up again for the riser replacement
Electrical cables and distribution boardsold cables are embedded in the plasterchases cut through the new paintwork
Fire doorsreplacement affects the reveal and the wallrework on freshly painted surfaces
Planned lift installationchanges the stairwell void or the courtyardparts of the renovation become redundant
Damp at dado levelthe cause must be remedied before plasteringplaster flakes off within one heating season
Resolution and financingreserve fund, majority, timingdelay after the contract has been awarded
Listed building or protected zonehistoric elements, terrazzo, stuccoremoving the wrong thing cannot be undone
The right sequence is always: service lines first, then doors and building services, then surfaces. Anyone who works in the reverse order pays for the surfaces twice – and in a stairwell with 700 square metres of wall area that is no trifle, but a five-figure sum.

Historic fabric: what should be preserved

In Gründerzeit buildings, the stairwell often contains more historic fabric than is visible at first glance – under layers of paint, behind cladding or beneath PVC flooring.

ElementWhy it is valuableHow we handle it
Terrazzo floordurable, distinctive, almost irreplaceablegrind and impregnate instead of covering over
Wrought-iron railingdefines the building, elaborate craftsmanshipremove rust and paint, re-forge missing parts
Stucco mouldings and cornicespart of the building's appearanceclean, complete, do not fill over
Panelled doorssolid wood, repairablerefurbish, keep the original fittings
Leaded and ornamental glass windowshistoric, often one-offsrestore professionally, do not replace
Stencilled wall patterns and original colour schemesoriginal designcarry out a survey before painting over

In old buildings, a simple test is worthwhile before the first coat: the layers are exposed at an inconspicuous spot. If a historic colour scheme appears underneath, you can decide whether to take it up again. This costs little and is the only opportunity – once everything has been painted over, the information is lost.

Accessibility and lifts

Many tenement buildings have no lift, and the stairwell is the place where that could change. Two approaches are common: installation in the stairwell void, or in the courtyard with connections to the landings. Both change the stairwell considerably and affect the structure, escape routes and fire protection.

OptionAdvantageDisadvantageOrder of magnitude
Lift in the stairwell voidno loss of space in the courtyard, short distancesstairwell void often too small, the railing has to go85.000–160.000 €
Lift in the courtyardmore space, access at half-landing level possibleintervention in the courtyard, longer distances110.000–180.000 €
Ramp in the entrance areainexpensive, creates step-free accessonly solves the ground floor4.000–18.000 €

Anyone planning a lift should combine the stairwell renovation with it, or at least schedule the renovation afterwards. Otherwise a freshly renovated stairwell will be opened up again for the installation – the same logic as with the service lines.

The most common mistakes

MistakeWhy it happensWhat it costs
Painting before the riser replacementvisible results firstwall is chased open, patching remains visible
Emulsion paint on a damp dadofaster and cheaperplaster flakes off after one heating season
Dado coating without drying timetime pressure, residents want to get throughabrasion within weeks, rework
Painting the railing without removing rustprimer seems dispensablerust bleeds through, a new coat is needed
Covering terrazzo instead of grinding ita new floor covering seems simplerirretrievable loss, lower property value
Fire protection after the paintingseen as a separate issuereveals and walls damaged again
No protection for the flat doorssaves materialpaint splashes on doors, complaints
No notice for the residentsconsidered unnecessarycomplaints, obstruction, construction delays

When you do not need us

If the only work is repainting and neither steps nor doors, service lines nor fire protection are affected, a painting firm is enough, and that is then cheaper. A coordinating construction company pays off as soon as plaster, steps, electrics and fire protection come together – or when the property management needs a verifiable breakdown for the resolution and the reserve fund.

How costs differ by type of building

Two stairwells with the same number of storeys can differ in price by a factor of two. The reasons almost never lie in the floor area alone, but in height, fittings and accessibility.

Building typeTypical featuresCost driversGuide value per storey
Gründerzeit tenement buildinghigh ceilings, stucco, terrazzo, box-type double windowsceiling height, scaffolding effort, historic details6.000–14.000 €
Interwar buildingplainer, lower ceilings, robust surfacesusually lower, often just painting and steps4.000–8.000 €
Post-war buildingconcrete, straight flights, little ornamentationlighting and fire protection rather than craftsmanship3.500–7.000 €
Residential complex with several staircasesidentical geometry, high repetitioneconomies of scale lower the price per staircase3.000–6.000 €

The single biggest factor in a Gründerzeit building is the ceiling height. With a clear height of four metres, every wall surface becomes scaffold work, and the same square metre costs many times what it costs in a post-war building with 2.50 metres. This also explains why flat-rate prices per storey without a site visit say little – the height is not stated in any property listing.

Safety: the four points that count

A stairwell is not living space but a circulation route. Safety defects here are not a matter of taste, but questions of liability for owners and the property management.

  • Step edges. Worn, chipped or unevenly high steps are the most common cause of falls. Rebuilding and grinding costs less than a single liability case.
  • Handrail. It must be continuously graspable and firmly anchored. Interruptions at landings and loose fixings are typical defects in old buildings.
  • Lighting. Light has to be where people walk, and it has to come on immediately when they enter. Motion sensors on each level solve this more reliably than a timer switch that goes off halfway up.
  • Slip resistance. Freshly ground terrazzo and varnished wooden steps can be slippery. A suitable after-treatment or an anti-slip nosing at the edge prevents this.

These points belong in every offer, even if they make no visual impression. They are the part of the renovation that counts in an emergency – and the part that is most expensive to retrofit afterwards.

After the renovation: how the result lasts

After five years, a freshly renovated stairwell looks very different depending on what happens afterwards. Three things decide this.

TopicEffectRecommendation
Cleaningdust and road salt attack surfacesregular stairwell cleaning, more often in winter
Dado areashoes, bicycles and furniture removals take their tollhard-wearing coating, annual visual inspection
Damp on the ground floorreturns if the cause remainsdamp-proofing before the renovation, not afterwards
Minor damagebecomes major damage if left unattendedrepairs as part of ongoing building care

Experience shows that properly executed painting in a stairwell lasts eight to fifteen years, the dado area five to ten, and repaired steps ten to twenty-five. Anyone who increases rather than reduces cleaning after the renovation extends these periods noticeably – and that is exactly where the cheapest lever in the entire life cycle lies.

How to recognise a reliable offer

Offers for stairwells vary widely, because the scope of ancillary work is rarely put out to tender. These points make a comparison possible:

  • Wall areas with quantities rather than “stairwell, lump sum”. Only the figure in square metres makes two offers comparable.
  • Protective measures as a separate item. Anyone who does not list them will charge for them later or not carry them out at all.
  • Scaffolding or mobile tower named. In tall Gründerzeit stairwells this is a significant amount that is often missing.
  • Dado area priced separately. A different paint, a different price – if it is not included, the same paint goes on at the top and the bottom.
  • Steps at a unit price. This lets you decide how many are repaired without changing the entire offer.
  • Section-by-section working guaranteed. Otherwise, if in doubt, half a staircase is closed off for days.
  • Separation of maintenance and improvement. For the property management, the most important line in the whole document.

An offer that includes all of this looks more extensive and, at first glance, more expensive. In the final account it is almost always the cheaper one, because the items it lists turn up as variations with the other contractor.

What you get at the end

  • Acceptance report under ÖNORM B 2110 with snagging list and deadlines.
  • Photo documentation before and after the works, storey by storey.
  • Breakdown separated into maintenance and improvement, usable directly for billing.
  • Certificates from the specialist firms for electrical and fire protection work.
  • Materials list with colour shades and products – important for later touch-ups, so that nothing has to be re-mixed.

The last point sounds trivial and in practice saves the most: if the colour shade has been documented, a damaged spot can be touched up three years later without repainting the whole wall.

From the first conversation to the handover

For common parts, the path from the idea to the start of works usually takes longer than the construction period itself. This is not down to the tradespeople, but to resolutions, reserve funds and coordination. Anyone who knows the process can plan realistically.

StepWhoTypical durationWhat is decided
Survey and site visitproperty management with us1 weekscope, condition, the service line question
Bill of quantities and offerus2 working daysquantities, prices, schedule
Obtaining comparative offersproperty management2–4 weekscomparability on the basis of the bill of quantities
Owners' resolutionowners' association2–8 weeksscope, financing, timing
Contract award and schedulingproperty management1 weekstart of works, sections, notice
Executionus3–12 weekssections, protection, access
Handover and final accountjointly1 weekreport, defects, retentions

In practice, this means that anyone who wants the renovation done in autumn should start the survey in spring. And anyone who obtains comparative offers on the basis of a common bill of quantities shortens the entire process considerably – because the offers are then genuinely comparable and the discussion at the owners' meeting is shorter.

Special case: renovation after damage

Not every stairwell renovation is planned. After water damage from a burst riser, after a fire or after damage from a break-in, other questions arise: drying, insurance cover and speed.

Type of damageSequenceSpecial feature
Water damage from a riserrepair the pipe, dry out, measure, then renovatedrying takes time, plaster only afterwards
Fire damageremove soot, neutralise odours, then rebuildsoot penetrates deeply, painting over is not enough
Moisture damage from outsiderepair the facade or gutter, then the interiorwithout eliminating the cause, the damage returns
Vandalismdocumentation, police report, then repairphotos for the insurer before cleaning

In all four cases, the same principle applies as for a planned renovation, only under time pressure: first the cause, then drying, then the surface. Anyone who cuts this process short will have the damage back within a few months – and then usually without insurance cover, because the work was not carried out properly. For water damage, we provide the documentation in the form insurers usually require: photos, drying measurement reports and an itemised breakdown.

What a renovated stairwell brings economically

The stairwell generates no rent, and yet it has an economic effect on three levels. This is the argument that is usually missing at owners' meetings.

LevelEffectTiming
LettingThe first impression is formed before the front door of the flat. Prospective tenants judge the property management and the condition of the building by the common areas.with every new letting
Building fabricPlaster damage, damp and loose steps become more expensive over time, not cheaper.continuously
LiabilityWorn steps, loose handrails and failed lighting are risks borne by the owners' association.in the event of a claim
SaleA well-kept stairwell signals a well-kept property – the impression is formed in the first thirty seconds.on disposal

This overview leads to a simple recommendation: the renovation should not wait until the condition bothers someone, but should be planned into the maintenance cycle. Anyone who renews the paintwork every ten to twelve years and keeps the steps in repair on an ongoing basis pays less overall than someone who waits thirty years and then has to renovate plaster, steps and railings all at once.

Communication with residents

The most common cause of conflict on this kind of site is not noise but a lack of information. What has proven effective:

  • A notice two weeks in advance with the period, sections, contact person and the site management's telephone number.
  • A weekly plan on the ground floor showing which storey is being worked on when – so everyone knows when it affects them.
  • Wet paint signs directly on site, not just in the notice.
  • Fixed times for noisy work, outside the quiet hours and, where possible, in the morning.
  • One contact person instead of changing crews – this significantly reduces the number of queries to the property management.

These measures cost almost nothing and prevent the majority of complaints that would otherwise end up with the property management. For us they are standard, not an extra.

What is usually done around the stairwell at the same time

A stairwell does not end at the last step. If work is being done anyway, adjacent areas can be included with little extra effort – above all those that would otherwise require their own protection, scaffolding and travel.

AreaTypical conditionAdditional effortWhy it makes sense to combine
Building entrance and vestibuleworn door, weathered plinth2.500–12.000 €shapes the impression more than any other area
Stairs down to the basementdamp, dark, plaster damage1.500–6.000 €same trades, same materials
Bin roomodour, damaged surfaces1.200–4.500 €a washable coating quickly pays for itself
Bicycle room or pram storage areaoften improvised2.000–8.000 €takes pressure off the escape route in the stairwell
Passage to the courtyardplaster damage, vaulting, lighting3.000–15.000 €one scaffold, two results
Letterboxes and doorbell panelfaulty, unlabelled1.500–6.000 €wall opening already there

The fourth point in particular is underestimated: anyone who creates a proper storage area for prams and bicycles permanently solves the problem of blocked escape routes. That is cheaper than any discussion about the house rules and lasts longer than a notice.

When a phased solution pays off

If the reserve fund is limited, there is no need to wait for the full package of works. Sensibly divided phases take effect sooner and do not get in each other's way – provided the sequence is right.

PhaseContentWhy in this order
First phaseclarify service lines and fire protection, remedy safety defectsconcerns building fabric and liability, not appearance
Second phaseGround floor and entrance areagreatest effect per euro spent
Third phaseupper storeys, painting and stepseven wear, easy to plan
Fourth phaseancillary rooms, basement, bin roomcan be done afterwards without scaffolding

What does not work: painting the ground floor before the damp at the base of the wall has been dealt with, or bringing the painting forward even though the riser replacement is due in two years. Both scenarios are common, and both mean paying for the phase a second time.

Building entrance, front door and intercom: the first few metres

Anyone renovating a stairwell thinks of walls and steps first. But the impression a building makes is formed before that – at the front door, in the vestibule and at the doorbell panel. In many Gründerzeit buildings the door is made of wood, heavy, often with a fanlight and original fittings. Preserving it is usually worthwhile: stripping, replacing damaged parts, renewing the lock and door closer, repainting. Replacing it with an industrial door almost always looks out of place in a historic carriage entrance and is a delicate matter in a protected zone anyway.

Technically, the entrance often brings the greatest improvement per euro. A working door closer prevents the door from standing open and letting cold, dirt and strangers into the building. A new intercom, with video if desired, is best coordinated with the painting, because cables have to be run in the wall for it. Anyone who leaves this work until the end opens up freshly painted surfaces a second time. The electrical work for it is carried out by licensed partners; coordination lies with us – more on this under electrical work.

Season and drying in a cold stairwell

A stairwell is usually unheated. In winter, the temperature at external walls and on the ground floor is often only a few degrees above the outside air. That is a problem for painting and filling work: according to the manufacturers, most paints and fillers need at least around +5 °C in the air and on the substrate, otherwise they do not cure properly and remain vulnerable. On top of that comes moisture from shoes and umbrellas, which dries only slowly in the cold air.

That is why the period from spring to autumn is ideal for the large surfaces. In winter, work that is less sensitive to temperature can be done: electrical installations, fire doors, refurbishing railings in the workshop, repairing steps. If painting has to be done in the colder half of the year, site heaters help, along with a plan that deals with the upper, warmer storeys first. For property management companies, this results in a simple rhythm: resolution and tender in winter, works from spring onwards.

Surfaces for heavily used buildings

In buildings with many flats, prams and bicycles, an ordinary coat of paint in the lower wall area does not last long. A two-part solution has proven itself: at the bottom a hard-wearing, washable dado up to about chest height, at the top a breathable paint. Where scribbling or graffiti become an issue, a protective coating in the entrance area can make sense, from which paint can be removed more easily. Which paint systems suit which purpose is explained on the page about painting work.

Frequently asked questions about stairwell renovation in Vienna

How often should a stairwell be renovated?
Painting every eight to fifteen years, the dado area every five to ten, steps as required. Anyone who sticks to the cycle pays less overall than if they wait thirty years and then have everything done at once.
What does it cost with several staircases?
Less per staircase than for a single one, because set-up time, travel, protective measures and materials are shared. In the example with eight storeys and two staircases, it came to around €55,500 for both together.
How much does ceiling height affect the price?
A great deal. With a clear height of four metres, every surface becomes scaffold work. The same square metre costs considerably more in a Gründerzeit building than in a post-war building – which is why flat-rate prices per storey without a site visit say little.
What happens after water damage in the stairwell?
First the pipe is repaired, then the area is dried and measured, and only then renovated. We document everything with photos and measurement reports in the form that insurers usually require.
Can cleaning after the renovation be commissioned at the same time?
Yes, as a one-off after the works or on an ongoing basis. Regular cleaning is the cheapest lever for preserving the result for a long time – especially in winter, when road salt attacks the surfaces.
How long does the result last?
Painting eight to fifteen years, the dado area five to ten, repaired steps ten to twenty-five. What matters is cleaning, wear and whether the damp on the ground floor was dealt with beforehand.
How much does a stairwell renovation cost?
In a tenement building with four to five storeys, usually €25,000 to €90,000 net. A refresh comes to €25,000 to €40,000, a repair including steps and lighting around €44,600 in the example, and a complete renovation with doors and service lines up to €90,000.
What does the price depend on most?
On the wall area, the condition of the plaster and whether steps, doors and service lines are included. With two staircases in one building, the price per staircase falls, because set-up time and protective measures are shared.
Who pays for the stairwell renovation?
The stairwell is a common part of the building. In a tenement building the owner bears the maintenance; in a condominium it is the owners' association, out of the reserve fund. We separate maintenance and improvement in the breakdown so that the allocation is transparent.
Can residents stay in the building during the works?
Yes. We work storey by storey and keep one half of the landing clear, so that access to all flats remains possible at all times. We use low-odour, water-based materials.
How long does the renovation take?
A refresh three to five weeks, a repair five to eight, a complete renovation eight to twelve weeks for a five-storey building. With two staircases this does not increase proportionally, because work can be carried out in parallel.
Why should the riser replacement be done first?
Because in Vienna's old buildings the risers almost always run through the stairwell. If they are replaced after the painting, the fresh wall is chased open and the patching remains visible. Details on the page riser replacement.
Do the fire doors have to be replaced?
Yes, if they do not meet the required class, are damaged or no longer close tightly. This has to be done before the painting, because the replacement affects the reveal and the wall. Which class is required depends on the building.
What are the rules for prams and shoe racks in the stairwell?
The escape route must remain clear. Stored items narrow it and increase the fire load. It makes sense to create a storage area as part of the renovation – otherwise the problem comes back.
Which paint is suitable for a stairwell?
At the top, breathable emulsion or silicate paint; in the dado area up to about 1.5 m, a washable, hard-wearing coating. In the damp ground-floor area, renovation plaster first, otherwise the paint will flake off again.
What happens to worn steps?
Artificial stone steps can be rebuilt and ground, at €80 to €220 per step. Badly damaged ones are re-covered, at €180 to €450. Worn edges are a fall and liability risk and should not be put off.
Can a terrazzo floor be preserved?
Almost always. Terrazzo can be ground and impregnated, and afterwards it looks better than any new floor covering. Covering it over is a loss that cannot be reversed.
What about the wrought-iron railing?
Remove the rust, prime, paint – missing parts can be re-forged. €45 to €110 per linear metre. Paint without primer peels within a year, which is why the preparation is decisive.
Is there any funding?
Rarely as a stand-alone measure. As part of a basic building refurbishment (Sockelsanierung) via the Vienna Housing Fund (wohnfonds_wien), work on common parts can be co-funded. What matters is that the application is submitted before the contract is awarded.
How is the resolution prepared?
With a verifiable bill of quantities, including quantities and separated into maintenance and improvement, plus a schedule. That way it can be taken over into the draft resolution without reworking.
Who carries out electrical and fire protection work?
Electrical work is done by licensed electrical engineering firms, fire doors and fire stopping by authorised specialist firms – both named in the offer. We take care of painting, plastering, steps and coordination.
Is the lighting renewed as well?
On request. Light fittings with motion sensors on each level are standard, at €450 to €1,200 per storey. This reduces electricity consumption and increases safety, because there is light wherever someone is walking.
What about smoke ventilation?
In the event of fire, smoke must be able to escape upwards. Whether this happens via a window, an opening or a triggered vent, and whether an upgrade is needed, we check with the specialist firm before the works begin.
Can the flat doors be included?
The outer face usually belongs to the common parts and can be painted at the same time. If they are replaced, it has to be clarified who pays – this is set out in the condominium agreement or in the resolution.
How is the building protected during the works?
Flat doors, floors, handrails and letterboxes are covered, and for the entire construction period, not just on working days. This is shown as a separate item in the offer.
What happens with a listed building or a protected zone?
Historic elements – terrazzo, stucco, leaded glass, colour schemes – are surveyed before the works. Whatever is to be preserved is secured rather than painted over. This is the only opportunity to make that decision.
Is it worth planning the lift at the same time?
Yes, if a lift is on the horizon. Installation in the stairwell void or in the courtyard changes the stairwell considerably. Otherwise, the freshly renovated stairwell will be opened up again for the installation.
How do you deal with variations?
We stop, document with photos and submit a variation offer. Work only continues after written approval. In a stairwell, variations are mainly possible where plaster damage is hidden behind old paintwork.
What happens if damp turns up under the plaster?
Then the cause is established first: rising damp, a faulty pipe or condensation. Without eliminating the cause, no plaster and no paint will hold, and after a year the surface looks the same as before.
Do residents get a contact person?
Yes, with name and contact details on the notice. In practice this prevents most complaints – they almost always arise where nobody knows whom to ask.
Do you also do individual sections?
Yes. If the reserve fund is limited, the renovation can be done in phases, for example the ground floor and first floor first. It is important that service lines and doors have been clarified beforehand, otherwise the same thing happens in every phase.
How is billing handled with the owners' association?
According to the bill of quantities with quantities, separated into maintenance and improvement, on the basis of ÖNORM B 2110 with a handover report and retentions. The breakdown can be taken over directly into the building's service charge account.
How quickly will I get an offer?
Site visit within five working days anywhere in Vienna, offer within two working days after that – as a verifiable bill of quantities, not as a lump sum.
Should the old front door be kept during a stairwell renovation?
If it is made of wood and in usable condition, usually yes. Stripping, repairs, a new door closer, a new lock and paint make it draught-proof and attractive again. A historic door suits the carriage entrance and is the obvious solution in a protected zone anyway. Replacement is mainly worthwhile for badly warped or rotten doors.
Can a stairwell be renovated in winter?
Partly. Painting and filling usually need at least around +5 °C in the air and on the wall, which is often not the case in an unheated stairwell in winter. Electrical work, fire doors, railings and step repairs, on the other hand, can easily be done in winter. The large surfaces are ideally done between spring and autumn.
When should the intercom be renewed?
Before the painting, not afterwards. For a new system, especially one with video, cables are run or renewed in the wall. If this happens after painting, fresh surfaces have to be opened up again and patched. In the schedule, it therefore belongs among the installations that are finished before the surfaces.

Related services

◆ Partner company · Bling Premium Reinigung

Stairwell freshly done? Regular cleaning keeps it that way.

After the renovation, our partner company Bling Premium Reinigung takes over the stairwell cleaning – as a one-off after the works or on an ongoing basis for the property management. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: stairwell renovation in Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your stairwell renovation in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title „Baumeister“ (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.