Earthworks Vienna every tonne that stays doesn't go to landfill.

Earthworks Vienna: from the contractor who does the work — not from a broker.

Earthworks Vienna: earthworks in Vienna cost €8 to €95 per cubic metre – depending on whether the soil stays on the plot or is taken away. Cut-and-fill balancing on site €8–18/m³, fill with compaction €25–55/m³, soil replacement €45–95/m³. Landscaping, slope cutting, terracing and topsoil work from a single source.

The biggest cost lever in earthworks is not the excavator but the lorry. Soil that is relocated on the plot – from the slope into the hollow, from the house footprint into the garden – costs €8 to €18 per cubic metre. Removing and disposing of the same soil quickly costs four to six times as much with transport and landfill, because one cubic metre of soil weighs around 1.8 tonnes. That is why every earthworks job starts with a cut-and-fill balance: how much is removed, how much is needed, and what is left over.
✓ Cut-and-fill balance before the quote✓ Compacted in layers with test record✓ Topsoil stored separately✓ Disposal with weighbridge ticket✓ Fixed price under ÖNORM B 2110

Earthworks, excavation or grading?

ServiceWhat it is aboutTypical forDetails
EarthworksReshaping the terrain, relocating, filling and cutting soilSloping plot, garden, terraces, change in ground levelthis page
ExcavationPit for basement, foundation or utility linesNew build, extension, sewerExcavation Vienna
Gradingestablishing final level and bearing capacityPaved area, floor slab, drivewayGrading Vienna
Demolitionremoving existing structures, separating materialsOld structures, outbuildingsDemolition Vienna

If the prepared area is to carry vehicles, we follow on directly with asphalt surfacing or paving.

If the area is to become a drivable road, we also handle the route, utility lines and carriageway: road construction.

Earthworks Vienna: costs 2026

Guide prices net, as of 2026, binding after a site visit and cut-and-fill balance. Access, soil type and whether material must be removed are decisive.

ServiceUnitNet priceWhat is included
Stripping topsoil and stockpiling to the sidem²4–9 €around 20–30 cm, separate from the subsoil
Cut-and-fill balancing on the plotm³8–18 €cut, relocate, place roughly
Fill with compactionm³25–55 €in layers of 20–30 cm, roller or plate compactor
Soil replacementm³45–95 €poor soil out, load-bearing material in
Slope cutting with embankmentm³18–40 €slope angle according to soil type
Garden landscapingm²15–45 €falls, swales, terrain edges
Spreading topsoil backm²5–12 €placing, rough grading
Removal and landfill, uncontaminatedt22–45 €Lorry, landfill fee, weighbridge ticket
Purchasing fill materialt18–35 €Gravel, crushed stone or recycled material, delivered
Compaction testpcs250–550 €Plate load test, record
Mini excavator with operatorDay650–950 €for narrow access and gardens
Crawler excavator with operatorDay950–1.600 €for larger volumes
Earthworks Vienna: costs 2026 – net price overview
Earthworks Vienna: the prices from the table at a glance, as of 2026, net.
Worked example · 650 m² sloping plot, garden in two terraces, 180 m³ of soil moved
Strip topsoil 420 m², stockpile to the side€2,700
Cut-and-fill balance 150 m³ on the plot€2,100
Fill 30 m³ compacted, test record€1,650
Spread topsoil, landscaping€3,800

Total approx. €10,250 net. If the same 180 m³ had to be removed and replaced with purchased material, transport, landfill and material alone would add around €9,000 to €14,000 – which is why the cut-and-fill balance is the most important part of the planning.

How an earthworks job runs

1 · Site visit and level surveyExisting ground levels, access, utility lines, boundaries with neighbours. The basis for the cut-and-fill balance.
2 · Cut-and-fill balanceHow much is cut, how much is filled, what is left over. The aim is to remove and buy in as little as possible.
3 · Clarifying permitsChanges to ground level may require notification or a permit under the Vienna Building Code, especially at the plot boundary. We clarify this before starting.
4 · Securing the topsoilThe top layer is stripped and stored separately. It is the most valuable material for the future garden and must not be mixed with subsoil.
5 · Relocating and compactingFill is placed in layers and each layer is compacted. Under future paths, terraces or walls with a test record.
6 · Topsoiling and handoverTopsoil back, falls established, photo documentation and handover.

The most common mistakes

  • Topsoil and subsoil mixed. The garden then grows poorly for years and the soil becomes compacted.
  • Filled in one go. The fill settles over months, and paths and terraces on top of it sink.
  • Started without a cut-and-fill balance. First hauled away, then material bought back for the hollow – paid for twice.
  • Water forgotten. New falls may direct rain towards the house or the neighbour. The fall must lead away from the building.
  • Fill placed at the plot boundary. Changes in level at the boundary often require a permit and are a classic neighbour dispute.
Filled ground does not become load-bearing by itself. Loose fill settles by several centimetres over months. Where paving, a terrace or a wall is to stand later, it is therefore placed in layers of 20 to 30 cm and each layer is compacted – with a plate load test as proof. For lawns and beds, lighter compaction is enough; there the topsoil matters more than bearing capacity.

The soil decides, not the machine

Every earthworks job starts with the question of what you are dealing with. Viennese soils range from sandy terrace gravel in the north to heavy Tegel clay in the west and south – and the difference shows up in every single item on the bill.

Soil typeBehaviour when excavatedBehaviour when placedCost effect
Sand and graveleasy to loosen, runscompacts well, load-bearinginexpensive, slope must be flatter
Siltmediumsensitive to water, unusable when it rainsweather-dependent
Tegel, clayey soilstiff, sticks to the bucketcompacts poorly, swells and shrinksexpensive, often soil replacement
Made ground, rubble in the subsoilinconsistent, obstructionsnot load-bearingSampling, disposal according to findings
Rock or conglomeratebreaker or rock cutter neededvery load-bearingconsiderably more expensive to excavate
Groundwater in the excavation areaslope slides, formation softensdewatering requiredlargest single item
The most expensive surprise is not rock but water. Rock can be calculated: hours with the breaker, a known day rate, done. Groundwater in the excavation area changes the entire method – dewatering, a watertight pit, uplift protection, condition surveys of neighbouring houses because of the drawdown. That is why larger excavations need a ground investigation, and before the price is negotiated, not afterwards.
InvestigationWhat it providesNet price
Trial pit with the excavatorSoil profile to about 3 m, visual inspection450–1.200 €
Core drilling in the groundLayer sequence, samples from depth€900–2,800 per borehole
Geotechnical reportBearing capacity, foundation recommendation, water level1.800–5.500 €
Chemical sampling of the excavated soilClassification for disposal€280–850 per sample
Plate load testProof of compaction€250–550 per test

Anyone who skips the geotechnical report for a detached house saves a few thousand euros and risks a soil replacement that costs many times more – or a foundation that later gives way. For small landscaping jobs in the garden, on the other hand, skipping it is justifiable: there a trial pit is enough to see what lies beneath the topsoil.

Where the excavated soil goes

On most Viennese sites, removal is the largest item – not the digging. What matters is how the soil is classified.

ClassificationWhat it meansDisposal costs net
Uncontaminated excavated soilnatural ground, no foreign matter€22–45/t
Excavated soil with minor foreign matterbrick fragments, roots, old fill€45–85/t
Contaminated excavated soilhydrocarbons, heavy metals according to findings€95–260/t
Hazardous wasteheavy contaminationconsiderably higher, on quotation
Reuse on the plotcut-and-fill balance instead of removal€8–18/m³
Depending on the soil, one cubic metre of excavated material weighs around 1.6 to 2.0 tonnes – and loosened material takes up more space than it did in the ground. This bulking amounts to 15 to 35 percent depending on soil type. Anyone who calculates cubic metres from the plan and disposes of tonnes underestimates both. For a basement excavation of 180 cubic metres that is around 320 tonnes and about 20 lorry loads – and whether the soil is classified at €30 or €85 per tonne makes a difference of around €17,000.

That is why sampling before starting almost always pays off: it costs a few hundred euros and decides whether the excavated soil counts as uncontaminated. Without test results the landfill will classify it unfavourably if in doubt, and the weighbridge ticket then becomes the most expensive piece of paper on the whole site.

Slope or shoring

As soon as you dig deeper than about one and a half metres, the question is no longer whether the pit will hold but how it is held. In Vienna, the available space usually decides.

MethodWhenSpace requiredCosts
Open slopeenough space, stable soilhigh, the slope needs areacheapest solution
Benchingmedium depth, some spacemediumlow
Soldier pile wall, Berlin-type shoringtight location, no slope possiblelowhigh
Sheet pile wallwater in the ground, soft layerslowhigh, causes heavy vibration
Bored pile walldeep pits, neighbouring buildings directly adjacentlowvery high
Underpinningneighbouring foundation is higher than the formation levellowvery high, in sections
The slope angle is not a matter of discretion. It depends on the soil type, and a cut that is too steep in cohesive soil will hold for days in dry weather – and slide at the first rain. That is why the slope is set before excavation, the edge of the pit is kept clear and no material is stored at the top edge. Where there is not enough space for that, shoring is not the more expensive option but the only one.

If digging takes place right at the plot boundary, a condition survey of the neighbouring building is added. This is not a formality: the pit removes the lateral support of the neighbour's ground, and settlement shows up first as cracks in their house. Without a documented initial condition it is then one person's word against another's.

Water on site

ProblemCauseMeasure
Surface water runs into the pitterrain slopes towards the siteperimeter ditch, bund, drainage away
Formation softensrain and vehicle trafficblinding layer, gravel haul roads
Perched water seeps out of the slopewater-bearing layer in the grounddrainage, gravel soakaway packing
Groundwater above the formation levelhigh water leveldewatering with sump or wells
Neighbouring building settleslowering of the groundwatermonitoring points, condition survey, limit the drawdown

The simplest and most often forgotten measure is the perimeter ditch around the pit. It costs a few hundred euros and prevents surface water from softening the slope from above – the cause of most slope failures on small sites.

Compaction: the part that counts later

PointRuleConsequence of mistakes
Layer thickness20 to 30 cm per layervoids remain, it settles later
Materialcompactable, uniformcohesive soil never becomes load-bearing
Moisturematerial neither bone-dry nor wetsufficient compaction cannot be achieved
Equipmentplate compactor, roller, rammer depending on locationequipment that is too light only compacts the top
Proofplate load test for load-bearing areasno proof, no acceptance
Backfilling the working spacein layers, not tipped in one gosettlement along the basement wall, paving sinks
The most common cause of sunken paving along house walls is the backfill of the working space. If the space between the basement wall and the ground is tipped in one go instead of compacted in layers, the material settles over years – and the terrace or path along the house tilts towards the house. It is then repaired with new paving, which sinks again after two years because the cause lies a metre deeper.

Earthworks before building a house: the sequence

On a new build, the earthworks set the pace of the first weeks. Sticking to the sequence saves waiting times that nobody can make up later.

StepWhat happensWhat is possible afterwards
1. Setting outbuilding and levels by the surveyorbuilding lines are fixed
2. Site setupaccess, storage areas, connectionsmachines can work
3. Topsoil stripping20 to 30 cm, stored separatelysubsoil exposed
4. Excavationpit to plan, slope or shoringformation level reached
5. Checking the formationassessing bearing capacity, soil replacement if neededrelease for the foundation
6. Blinding layerthin layer of concrete on the formationreinforcement can be placed
7. Shell constructionfoundation, basement, waterproofingworking space can be backfilled
8. Backfilling the working spacecompacted in layers, drainage if plannedterrain can be landscaped
9. Landscapingfalls away from the house, connection levelsOutdoor areas
10. Spreading topsoiltopsoil back on the areagarden
The critical point is step five. The formation is assessed before anything is built on it – and if it cannot bear the load, this is the cheapest moment to find out. Soil replacement at this point costs €45 to €95 per cubic metre. The same discovery after the shell is built costs many times more and, in the worst case, means retrospective foundation underpinning.

Between steps seven and eight lie the curing and the waterproofing of the basement wall. Anyone who rushes here and backfills too early damages the fresh waterproofing – and the damage only shows when the basement becomes damp. Everything else about the pit is on the excavation page, and about foundations on the foundations page.

Access, space and choice of machine

In Vienna, earthworks rarely fail because of the volume, but because of access. The machine has to get in and the material out – and both determine the price more than the cubic volume.

AccessPossible machineOutput per dayCost effect
Under 1 m, only through the housemicro excavator or by hand5–15 m³very high, up to three times as much
1 to 2 m, garden gateMini excavator 1.5–2.5 t20–45 m³high
Over 2.5 m, courtyard entranceMidi excavator 5–8 t60–150 m³medium
Clear access, lorry can deliverCrawler excavator from 10 t150–400 m³inexpensive per cubic metre
No access, only via the neighbouring plotsubject to consentdepending on solutionadditional agreement required
The difference between a mini excavator and a crawler excavator is not the day rate but the daily output. A mini excavator costs €650 to €950 a day and handles 20 to 45 cubic metres; a crawler excavator costs €950 to €1,600 and handles five times as much. For 200 cubic metres that means five to ten days of mini excavator versus one and a half days of crawler excavator. That is why it is almost always worth asking whether a wall, a fence panel or a gate can be opened for the duration of the work.
Extra itemWhen it appliesNet price
No-parking zone for lorries and skipsstreet occupation in Vienna€120–380 per day
Ground protection mats for haul roadssoft ground, lawn areas€18–45/m²
Gravelling the site accesslonger construction period€25–60/m²
Street cleaningdirt from site traffic€250–900 per call-out
Tree protectiontrees in the working area€180–600 per tree
Hand digging near utility linescables, pipes, sewer in the area€85–180/m³

The last line is the one most often underestimated. Where utility lines run, machine digging is not allowed – they are located by hand, which is many times slower. Requesting utility information from the operators before starting costs nothing and establishes where this applies.

Utility lines in the ground

StepWhat is doneWhy
Obtaining utility informationplans for electricity, gas, water, sewer, district heating, telecomsmandatory before every excavation
On-site detectioncable locator, determining the routeplans are often inaccurate
Trial trenches by handexposing crossingsconfirms position and depth
Markingmarking routes, setting safety distancesprotects against the excavator bucket
Securing exposed utility linessuspending, wrapping, proppingprevents damage in the trench
Warning tape when backfillinglaid above the lineprotects during future digging
A damaged power cable means an expensive day; a damaged gas pipe means an evacuation. The costs are as a rule borne by the contractor, and not only for the repair but also for the supply outage. The only protection is the sequence of utility information, detection, trial trench and only then the machine – on every dig, even for the small line in your own garden.

Understanding volumes: what's in the calculation

Quotes for earthworks are hard to compare because the same quantity can be stated in three different ways. Knowing the terms lets you see immediately whether two quotes mean the same thing.

TermMeaningConversion
Bank volumevolume in natural ground, as calculated in the planbase value
Loose volumevolume after excavation, as on the lorrybank volume plus 15–35 %
Compacted volumevolume after placing with compactionabout bank volume, less depending on material
Tonneslandfill billing by weighbridge ticket1 m³ bank volume equals around 1.6–2.0 t
Lorry loadtransport unitabout 8–16 t depending on vehicle
A quote in bank volume billed in tonnes always ends up higher than the quote. This is not a trick but physics – what matters is that it is stated in the quote. We therefore show both: the cubic volume from the plan and the expected tonnage based on the assumed bulk density. Then the final invoice can be checked against the weighbridge tickets instead of having to be taken on trust.

For developers and property managers

PointHow we handle it
Preliminary investigationtrial pit or geotechnical report before the quote, not after
Quantity take-offcalculated from the plan, with bulking and tonnage shown
Disposal recordsweighbridge tickets per load, assigned to the site
Neighbourscondition survey before excavation at the plot boundary
Trafficno-parking zones, street cleaning, access times coordinated
Recordscompaction tests, photo documentation of the formation before construction
Interfacehandover to the next trade with a recorded formation

The last point saves the most arguments. If the formation is photographed and its level surveyed before concreting, it is clear later in what condition it was handed over – and who pays for rework if it has softened two weeks later.

How to recognise proper workmanship

FeatureGood workmanshipWarning signs
Before startingutility information, detection, trial trenchesexcavator starts on day one
Quotecubic volume and tonnage, disposal class statedlump sum without quantities
Slopeangle according to soil type, edge clearcut steeply, material at the edge
Waterperimeter ditch, drainage in placepit fills up when it rains
Backfillin layers, visibly compactedtipped in one go
Topsoilstored separately and reusedmixed with subsoil
Disposalweighbridge tickets are handed overno receipts, lump sum
Sitestreet clean, access stabiliseda trail of mud across half the district
Weighbridge tickets are the most honest document on an earthworks site. They show date, quantity, material and landfill – and can be compared with the calculated volume. A company that does not hand them over has either not weighed or is billing something other than what was taken away. We attach them to the final invoice without anyone having to ask.

Price examples from practice

Worked example 1 · Basement excavation for a detached house, 180 m³, good access
Strip topsoil 220 m², stockpiled to the side€1,540
Excavation 180 m³ with crawler excavator, two days€2,800
Removal approx. 320 t, classified as uncontaminated€9,600
Grade the formation, prepare blinding layer€1,250
Perimeter ditch, form slope, keep edge clear€680
Sampling of excavated soil before removal€620

Total approx. €16,490 net, four working days. The largest item is removal – had the soil been classified as containing foreign matter, this item alone would have cost around €19,000.

Worked example 2 · Landscaping a garden and retaining a slope, 340 m²
Slope cut 95 m³, cut-and-fill balance on the plot€2,660
Fill with layer-by-layer compaction, 60 m³€2,400
Landscaping 340 m², falls away from the house€8,500
Spread topsoil 340 m²€2,720
Mini excavator with operator, four days, narrow access€3,200
Removal of surplus 40 t€1,400

Total approx. €20,880 net. Thanks to the cut-and-fill balance, around 95 cubic metres were not hauled away – that equals about 10 lorry loads and around €5,000 saved in disposal costs.

Falls and water management on the plot

With any landscaping, what decides is not the look but where the water runs. Most moisture damage to basement walls is not due to missing waterproofing but to ground that slopes towards the house.

RuleGuide valueWhy
Fall away from the houseabout 2 % over the first metressurface water runs off instead of against the wall
Clearance between ground and waterproofingplinth stays visible, not buriedsplash water and moisture ingress
Drip stripgravel or paving with a fallspreads drip water, keeps the plinth dry
Hollows and depressionsno closed low pointsstanding water seeps in
Interface with neighbouring plotno water directed onto someone else's landneighbour law, avoidable dispute
Infiltrationaccording to soil and regulationsthe sewer may not be loaded at will
Two percent fall is two centimetres per metre – small enough that you don't see it, and enough for water to run off. Anyone who lays the area flat because it looks calmer gets a puddle against the basement wall after the first heavy rain. This shaping costs almost nothing during excavation and can later only be corrected with a separate construction job.

What you can prepare

  • Know the plot boundaries: current plan or survey, especially when working close to the boundary.
  • Obtain utility information: from all operators, including for your own supply line in the garden.
  • Clarify access: width, height, load capacity, whether a fence panel or gate can be opened.
  • Space for temporary storage: topsoil and excavated soil need room, otherwise everything is transported twice.
  • Mark trees and shrubs: what is to stay is protected; what can go saves manual work.
  • Inform neighbours: especially for work at the boundary and with lorry traffic.
  • Collect old plans and photos: clues to earlier fills, cesspits, oil tanks.
  • Water and power connection: for wetting and equipment on site.
The point about old plans is the one that saves the most money. Viennese gardens regularly contain old cesspits, decommissioned oil tanks, foundations of demolished outbuildings and rubble fills from the post-war period. If you know about them, you can budget for them. If you find them while digging, you have a site that stands still until sampling and disposal are sorted out.

Special cases

CaseSpecial featureApproach
Old oil tank in the groundresidual contents, contaminated soilempty, clean and remove professionally, sample the soil
Cesspit or old soakawayvoid beneath the planned areaclear out, backfill and compact, document
Rubble fill from the post-war periodnot load-bearing, often contaminatedsoil replacement according to findings
Trees in the working arearoot zone is protectedprotective fence, hand work in the root zone
Archaeological findsduty to report, work must stopreport, wait for release
Wartime ordnancecannot be ruled out in Viennastop work immediately, notify the authorities
Pool or cisternuplift with high groundwateruplift protection, backfill as specified
Work next to an underground car parkexisting wall not designed for earth pressurestructural assessment before excavation

What the last three lines have in common is that they cannot be solved with more machine power, only by clarifying things beforehand. If wartime ordnance is suspected, this applies without any weighing up: stop work, secure the area, notify the authorities – anything else is not an option.

After the earthworks

StepWhat is included
Handing over the formationlevel surveyed, condition photographed, compaction proven
Finishing areastopsoil spread, falls checked, edges clean
Clearing the siteleftover material removed, access dismantled
Handing over documentsweighbridge tickets, test records, photo documentation
Monitoring settlementfor larger fills over a few months

The last point mainly concerns fills more than one metre high. Even material compacted cleanly in layers still settles slightly, and anyone who paves straight afterwards will be annoyed the spring after next. Where possible, a winter passes between filling and surfacing – the cheapest quality assurance there is in earthworks.

Winter work and season

ConditionImpactApproach
Continuous rainformation softens, cohesive soil unusablecover, gravel the haul roads, pause if necessary
Frost in the groundexcavation laborious, compaction impossiblenever place frozen material
Snow on sitegets placed with the material, voidsclear before backfilling
Heat and droughtmaterial too dry to compactwet it, work in layers
Open pit over winterfreeze-thaw cycles destabilise the slopecover, check the edge
Frozen material is never placed. When it thaws, voids form exactly where load will be later – the settlement follows months afterwards, when nobody is thinking about the winter work any more. The same applies to snow pushed in during backfilling. If backfilling cannot be done properly in winter, it is postponed and the pit stays open and secured.

The most common mistakes

  • Dug without utility information. A damaged cable costs the day, a gas pipe an evacuation – and the contractor pays for both.
  • Excavated soil not sampled. Without results the landfill classifies unfavourably; the difference runs into five figures.
  • Calculated in cubic metres instead of tonnes. One cubic metre weighs 1.6 to 2.0 tonnes and bulks by 15 to 35 percent when loosened.
  • Material stored at the edge of the pit. The surcharge makes exactly the slope it loads start to slide.
  • Working space tipped in one go. Settlement along the basement wall will certainly come, just later.
  • No perimeter ditch. Surface water softens the slope from above – the cause of most slides on small sites.
  • Ground shaped flat instead of with a fall. Water stands against the basement wall, and the correction is a separate job.
  • Topsoil mixed with subsoil. It is then worthless as topsoil and has to be bought in.
  • Compaction without proof. For load-bearing areas the test report is missing and acceptance fails.
  • Dug at the plot boundary without a condition survey. Cracks in the neighbour's house can then no longer be attributed.

Points one to three arise before the excavator's first bite, points four to nine during the work. Together they cost a few thousand euros to avoid and regularly ten times that if they happen.

How this differs from our other services

SituationMatching service
Cutting, filling and shaping terrainEarthworks, this page
Pit for basement or foundationExcavation
Sewer, drainage, utility trenchesCivil engineering
Laying and connecting utility linesPipeline construction
Retaining a slope permanentlyRetaining wall
Paving or asphalting areasPaving
Building a foundationFoundations
Recording the condition of neighbouring houses beforehandPre-construction survey

When you do not need us

For a few cubic metres of soil in the garden, a mini excavator hire with operator is often enough. A coordinating company pays off when volumes need balancing, material needs disposing of, areas need to be made load-bearing, or retaining walls, paving and drainage are to be built afterwards.

Basement excavation in the north and east of Vienna

North and east of the Danube, more houses have basements than in the dense city centre, because detached and terraced houses are built here on private plots. But the soil there is different from the west of the city, and that fundamentally changes the calculation for a basement pit.

Basement excavation in the 21st district (Floridsdorf, 1210)

Large parts of Floridsdorf lie on the gravel terraces of the Danube. Sandy gravel is easy to loosen with an excavator but does not stand well: the pit wall runs, the slope has to be flatter than in loamy soil, and that costs plot area. Towards Bisamberg and Stammersdorf the ground often becomes more loamy; there the wall holds better, but the formation turns soft in the rain. The closer the plot is to the Danube or the Old Danube, the more likely a basement excavation in 1210 will reach groundwater. For a typical detached house with a 180 m³ pit and good access, we estimate around €90 per cubic metre including removal and sampling, guide price net. If water stands in the pit, pumps and a watertight basement structure are added – we clarify this with a trial pit before the price is fixed. More about the pit itself under excavation for basements and foundations.

Basement excavation in the 22nd district (Donaustadt, 1220)

In Donaustadt the groundwater level is the first question, not the soil type. In parts of the district the water table lies only a few metres below ground and fluctuates with the level of the Danube. A basement excavation in 1220 therefore often means: dewatering during construction, a basement built as a watertight concrete structure instead of masonry walls, and a check whether the empty structure will be subject to uplift. If groundwater is lowered for the pit, a water-law permit may be required depending on the quantity, and the neighbouring houses should be documented beforehand, because drawdown can trigger settlement. Anyone building in Essling, Aspern or Breitenlee should therefore know the water level before the design: a basement set half a metre higher may save the entire dewatering. How the slab beneath is built is described on the floor slab page.

Planning excavation support: who calculates, who checks, who is liable

An excavation is not secured by the excavator operator but on paper. Anyone having excavation support planned in Vienna needs three things: the soil profile from a trial pit or borehole, the exact position of neighbouring foundations and the planned excavation depth including working space. From these, an authorised structural engineer – a chartered civil engineer (Ziviltechniker) or master builder – designs the support to Eurocode 7 (ÖNORM EN 1997). From a depth of 1.25 m, occupational safety rules require a slope or shoring anyway; the planning only decides which solution works in the available space. As general contractor we coordinate this planning with our partner firms, align it with the excavation sequence and include it as a separate item in the quote. In terms of timing it belongs before contract award: shoring that is only designed after construction starts delays excavation by weeks, because beams, laggings or sheet piles have to be ordered.

What an excavation support design contains

A usable excavation support design for Vienna covers more than a sketch with a slope angle. It includes the chosen type of shoring with justification, the load assumptions – neighbouring foundation, lorry traffic at the pit edge, crane position, material storage – and the permissible deformations, especially when an old building is directly adjacent. Added to this are excavation stages, the sequence of strutting or tieback anchoring and a monitoring programme that shows whether the wall or the neighbouring house is moving. If anchors extend beneath the neighbouring plot, the owner's written consent is required; without it, the only option is strutting within the pit. Finally, the design describes removal: what is pulled, what remains in the ground, and how the void is backfilled.

Type of shoringSuitable whenGuide value net
Soldier pile wall (Berlin-type shoring)no groundwater present, moderate space availableas designed
Sheet pile wallwater in the ground, soft layers, vibration acceptable€180–420/m²
Bored pile walldeep pit directly next to existing buildings€380–950/m²

In Viennese detached-house construction, the soldier pile wall is usually the most economical vertical solution: steel beams are drilled or driven at intervals, and timber laggings are slid in between as digging proceeds. But it is not watertight. Sheet pile walls cost more and cause vibrations when driven, which in densely built-up areas require a monitoring programme on the neighbouring house. For smaller digging work such as utility trenches, a trench box that moves along section by section is enough. Which option makes sense for you is only shown by the ground investigation – which is why for us it comes at the beginning and not as an add-on at the end. The construction of deeper pits is described on the civil engineering page.

Frequently asked questions about earthworks in Vienna

How much do earthworks cost per cubic metre?
Relocating on the plot €8 to €18/m³, fill with compaction €25 to €55/m³, soil replacement €45 to €95/m³. If soil has to be removed, transport and landfill at €22 to €45 per tonne are added – one cubic metre weighs around 1.8 tonnes.
What is a cut-and-fill balance?
The calculation of how much soil is cut and how much is filled. The aim is to use the material on the plot instead of hauling it away and buying in other material. It is the most important cost lever in any earthworks job.
What is the difference from excavation and grading?
Excavation is the pit for a basement, foundation or utility lines. Grading establishes the final level and bearing capacity of an area. Earthworks reshape the terrain. Often all three interlock. See excavation and grading.
Do I need a permit?
Changes to ground level may require notification or a permit under the Vienna Building Code, especially near the plot boundary or on a larger scale. We clarify this before starting. Outside Vienna, the respective state building code applies.
Why is the topsoil stripped separately?
The top layer of soil contains nutrients and soil life; the subsoil does not. If they are mixed, the garden grows poorly for years. That is why topsoil is stripped first, stored separately and spread back at the end.
How does fill become load-bearing?
Place it in layers of 20 to 30 cm and compact each layer with a roller or plate compactor. Under paths, terraces or walls with a plate load test as proof, €250 to €550 per test.
Can I use the excavated soil from my new build in the garden?
Often yes, and it saves a lot of money. The prerequisite is that the material is suitable and uncontaminated and that the change in ground level is permitted. Stony subsoil is suitable for fills but not as garden soil.
What happens to surplus soil?
It is hauled away and, depending on its composition, recycled or landfilled, with a weighbridge ticket. If contamination is suspected, it is sampled beforehand – contaminated material costs many times more at the landfill.
Can you work on tight plots?
Yes, with mini excavators and small dumpers that fit through narrow access ways. It takes longer because each load is smaller – which is why a good cut-and-fill balance pays off especially here.
What needs to be considered on a slope?
Cutting only with a safe slope, whose angle depends on the soil type. Larger changes in level need a retaining wall with drainage. See retaining wall.
Where does rainwater go after the change in ground level?
The new fall must lead away from the house and must not direct water towards the neighbour. With large sealed areas, channels or a soakaway are added.
What is the best time of year?
Spring to autumn when the soil is dry. Wet loam can hardly be compacted and is churned up by heavy machines. Backfilling is not done on frozen ground.
How long do earthworks take?
A garden with 100 to 200 m³ takes two to five working days, depending on access and weather. Larger landscaping projects one to three weeks.
What records do I receive?
Cut-and-fill balance, photo documentation, compaction records under paved areas, disposal records with weighbridge tickets and the acceptance record under ÖNORM B 2110.
How quickly is the price for the excavation fixed?
Within two working days after the site visit. For the cut-and-fill balance we need the ground levels; if there is no plan, we survey on site.
How much does a cubic metre of excavated soil cost to remove?
Uncontaminated excavated soil €22 to €45 per tonne, i.e. around €40 to €90 per cubic metre of bank volume. With foreign matter €45 to €85/t, contaminated €95 to €260/t.
Why do you calculate in tonnes instead of cubic metres?
Because the landfill bills by weighbridge ticket. One cubic metre of natural ground weighs around 1.6 to 2.0 tonnes. We show both in the quote so that the final invoice remains verifiable.
What does bulking mean?
Loosened soil takes up more space than in its natural state, 15 to 35 percent depending on soil type. That is why there are always more cubic metres on the lorry than in the plan.
Do I need a geotechnical report?
For basement excavations and foundations yes, €1,800 to €5,500. For landscaping in the garden, a trial pit for €450 to €1,200 is usually enough.
What happens if groundwater is encountered?
Then the method changes: dewatering, a tighter pit, uplift protection and condition surveys of neighbouring houses because of the drawdown. This is the largest single item and needs to be clarified before negotiating the price.
Does the excavated soil have to be sampled?
Not always mandatory, but almost always economical. €280 to €850 per sample decides the classification – with 320 tonnes, the difference between uncontaminated and contaminated amounts to around €17,000.
Can the excavated soil stay on the plot?
If it is compactable and uncontaminated, yes: cut-and-fill balancing costs €8 to €18 per cubic metre instead of removal and landfill. Cohesive soil is usually not suitable for this.
Which excavator will fit into my garden?
With a passage from about 1 m a mini excavator, from 2.5 m a midi excavator. What matters is daily output: mini excavator 20 to 45 m³, crawler excavator 150 to 400 m³.
Is it worth opening a fence panel?
Almost always. The difference between five days of mini excavator and one and a half days of crawler excavator clearly exceeds the cost of opening and restoring it.
How steep may the slope be?
That depends on the soil type and is set before excavation. If there is no space for a slope, shoring is needed – which is then not the more expensive option but the only one.
How much does a compaction test cost?
€250 to €550 per plate load test. For load-bearing areas it is the prerequisite for acceptance by the next trade.
Why is my paving next to the house sinking?
Usually the working space between the basement wall and the ground was tipped in one go instead of compacted in layers. The material settles over years, and new paving sinks again as long as the cause remains.
What fall does the ground next to the house need?
About 2 percent away from the house, i.e. two centimetres per metre. The plinth stays visible and is not buried, otherwise there will be moisture on the basement wall.
Can work be done in winter?
Excavating yes, placing only to a limited extent. Frozen material and snow are never placed, because voids remain when they thaw – the settlement then comes months later.
What if we come across an old oil tank or a cesspit?
Stop work at that spot, empty and clean professionally, sample the soil, clear out the void and backfill it with compaction. Old plans available in advance help to budget for this instead of discovering it.
May the shoring extend with anchors beneath the neighbouring plot?
Only with the neighbour's written consent. Anchors drilled beneath someone else's land interfere with their property, even if they are decommissioned after construction. Without consent the pit must be strutted from the inside, which costs space in the pit and slows down excavation. That is why we approach the neighbour early, ideally together with the condition survey of their house.
When must the excavation support design be finished?
Before the excavation contract is awarded. The design determines which equipment comes, which material is ordered and how long the pit stays open. Allow several weeks lead time for ground investigation, structural design and ordering. Anyone who plans only after construction starts pays for idle time for excavators and lorries and risks the pit remaining open and unsecured in the rain.
How much does a sheet pile wall for an excavation cost?
As a guide price net, €180 to €420 per square metre of wall area, including driving and extraction. The area is the perimeter times the embedment depth, not just the visible height – the piles reach well below the formation. For a small basement pit this quickly adds up to several hundred square metres. Vibration monitoring and condition surveys are added if neighbouring houses are close by.
Is a basement worthwhile on plots with high groundwater?
Sometimes, but rarely without compromise. A basement in groundwater needs a watertight concrete structure, dewatering during construction and often uplift protection. This can considerably increase basement costs. Often a shallower basement, a raised ground floor or a plant room above ground works out better. We compare these options based on the measured water level before planning.

Related services

◆ Partner company · Bling Premium Cleaning

Construction cleaning after the earthworks?

Construction and exterior cleaning after completion of the work is handled by our partner company Bling Bling Premium Cleaning. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quote free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Earthworks Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your earthworks in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and is not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted construction trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (Baumeister). Under § 99 (5) GewO, the title “Baumeister” is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master-builder services, structural engineering, gas and sanitary engineering, electrical engineering — are carried out exclusively by authorised, licensed partner companies.