Services Skyline Bau every trade, every price, on one page.

Skyline Bau services in Vienna: from the contractor that does the work — not from a broker.

From 12 euros per square metre for painting to 2,500 euros per square metre for a full strip-back renovation. Around sixty services, each with a price range and its own detail page, sorted by area. One contract, one site manager, a fixed price under ÖNORM B 2110.

Skyline Bau covers around sixty construction services in Vienna, from €12 per square metre for painting to €2,500 per square metre for a full strip-back renovation. This page lists them all with price range and typical use, sorted into renovation, damage, building envelope, interior fit-out, demolition and shell construction, outdoor works and project delivery. Demolition, drywall, screed, tiling, painting and insulation are carried out by our own people; master builder work, structural engineering, electrical work and gas and plumbing are handled by licensed partner firms, named in the quotation.
✓ One contract for every trade✓ Fixed price after measurement✓ Partner firms named✓ Photo record before anything is closed up✓ 3-year warranty

All services with prices

Guide prices net, as of 2026, binding after a site visit. Each row leads to the detail page with cost table, process and the most frequently asked questions.

Renovating existing buildings

ServicePrice netWhen it is an option
Renovation Vienna900–1.800 €/m²Flat works, but is outdated
Flat renovation900–1.800 €/m²New pipework, wiring, bathroom and floors
Old building renovation900–1.800 €/m²Gründerzeit building stock with fabric worth preserving
Full strip-back renovation1.500–2.500 €/m²Stripped back to the structure, layout changes
General refurbishment1.200–2.200 €/m²all trades in a single run
Tenement building renovation€1,500–3,000/m² usable floor areawhole building; base renovation while occupied 1,500–2,000, full renovation 2,000–3,000
Base renovation (Sockelsanierung)after subsidysubsidised through the Vienna Housing Fund (wohnfonds_wien)
House renovation900–2.400 €/m²detached house, incl. roof and building services
Interior renovation250–1.900 €/m²inside only, the envelope stays
Complete renovation900–1.800 €/m²all trades, without stripping back to the structure
Accessible bathroom5.500–28.000 €bath out, level-access shower, with City of Vienna subsidy
Stairwell renovation25.000–90.000 €stairwell in a tenement building, while occupied
Flat refurbishment60–350 €/m²after a change of tenant, for property managers and landlords
Renovating a Gründerzeit building1.500–3.000 €/m²building from 1848–1918: timber beam ceilings, stucco, box windows
Skyline Bau services in Vienna: costs 2026 – net price overview
Skyline Bau services in Vienna: the prices from the table at a glance, as of 2026, net.

Damage and damp

ServicePrice netWhen it is an option
Water damage restoration1.800–45.000 €burst pipe, sewage backflow, water ingress
Mould remediation380–9.000 €growth on walls or ceilings
Wall damp-proofing€180–700/linear mrising damp, salt efflorescence
Basement renovation150–400 €/m²damp or unusable basement
Masonry repair65–450 €/m²damaged masonry, cracks
Fire damage restoration€18–45/m² for sootafter a fire – first measures, cleaning, odour, rebuilding
Foundation underpinning€900–2,800/linear msettlement, cracks, before adding a storey
Underground car park renovation90–280 €/m²chloride damage, waterproofing, coating

Envelope: roof, facade, insulation

ServicePrice netWhen it is an option
Roof renovation180–320 €/m²leaking or old roof
Facade renovation180–350 €/m²render damage, stucco, appearance
ETICS, external wall insulation120–190 €/m²external insulation as a complete system
Facade insulation120–420 €/m²choosing between external, internal and ventilated
Insulation, overview35–240 €/m²which building element first
Loft insulation35–70 €/m²the cheapest insulation measure of all
Basement ceiling insulation40–150 €/m²cold floors on the ground floor
Energy-efficiency renovation5.000–100.000 €with energy performance certificate and subsidy
Windows and doors€750–1,800/pc.replacing or restoring box windows
Chimney renovation€1,800–9,500 per fluechimney head, sooting damage, flue gas routing

Interior fit-out and trades

ServicePrice netWhen it is an option
Interior fit-out350–900 €/m²from bare shell to finished living space
Drywall40–120 €/m²walls, ceilings, wall linings
Screed laying45–80 €/m²wet, self-levelling or dry screed
Tiling55–110 €/m²bathroom, kitchen, large format, natural stone
Painting work12–28 €/m²paintwork, skimming, stucco
Floor renovation45–340 €/m²substrate, build-up, floor covering
Underfloor heating70–190 €/m²in old buildings too, with a dry system
Bathroom renovation9.800–32.000 €complete bathroom, with waterproofing
Kitchen renovation2.200–24.000 €pipework, connections, surfaces
Electrical work9.500–18.000 €through a licensed partner firm
Heating, air conditioning, ventilation, plumbing€6,500–14,000 per flatthrough licensed partner firms
Timber beam ceiling repair120–450 €/m²ceiling bounces, beam ends damaged, impact sound
Converting commercial premises350–1.500 €/m²shop, office, medical practice or restaurant
Industrial floor repair180–650 €/m²broken areas in commercial and warehouse floors, recast in concrete

Accessible and age-friendly

Staying at home for longer, staying safe at home: thresholds removed, a level-access bathroom, stairs you can manage. What your flat actually needs we clarify at the site visit – and we help prepare the City of Vienna subsidy paperwork.

ServicePrice netWhen it is an option
Age-friendly conversionusually €10,000–20,000bathroom, thresholds, doors, lighting, stairwell – a flat for later life
Stairlift, platform lift & rampseat lift €4,000–18,000when the stairs become an obstacle – lift or ramp compared
Accessible bathroom5.500–28.000 €level-access shower, ÖNORM B 1600, with subsidy
Installing a lift150.000–400.000 €retrofit in a tenement building, in the stairwell void or as a courtyard extension

Demolition, shell construction, extension

ServicePrice netWhen it is an option
Demolition60–140 €/m²partial or complete demolition with documentation
Strip-out45–180 €/m²back to the bare shell
House clearance & removals45–85 €/m²flats, basements, deceased estates – cleared, disposed of, swept clean
Core drilling & concrete cutting€140–450 per holeopenings for air conditioning, ventilation, water and electrics – for specialist firms too
Building drying€18–45 per unit per dayafter water damage – measurement, drying, final moisture test with report
Condition survey€450–6,500 per propertybefore neighbouring building works – condition survey, crack log, monitoring points
Small repairs€68–92/hrongoing needs – framework agreement for property managers, grouped appointments
Demolition work45–180 €/m²buildings or parts of buildings
Shell construction950–1.500 €/m²new build up to a weathertight envelope
New build2.400–3.600 €/m²turnkey
Loft conversion3.000–4.000 €/m²new flats in the roof space
Loft conversion800–1.200 €/m²making the roof space usable
Adding a storey€1,800–3,400/m² usable floor areaan additional storey
Extension1.700–2.900 €/m²extension to the existing building
Installing a lift150.000–400.000 €retrofit in an existing building

Outdoor works and civil engineering

ServicePrice netWhen it is an option
Terrace renovation150–320 €/m²waterproofing, falls, surface
Balcony renovation280–650 €/m²concrete, waterproofing, railings
Retaining wall€280–650/linear mslope stabilisation with structural calculations
Garden wall180–750 €/m²boundary walls, privacy screens
Paving85–260 €/m²driveway, courtyard, paths
Asphalt paving45–160 €/m²driveways, car parks, private roads – sub-base and surfacing from a single source
Road construction & site servicingfrom €25/m², with utilities per linear mprivate roads, site servicing, municipal roads – route, utilities, carriageway
Excavation28–180 €/m³excavation pit, trench, removal of spoil
Levelling6–45 €/m²ground levelling, compaction
Foundations€140–420/linear mstrip or raft foundation
Ground slab180–380 €/m²new build, extension, outbuilding
Sewer construction€180–480/linear mconnection, renewal, repair
Pipeline construction€45–140/linear mwater and waste water pipes, riser replacement, underground drainage
Civil engineeringdepending on the projectearthworks, trenches, shoring
Pool construction28.000–120.000 €pool, equipment, surroundings
Riser renovation€25,000–60,000 per riserrising mains in a tenement building
Earthworks8–95 €/m³adjusting ground levels, backfilling, replacing soil

Organisation and project delivery

ServicePrice netWhat lies behind it
Construction company Vienna250–3.600 €/m²every trade, one contract
Building firm Vienna250–2.500 €/m²overview of all services and hourly rates
General contractordepending on the projectexecution and coordination from a single source
Construction managementwithin the fixed price or 8–14%construction schedule, measurement, acceptance inspections
Master builder servicesdepending on the workthrough licensed partner firms, § 94 no. 5 GewO
Work at height€1,400–2,600/dayrope access instead of scaffolding
All prices are guide values subject to a site visit. What actually drives the price in Vienna's old buildings is usually not the floor area but the condition: substrate, damp, the load-bearing capacity of the ceilings, the available build-up height and access to the site. That is why we measure on site rather than estimate over the phone.

What we do ourselves and what partner firms do

Skyline Bau is the brand of the construction and renovation division of Bling Bling GmbH, a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) – not a licensed master builder (konzessionierter Baumeister). We state this distinction openly because it determines who will be standing on your site.

TradeExecutionBasis
Demolition, strip-out, excavationour own peopletrade licence as per GISA
Drywall, screed, tilingour own peopletrade licence as per GISA
painting, floor laying, insulationour own peopletrade licence as per GISA
Site management and coordinationour own peopleYou still have one contractual partner
Master builder services, structural engineering, permit submissionlicensed partner firm§ 94 no. 5 GewO
Electrical engineeringlicensed partner firm§ 94 no. 16 GewO
Gas and plumbinglicensed partner firm§ 94 no. 25 GewO
Roofing, sheet-metal worklicensed partner firmregulated trade
The partner firms are named in the quotation, and you receive proof of their licence before signing the contract. You can check this yourself in the public trade information system GISA – for us and for any other provider. It takes thirty seconds.

Why from a single source

One interface fewer

When trades are contracted separately, problems arise where two trades meet: the screed layer turns up before the electrics are finished. With us, that interface is a matter of internal coordination, not a dispute between two companies.

One construction schedule

Seven firms have seven diaries. If one drops out, everyone after them is pushed back – and nobody is responsible. With one contractual partner, the construction schedule is part of the contract.

One warranty

If the floor lifts, with separate contracts the screed layer and the floor layer argue about whose fault it is. You are caught in the middle. With us there is one contact person responsible for the result.

One price

A fixed price after measurement instead of seven separate quotations, which together are rarely cheaper – but leave the coordination with you.

How a project runs

1 · First contactYou tell us what it is about. We tell you whether it suits us – and if not, who else might be suitable.
2 · Site visit, free of charge throughout ViennaWithin five working days. Measurement, condition of the building fabric, damp, load-bearing capacity, access to the site. The result is a photo report.
3 · Quotation within two working daysBill of quantities with quantities, unit prices, system specifications, construction schedule, payment schedule and explicit exclusions. Regulated trades with a named partner firm.
4 · Permits and subsidies, if neededSubmission through licensed partner firms, subsidy application before the contract is awarded. Anyone who awards the contract first loses their entitlement.
5 · Site set-upDust protection, stairwell protection, skip, parking lane permit from MA 46, notice in the building two weeks in advance.
6 · Execution with site managementOne site manager, reachable every day, a weekly photo report. Variations are approved in writing before the work is done, not billed afterwards.
7 · Documentation before closing upEvery pipe and cable photographed with measurements, waterproofing before tiling, test reports for screed and drying.
8 · Acceptance and handoverJoint inspection, snagging list, acceptance report under ÖNORM B 2110, waste disposal certificates, final clean.

How to recognise a quotation you can check

Items with quantities and unit pricesNo overall lump sum. Only then can two quotations be compared and variations be traced.
System specifications for technical componentsWaterproofing to ÖNORM B 3407, insulation material with lambda value, skim quality, type of screed. "High-quality workmanship" is not a specification.
A line headed "not included"A fixed price without named exclusions is not a fixed price.
Payment schedule by construction progressWith a 3 to 5% retention until acceptance. Advance payments above 30% without security are a warning sign.
Proof of construction liability insuranceFor work in occupied buildings, cover of at least €3 million, policy presented before work begins.
Regulated trades namedWith proof of licence. Anyone who dodges the question probably does not have one.

Who we work for

Private clients

Flat or house, from partial renovation to full strip-back renovation. One contact person instead of seven sets of appointments.

Property managers

Verifiable bills of quantities for owners' resolutions, maintenance and improvement shown separately, weekly photo reports, documentation for invoicing and drawing down subsidies.

Tenement building owners and investors

Renovation while occupied, subsidy handling through the Vienna Housing Fund (wohnfonds_wien), coordination with MA 19 and MA 37.

Developers and general contractors

Subcontracts in drywall, demolition, screed and interior fit-out – on schedule, with our own site management and measurement to ÖNORM.

When you do not need us

For a single trade with no interfaces, a specialist firm is the cheaper choice: if only the floor needs replacing, call a floor layer; if only one room needs painting, call a painter. A coordinating construction company pays off from the point where three or more trades interlock. And if the rising mains in your building are due to be renewed in the foreseeable future, wait with the flat renovation – otherwise the finished work will be opened up again. We tell you this at the site visit, even if it makes the job smaller.

Which service suits your project?

The list above is organised by trade, but most enquiries start with a building and a problem. This short guide helps you find the right page before you write to us.

  • A flat needs to be made new: floors, bathroom, electrics and surfaces in one go, usually in an occupied building. The starting point is renovating a whole flat.
  • A detached house is showing its age: roof, facade, windows, heating and damp in the basement are connected and should be tackled in the right order. That is what house renovation is for.
  • A house is to be built on a plot: from excavation through ground slab and shell to handover, described under building a new house.
  • Damage has occurred: water, mould or fire each have their own procedures, in which the cause comes before the surface.

If your project fits none of these groups, send us a short description with photos anyway. We will tell you whether it suits us and, if not, which specialist firm would be the better choice. Extensive projects involving several trades benefit most from a single contractual partner; individual small jobs often do not.

Frequently asked questions about our services

Which services does Skyline Bau cover?
Around sixty, from loft insulation through drywall, screed, tiling and painting to the full strip-back renovation of entire tenement buildings. The complete list with prices is at the top of this page, sorted into seven areas.
Is Skyline Bau a master builder (Baumeister)?
No. Skyline Bau is the brand of the construction and renovation division of Bling Bling GmbH, a restricted building trade business under § 99 GewO. Master builder work is carried out by licensed partner firms under § 94 no. 5 GewO, which are named in the quotation.
Who is my contractual partner?
The invoicing company behind the Skyline Bau brand, named in the legal notice. You sign one contract, receive one invoice and have one contact person responsible for the result – including the work of the partner firms.
What does "from a single source" mean in practice?
One contract, one construction schedule, one site manager, one warranty. Coordination between the trades lies with us, not with you. That is the difference from contracting trades separately – there you carry every interface yourself.
Which work does Skyline Bau carry out itself?
Demolition, strip-out, excavation, drywall, screed, tiling, painting, floor laying and insulation – within the scope of our trade licences. Plus site management and coordination.
Which work is handled by partner firms?
Master builder work, structural engineering and permit submissions under § 94 no. 5 GewO, electrical engineering under no. 16, gas and plumbing under no. 25, as well as roofing and sheet-metal work. All named in the quotation.
Why may a construction company not do everything itself?
Because the Austrian Trade Regulation Act distinguishes between free and regulated trades. Regulated trades require a licence with proof of qualification. Anyone who claims to do everything themselves is either not telling the truth or working without authorisation.
How do I check a trade licence?
Search for the company name in the public trade information system GISA. It shows which trades are currently registered. That applies to us as much as to any other provider, and it takes thirty seconds.
What does a renovation in Vienna cost?
Refurbishment €250–500/m², complete renovation €900–1,800/m², full strip-back renovation €1,500–2,500/m², tenement building renovation €1,500–2,000/m² usable floor area. The complete price list with all services is at the top.
What does a skilled worker cost per hour?
€58 to €78 net, labourers €44 to €58, foreman or site manager €75 to €105. These rates apply to work charged on a time basis and are stated in the quotation. For clearly defined work, a fixed price is the norm.
Do I get a fixed price?
Yes, after measurement and a site visit, as a bill of quantities under ÖNORM B 2110 with quantities, unit prices, system specifications, construction schedule and explicit exclusions. Without a site visit any figure would be a guess – especially in an old building.
How large are variations usually?
In old buildings, 5 to 12% of the construction sum. Anyone who promises none has either priced them in or will claim them later. What matters is that every variation is approved in writing before the work is done.
What contingency should I budget for?
10 to 15% of the construction sum; for properties without as-built drawings or with suspected hazardous materials, 15 to 20%. That is not a sign of poor planning but the price of the fact that nobody can see through walls.
Do I pay everything at the end or in instalments?
In instalments according to construction progress. Small jobs run with a 60% advance payment and 40% after acceptance.
How quickly do I hear back after an enquiry?
A reply within two working days, a site visit anywhere in Vienna within five working days, and the quotation two working days after that. If several trades are involved it may take longer – we will tell you at the site visit.
Do you also work in occupied properties?
Yes, in tenement buildings that is the norm. Work in sections, dust protection with an airlock, stairwell protection, daily rough cleaning, clear escape routes and notice in the building two weeks in advance.
Do you also take on individual trades?
Yes, for example drywall or screed as a subcontract. For private clients, however, a coordinating construction company only pays off from three interlocking trades – below that a specialist firm is cheaper. We say so openly.
How small can a job be?
That depends on the trade: painting from around 25 m² of wall area, basement ceiling insulation from 40 m², facade work from 100 m². Below that, travel and site set-up weigh disproportionately on the price.
What warranty is there?
Three years on workmanship under § 933 ABGB (Austrian Civil Code). Manufacturers' material warranties are separate and often longer. Both are stated in the quotation.
Is the work insured?
Yes, through construction liability insurance with €3 million cover. We present the policy before work begins.
What if the deadline is not met?
The contract sets out deadlines and the consequences of delay under ÖNORM B 2110. If something is delayed, we tell you as soon as it becomes foreseeable – not on the day of the deadline.
What happens if a crack appears in the neighbouring building?
What matters is the documented condition before construction starts – which is why a condition survey is carried out beforehand. Damage resulting from our work is covered by the construction liability insurance.
Which documents do I receive after completion?
Acceptance report, photos of the concealed work, test reports and the warranty periods for each trade.
Do you take care of permits?
Yes, through licensed partner firms: submission to the building authority (MA 37), coordination with MA 19 in protected zones, parking lane and scaffolding permits through MA 46. Procedures take 4 to 12 weeks, longer in protected zones.
Do you help with subsidies?
Yes, for THEWOSAN, base renovation (Sockelsanierung) through the Vienna Housing Fund (wohnfonds_wien) and the City of Vienna's housing improvement subsidy. Important: the application must be approved before the contract is awarded – anyone who awards the contract first loses the entitlement entirely.
Do you work in all districts?
Yes, in all 23 Viennese districts, with a focus on Gründerzeit buildings. Klosterneuburg and the area surrounding Vienna on request.
Are there references?
Yes, with client, period and original document – among them the renovation of the Parliament building in 1010 Vienna in 2022 as a subcontractor. See references.
Do you work in the evenings and at weekends?
For commercial premises, medical practices and restaurants, yes, so that business does not come to a standstill. This carries a surcharge and is shown in the quotation. In residential buildings we keep to the usual hours: weekdays 7 am to 8 pm for noisy work.
What does the site visit cost?
Nothing, anywhere in Vienna. It takes 45 to 90 minutes, and the result is a photo report with a first cost range. Only if you want a detailed bill of quantities with measurement is there effort involved, which is discussed beforehand.
What if my project is not on the list?
Ask anyway. The list covers the usual cases, not every special one. If it does not suit us, we will say so – and, where possible, name who else might be suitable.
Does Skyline Bau also build new detached houses?
Yes, as a general contractor from earthworks through foundations and shell to interior fit-out. Design and permit submission come from an authorised planner, structural engineering and regulated trades from partner firms. For you it remains one contract with one construction schedule. Details and guide prices are on the new build page.
How can I tell whether my project is a renovation or several individual trades?
As soon as three or more trades interlock, such as demolition, installation and tiling, it is a renovation that needs coordination. A single trade without dependencies, such as painting only, is usually cheaper to award directly to a specialist firm. If in doubt, we clarify this in our first reply.

As many as the project needs — from a single one to a dozen for a full strip-back renovation. That is precisely the point of delivery from a single source: you do not have to mediate between electrician, plumber, tiler and painter yourself.

What is a restricted building trade business?

A trade licence for construction work of a defined scope, without the full rights of a licensed master builder (Baumeister). Regulated activities such as structural engineering or permit planning are reserved for the master builder — which is why we work with licensed partners for them.

How do I contact Skyline Bau?

Via the enquiry form on this page or by phone. For a reliable assessment we arrange a free site visit — only after that is there a sound fixed price. We usually get back to you within a few working days.

What makes Skyline Bau different from a pure brokerage platform?

We are the construction company carrying out the work and your contractual partner, not a platform that merely passes jobs on. General construction work we do with our own people; the regulated trades we coordinate through established partners — with one responsibility for the overall result.

Related services

◆ Partner company · Bling Premium Reinigung

After the build: cleaning from the same source.

Every one of our services ends with the post-construction clean. Our partner company Bling Premium Reinigung takes care of it, timed to the construction schedule. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quotation free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Services Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your project in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted building trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (konzessionierter Baumeister). Under § 99 (5) GewO, the title "Baumeister” (master builder) is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master builder services, structural engineering, gas and plumbing, electrical engineering — are carried out exclusively by authorised, licensed partner firms.