Interior finishing Vienna: interior finishing in Vienna costs 350 to 900 euros per square metre. Drywall, screed, electrics, plumbing, floors and surfaces from a single source, coordinated by one site manager. Fixed price to ÖNORM B 2110, construction time 4 to 14 weeks.

Interior finishing in Vienna costs €350 to €900 per square metre. The simple fit-out of a bare shell with drywall, screed, electrics and surfaces starts at €350/m²; with bathroom, kitchen and a high-end specification it goes up to €900/m². An 80 m² flat therefore comes to €28,000 to €72,000 net. In old buildings, the available build-up height decides the floor construction: wet screed needs 10 to 14 cm and weighs 100 kg/m², dry screed 5 to 8 cm at 40 to 50 kg/m² – on timber beam ceilings often the only option.
✓ All trades, one site manager✓ Height calculation before planning✓ Fixed price ÖNORM B 2110✓ Photos before closing up✓ 3-year warranty

Interior finishing Vienna: costs 2026

Guide values net, as of 2026, binding after a site visit. The range results from the specification and the condition of the shell – not from the number of square metres.

ScopeWhat is includedNet priceConstruction time
Basic fit-outdrywall, screed, electrics, painting, floors€350–500/m²4–7 weeks
Standard fit-outplus bathroom, doors, underfloor heating€500–700/m²7–11 weeks
High-end fit-outplus kitchen, built-in furniture, decorative plaster finishes€700–900/m²10–14 weeks
Attic storeyplus insulation, vapour barrier, sloping ceilings€800–1,200/m²12–18 weeks
Commercial and medical practicefire protection, acoustics, increased requirements€600–1,100/m²8–16 weeks
Interior finishing Vienna: costs 2026 – net price overview
Interior finishing Vienna: the prices from the table at a glance, as of 2026, net.

Unit prices, so you can check a quote

ItemUnitNet priceWhat is included
Stud wall, double-boardedm²60–95 €profiles, insulation, two layers, Q2 filling
Lining wall on an existing wallm²35–70 €levelling crooked old-building walls, routing of services
Suspended ceilingm²50–90 €CD profiles, hangers, boarding, filling
Door frame with reinforcementpcs180–420 €UA profile, floor angle, installation
Interior door with framepcs480–1.200 €door leaf, frame, fittings, installation
Cement screed incl. insulationm²45–70 €edge strips, separating layer, screed, levelling
Self-levelling screedm²55–80 €ready for covering sooner, very level
Dry screed with fillm²60–95 €for timber beam ceilings, walkable the next day
Hot-water underfloor heatingm²70–140 €pipes, manifold, pressure test, heating-up record
New electrical installationm²65–130 €by a licensed electrical contractor
Plumbing rough-inlump sum2.800–5.200 €four fixtures, pre-wall, pressure test
Laying parquetm²28–55 €laying without material, fully bonded
Laying vinyl or laminatem²18–38 €preparing the substrate, laying, skirting
Laying tilesm²55–110 €Adhesive, laying, grouting, silicone
Painting, two coatsm²12–28 €filling, priming, painting
Skirting boardslin. m12–28 €cutting, fitting, mitring
Site management and coordination%included in the fixed priceone contact person, schedule, acceptance
Site, protection, disposallump sum1.800–4.500 €dust protection, container, certificate, final cleaning
Worked example · old-building flat 80 m², bare shell to ready for occupancy, without kitchen
Drywall, ceilings, doors€12,400
Screed, underfloor heating, floors€14,800
Electrics, plumbing, complete bathroom€19,600
Painting, site, disposal€6,900

Total around €53,700 net, which is €671/m². With kitchen and built-in furniture, €15,000 to €35,000 are added; without the bathroom it would be around €12,000 less.

The build-up height decides before anything is planned

In Viennese old buildings, the space between the structural slab and the finished floor is tight and rarely the same everywhere. This calculation comes at the start of every interior fit-out – not at the end.

Floor build-upHeightWeightSuitable for
Cement screed with insulation10–14 cmapprox. 100 kg/m²concrete ceilings, load-bearing substrates
Self-levelling screed with insulation8–12 cmapprox. 90 kg/m²most level surface, ready for covering sooner
Dry screed with fill5–8 cm40–50 kg/m²timber beam ceilings, tight height
Dry screed with underfloor heatingfrom 5 cm45–55 kg/m²old building with wish for heating
Levelling and floor covering only2–4 cm15–25 kg/m²if the height is otherwise insufficient
  • A timber beam ceiling carries 150 to 250 kg/m². The floor build-up is deducted from this before furniture and people are added. A wet screed already uses half of the reserve.
  • Check the door leaf height. If the floor becomes 12 cm higher, the door will no longer open. Old-building doors often have special heights and cannot be shortened at will.
  • Minimum room height 2.50 m for habitable rooms. With a suspended ceiling and a thick floor, this quickly becomes tight in basements and under the roof.
  • Thresholds to adjoining rooms. Bathroom, balcony and hallway often have different build-up heights – the transitions should be planned, not improvised.
  • The floor is never level. Gründerzeit ceilings have deviations of 2 to 5 cm. The levelling layer has to absorb this, and this levelling needs height.
The most expensive surprise in interior finishing is almost always the same: the floor build-up is higher than expected, the doors no longer fit, the underfloor heating does not fit in. That is why we measure before planning – structural slab, door heights, connections to adjoining rooms.

The trades and their sequence

Interior finishing is not a single trade but eight to twelve that interlock in a fixed sequence. Anyone who changes the sequence does the work twice.

1 · Strip-out and disposalEverything out that is not staying. Separated by type, because mixed construction waste costs four to eight times as much.
2 · Drywall framingErect the stud framework, set door reinforcements, install crossbars for later loads. Still open so that the installers can work.
3 · Electrical and plumbing rough-inPull cables, set boxes, build the pre-wall, pressure test with report. Via licensed partner firms.
4 · Photo documentationEvery line photographed with dimensions before closing up. So that nobody drills blindly later.
5 · Insulation and boardingMineral wool fitted tightly, boards with staggered joints, filling to the agreed quality level.
6 · ScreedWith edge insulation strips and separating layer. Then drying time – cement screed four to six weeks until ready for covering, dry screed the next day.
7 · Waterproofing in wet areasBonded waterproofing to ÖNORM B 3407 in bathroom and WC, two layers with sealing tapes. Photos before tiling.
8 · TilesFloor and wall, falls in the shower, movement joints at material changes.
9 · PaintingFilling, priming, two coats. Before the floor covering, so that nothing drips on it.
10 · FloorsParquet, vinyl or laminate, only after the screed has been measured as ready for covering. Laid too early means cupping and gaps.
11 · InstallationHanging doors, sanitary fixtures, switches and sockets, lights, skirting boards.
12 · AcceptanceJoint inspection, snagging list, acceptance report to ÖNORM B 2110, handover of documentation, final cleaning.

Six special features of interior finishing in Viennese old buildings

1. Nothing is straight

Gründerzeit walls deviate by 5 to 15 cm over three metres, floors slope towards the middle. A wall lining compensates for this but costs space: five centimetres on both sides means ten centimetres less room. We measure with a laser and tell you where levelling is worthwhile and where a wall should stay crooked.

2. Ceiling heights over three metres

3.20 to 4.00 m is normal. This means more wall area per square metre of floor, stronger profiles from CW 100 and scaffolding instead of ladders. For the same flat size, 30 to 50% more surface has to be worked than in a new building – the main reason why old buildings are more expensive.

3. Timber beam ceilings

They have limited load capacity and move with the seasons. This decides the floor build-up, bathtubs and whether a new partition may be placed centrally on a beam. For larger projects, we bring in a structural assessment via a licensed partner firm.

4. No as-built plans

In most old Viennese buildings, nobody knows where which line runs. That is why lines are located before chiselling and every line is photographed with dimensions after the rough-in. In ten years these photos will be worth more than any plan.

5. Box windows and reveals

Deep reveals, stone window sills, often crooked junctions. Anyone placing a wall lining against the external wall has to take the reveal into account – otherwise a thermal bridge forms there and mould appears in the inside corner in winter.

6. Site without storage space

Fourth floor without a lift, narrow lane, no courtyard. Material arrives just in time, rubble goes down the stairs or the chute, a parking lane requires a permit from MA 46. That is €600 to €1,800 for logistics alone – and the reason why deliveries are scheduled precisely.

Sound insulation: the point that cannot be fixed later

The decisive standard is ÖNORM B 8115. Within a flat, a double-boarded stud wall with insulation is sufficient, around 52 dB. Towards the neighbouring flat, considerably higher requirements apply – there you need a double stud wall or a solid solution.

  • Connection sealing tape under every profile. If it is missing, sound travels through the building structure and the wall never reaches its test value.
  • Sockets offset, never opposite each other on the same axis. Otherwise the wall becomes an intercom.
  • Impact sound on timber beam ceilings: floating screed with edge strips; for higher requirements, additional weighting and a decoupled suspended ceiling.
  • Waste water pipes encased and fixed with structure-borne sound decoupling – otherwise the whole building hears every flush.
  • Doors are the weak point of every well-insulated wall. A standard door has 27 dB, a soundproof door 32 to 42 dB.

The ten mistakes that cost the most in interior finishing

  • Heights not measured. The floor build-up becomes thicker than planned, doors no longer fit.
  • No crossbars for later loads. Kitchen wall cabinets, TV, washbasin – retrofitting the reinforcement costs €300 and three days instead of €30.
  • Floors before the electrics. The classic mix-up of sequence; both are done twice.
  • Screed covered too early. Without measuring the residual moisture, the parquet cups and the joints open.
  • No photo documentation before closing up. In five years someone drills into a line.
  • Connection sealing tape omitted to save money. 40 cents per linear metre, and half of the sound insulation is gone.
  • Door frame without UA profile. After a few weeks a crack runs diagonally from the upper corner of the door.
  • Lighting planned only after the ceiling. Recessed lights need suspension height – the ceiling has to be opened again.
  • Material ordered too late. If the door leaf is missing on installation day, the site stands still for three days.
  • Waterproofing in the bathroom left out. The most expensive mistake of all, because it only becomes visible at the neighbour's.

How to check an interior finishing offer

Are all trades listed individually?Drywall, screed, electrics, plumbing, tiles, painting, floors – each with quantities and unit prices. An overall lump sum cannot be checked.
Which floor build-up, which height?With thickness and weight. For timber beam ceilings, dry screed must be stated there or a structural approval must exist.
Which filling quality?Q2 is standard, Q3 for grazing light, Q4 for gloss paint. Without a specification you get Q2 and discuss it later.
Is the waterproofing in wet areas included?As a separate item with ÖNORM B 3407. If it is missing, the offer is not cheaper but incomplete.
Who does the electrics and plumbing?Regulated trades should be named, with proof of authorisation.
Who supplies the material?Floors, tiles, doors, sanitary fixtures – by the client or by the company. For 80 m², this makes a difference of €15,000 to €30,000.
Is disposal included?With quantities and certificate. For an 80 m² flat €1,200 to €3,000.
Is there a line "not included"?A fixed price without named exclusions is not a fixed price.

Who we fit out for

Private clients

Old-building flat from bare shell to moving in. One contract, one site manager, one date – instead of seven companies waiting for each other.

Developers

Interior fit-out of entire floors or buildings as a subcontract, on schedule, with our own site management and measurement to standard.

Landlords and investors

Flat between two tenancies or after vacancy. Documentation for the handover, short construction time, clear price.

Commercial premises and medical practices

Fire protection, acoustics, accessibility. On request in the evening and at weekends, so that business continues.

When you do not need us

If only the floor needs replacing and nothing else, call a floor layer – a coordinating construction company is one level too many for that. If the risers in the building are going to be renewed in the foreseeable future, wait: otherwise your newly fitted-out flat will be opened up again.

And if you have time and are good with your hands, painting at the end is the only part that makes sense to do yourself – everything before it interlocks too tightly. We tell you this at the site visit, even if it makes the job smaller for us.

Complete interior finishing: what the scope of work must include

Anyone commissioning a complete interior fit-out expects habitable rooms at the end and not a list of outstanding work. Whether this succeeds is decided in the bill of quantities. The trades should not just be named there but described with their interfaces: who connects the electrical box in the drywall, who sets the door frame before the screed comes, who does the silicone between tile and bathtub?

A complete fit-out usually includes rough-in for water, waste water, heating and electricity, partitions and wall linings, suspended ceilings if required, screed with impact sound insulation, tiles in bathroom and kitchen, interior doors, floor coverings, painting and the final installation with switches, sockets, taps and sanitary fixtures. Often forgotten are interior window sills, access panels, skirting boards, final cleaning and the documentation of the routing of services with photos before the walls are closed.

An offer is complete when you know for each item in which quality it will be carried out and what is expressly not included. If this demarcation is missing, extra costs arise not from botched work but from gaps that only become apparent on site.

Interior finishing in a house or in a flat: the main differences

In a detached house, the fit-out is usually part of a new build or a general renovation. The shell is standing, windows and roof are weathertight, and the trades can work in any order. There is space for material, noise bothers nobody except the clients. On the other hand, the areas are larger, the building services more extensive, and decisions on heating, ventilation and insulation have to be made earlier because they determine the entire build-up.

In a Viennese flat it is the other way round. The area is smaller, but every delivery goes through the staircase, containers need a permit for the street space, and quiet hours apply in an occupied building. Work on risers, load-bearing walls or shafts affects the other owners and requires their consent or that of the property management. In old buildings there is also the timber beam ceiling, which cannot always take the weight of a heavy floor build-up. These conditions cost time, and that is why fitting out a flat often costs more per square metre than a comparable fit-out in a house.

Interior finishing, interior renovation or drywall: what you are actually looking for

The three terms are often used interchangeably but describe different starting points. Interior finishing means turning a shell or a completely stripped room into finished rooms. All trades interlock and nothing existing is retained. Interior renovation, by contrast, starts from a flat in use: floors, walls, bathroom or electrics are renewed, parts of the existing fabric remain, and work is often done in sections.

Drywall is a single trade within both variants. Anyone who only needs a partition, a suspended ceiling or a wall lining will find the appropriate build-ups and square-metre prices on the page on drywall construction. If it is about an attic that first has to become habitable, loft conversion is the right starting point, because insulation, structure and permit come before the fit-out there. This page describes the case in between: rooms that are completed from scratch, with all trades in one hand.

Frequently asked questions about interior finishing in Vienna

What does interior finishing cost in Vienna?

That depends on the scope: a drywall partition costs 40 to 80 euros per square metre, screed with insulation 50 to 160, painting 15 to 35. A complete interior fit-out starts at about 400 euros per square metre. It becomes reliable after a site visit.

What does interior finishing include?

Everything that turns the shell into a habitable area: drywall partitions, screed and floor build-up, suspended ceilings, plastering, painting, interior doors and the surfaces. Regulated parts such as electrics and plumbing are handled by licensed partners.

In what order is the fit-out done?

First the electrical and plumbing rough-in, then the walls are closed, then comes the screed, then the floor, and painting last. This sequence prevents finished work from having to be torn open again. The schedule is the core of coordination.

Why is sound insulation so important in an apartment building?

Because the typical timber beam ceilings transmit sound. Without a decoupled floor build-up and sound-insulated walls, you hear every step of the neighbours. In Viennese old buildings, sound insulation is therefore the defining topic of interior finishing, not a detail on the side.

What is drywall construction?

Building walls, wall linings and suspended ceilings from stud framing and boards, without bricklaying. Fast, clean and flexible — ideal for reorganising rooms, hiding services or suspending ceilings. The basis of most interior fit-outs.

Can heavy screed be laid in an old building?

Not always. Old timber beam ceilings cannot carry any weight you like — a heavy cement screed can be too much. In that case a light dry screed is used. What the ceiling can carry is assessed in advance, before the floor build-up is planned.

Who does the electrical work in an interior fit-out?

A licensed electrical engineer under § 94 no. 16 GewO. Electrical installation is regulated and belongs to the authorised company. We coordinate them and align their work with the rest of the fit-out so that the cables are in place before the walls are closed.

What has to be considered regarding build-up heights?

Every layer — insulation, screed, floor covering, suspended ceiling — costs room height. In old buildings with tight and uneven heights, this has to be planned precisely so that doors fit and no trip edges arise. The connection heights belong in the measurement.

How long does an interior fit-out take?

That depends on the scope. A single flat takes a few weeks, with screed and plaster needing drying times that determine the schedule. A realistic schedule reflects these waiting times and the sequence of trades instead of ignoring them.

Can I live in the flat during the interior fit-out?

With individual rooms sometimes, with a complete fit-out usually not — there are phases with a lot of dust, without a floor or without working installations. We clarify this in the schedule in advance so that you can plan for it.

What is a suspended ceiling?

A ceiling construction of stud framing and boards below the actual ceiling. It hides services, improves sound and fire protection and allows recessed lights. In old buildings it also compensates for crooked or damaged ceilings. A versatile drywall element.

What has to be considered in wet rooms?

In bathroom and kitchen, walls and floors need waterproofing under tiles or covering, and the materials must be moisture-resistant. Here interior finishing works together with plumbing and tiling — a classic coordination point where care shows.

Do I have to think about fire protection in an interior fit-out?

Yes, especially in multi-occupancy buildings. Fire protection requirements apply to certain walls, ceilings and penetrations, which call for the right material and the right build-up. This is mandatory and must be carried out professionally, not skipped.

What is the difference between drywall and a masonry wall?

A drywall partition of stud framing and boards is light, fast and flexible, with good sound insulation if built correctly. A masonry wall is solid and heavier, better for heavy loads on the wall. For dividing rooms in a fit-out, drywall is usually the practical choice.

Can walls be moved later?

Yes, this is a core advantage of drywall — rooms can be reorganised without major intervention. Load-bearing walls, which must not be altered without structural analysis, and services have to be taken into account. What is load-bearing is clarified by the master-builder partner if required.

How is the floor built up?

Insulation and impact sound insulation go on the structural slab, the screed on top, then the covering. In old buildings, the weight decides whether wet or dry screed is possible. The build-up determines sound insulation, warmth and the final floor height.

Can an old building be fitted out in a modern way?

Yes, that is the norm in flat renovation. Modern floor plans, building services and surfaces can be brought into an old building as long as the fabric is respected — ceiling load capacity, room height, protected elements. This very combination is our experience.

Who lays the floor covering?

We do the screed and substrate; parquet and vinyl are laid by us or a floor layer, tiles by the licensed tiler under § 94 no. 38 GewO. We coordinate the trades so that the substrate fits and the transitions between coverings are right.

What does it cost to fit out a flat completely?

A complete interior fit-out starts at about 400 euros per square metre and rises considerably with the specification. The price depends on scope, material quality and the condition of the existing fabric. A bill of quantities after a site visit makes the costs traceable.

Is interior finishing the same as renovation?

Interior finishing is part of renovation — the fit-out of the interior. A renovation can also include façade, roof, building services and structure. When fitting out a shell or a stripped flat, interior finishing is the central block of work.

Can individual trades be commissioned?

Yes, individual services such as drywall or painting are also possible. The advantage of a single source is then lost, however. For regulated individual jobs such as a pure electrical installation, the specialist company directly is often the quicker option.

What is a wall lining?

A drywall layer placed in front of the existing wall. It improves sound and thermal insulation, hides services and compensates for crooked old-building walls. A common element in apartment buildings to bring old walls up to modern standards without demolishing them.

Does the screed have to dry before the floor goes down?

Yes, absolutely. If the covering is laid on screed that is too damp, moisture is trapped and the floor warps. The screed moisture is measured and only dry screed is covered. This waiting time belongs honestly in the schedule.

What does interior finishing cost per square metre?
€350 to €900 per square metre, depending on the specification. The simple fit-out of a bare shell with drywall, screed, electrics and surfaces starts at €350/m²; with bathroom, kitchen and a high-end specification it goes up to €900/m².
What does fitting out an 80 m² flat cost?
€28,000 to €72,000 net, depending on scope. If a new bathroom and kitchen are added, the amount is €55,000 to €90,000. Net, guide values 2026, binding after a site visit.
What does drywall cost in an interior fit-out?
Stud wall single-boarded €40–60/m², double-boarded with insulation €60–95/m², wall lining €35–70/m², suspended ceiling €50–90/m². Details at drywall construction Vienna.
What does the screed cost?
€45 to €80/m² including insulation and edge strips. Cement screed is the cheapest but needs four to six weeks until ready for covering. Self-levelling screed dries faster, dry screed is walkable the next day and often the only option for timber beam ceilings.
What does the electrical installation cost?
€65 to €130 per square metre of living space for a new installation, carried out by a licensed electrical engineer under § 94 no. 16 GewO. In old buildings with two-wire installation without a protective earth conductor, renewal up to the distribution board is mandatory.
How much build-up height does the floor need?
Wet screed with insulation 10 to 14 cm, dry screed 5 to 8 cm, dry screed with underfloor heating from 5 cm. In old buildings, the available height between the structural slab and the door leaf is often the decisive factor – it is measured before planning, not afterwards.
What does a timber beam ceiling carry?
Usually 150 to 250 kg/m² imposed load. A wet screed weighs around 100 kg/m², a dry build-up only 40 to 50. This decides the floor build-up – and must be checked before planning.
Can underfloor heating be installed in a period building?
Yes, even on timber beam ceilings: with a dry system and heat-conducting plates from 50 mm build-up height, €70 to €140/m². The prerequisite is a heat source with a low flow temperature – with an old gas boiler and 70 °C flow, the system does not work sensibly.
What room height has to remain?
In Vienna, habitable rooms need a clear height of at least 2.50 m. With suspended ceilings and a thick floor build-up, this quickly becomes tight in attics and basement rooms – which is why the height calculation comes at the start of all planning.
What is a service void?
A 4 to 6 cm deep layer in front of the vapour barrier or in front of the wall, in which cables and pipes run without piercing the sealing layer. On sloping ceilings it is mandatory, with wall linings practically always useful.
How are heavy items fixed to drywall?
With crossbars or timber noggins in the stud framework – then they carry 150 kg and more. Without reinforcement, the limit is about 40 kg with cavity anchors. Tell us during measurement where kitchen wall cabinets, the TV or the washbasin will go; the reinforcement then costs almost nothing.
What applies to doors in an interior fit-out?
Door leaf with frame €480 to €1,200 including installation, depending on the design. In drywall, the frame needs a UA profile for reinforcement, otherwise a crack forms above the lintel. Pocket sliding doors need a wall thickness of at least 10 to 12.5 cm and must be planned in before boarding.
What has to be considered for sound insulation between rooms?
Within a flat, a double-boarded wall with insulation is sufficient, around 52 dB. Towards the neighbouring flat, the requirements of ÖNORM B 8115 apply – there you need a double stud wall or a solid solution. Connection sealing tape and offset sockets are decisive.
What does an acoustic ceiling cost?
€95 to €160/m² with perforated boards and acoustic fleece. Useful in offices, medical practices and restaurants where reverberation is disturbing. The effect depends on the cavity and the insulation layer, not on the board alone.
How is the lighting planned?
Before the ceiling, not after. Recessed lights need 6 to 12 cm suspension height, light coves more. Anyone who closes the ceiling and then thinks about lights opens it up again.
Can I move walls again later?
With drywall partitions yes, with manageable effort: removal €15 to €35/m² including disposal, then rebuilding. This is one of the reasons why hardly any masonry is built in interior fit-outs any more.
What is different about interior finishing in an attic?
The vapour barrier is the critical point: airtight, every penetration with a collar. On top of that come sloping ceilings, knee walls and limited room height. Details at loft conversion Vienna.
Do I need a permit for interior finishing?
For non-load-bearing partitions and surfaces, usually not. A permit is required for interventions in the load-bearing structure, for changes affecting daylight or escape routes, and for changes of use. Application via a licensed partner firm.
How much dust is produced?
Most when chiselling and when sanding filled surfaces. We work with a dust protection wall, an airlock and extraction on the tool. In an occupied building, the staircase is covered and cleaned daily.
What happens if material does not arrive in time?
With material supplied by the client, the site stands still – tiles, doors and sanitary fixtures belong in the flat before work starts. With every offer we provide a material list with quantities and connection dimensions so that nothing is missing when buying.
What does disposal cost in an interior fit-out?
For an 80 m² flat €1,200 to €3,000, depending on quantity and separation. Construction rubble separated by type costs €18 to €35 per tonne, mixed construction waste €120 to €260. That is why waste is separated on site.
Can interior finishing be subsidised?
Not as an individual measure. As part of a subsidised renovation – base renovation via wohnfonds_wien, flat improvement by the City of Vienna or thermal measures – it is proportionately eligible. The application must be submitted and approved before construction starts.
What is often not included in the offer for a complete interior fit-out?
Often missing are interior window sills, access panels for services, skirting boards, final cleaning, container space and the photo documentation of the lines before the walls are closed. Sanitary fixtures and lights are not always included either. Have these points expressly confirmed as included or not included, then you can compare offers.
Is interior finishing cheaper in a house than in a flat?
Per square metre usually yes, because material is easier to deliver to a house, no quiet hours of other residents apply and the trades can work more freely. On the other hand, the area and building services are larger, so the total is higher. In a Viennese old-building flat, logistics, the timber beam ceiling and coordination with the property management push up the price per square metre.
When is it called interior finishing and when interior renovation?
Interior finishing is used when rooms are completed from the shell or after complete stripping. Interior renovation refers to renewing an existing, usually occupied flat, where parts are retained. The boundary is fluid, but it makes a difference for the offer and the schedule, because in existing buildings more unknowns lie behind plaster and floors.
Who coordinates the trades in an interior fit-out?
With us, coordination lies with a responsible site management that plans the sequence, dates and handovers between the trades. Regulated work such as electrics and gas is carried out by authorised partner firms; contractually, you still have one contact. This way there is no idle time when one trade is waiting for another.

Yes, absolutely. If the covering is laid on screed that is too damp, moisture is trapped and the floor warps. The screed moisture is measured and only dry screed is covered. This waiting time belongs honestly in the schedule.

Do I get a warranty on the interior fit-out?

Yes, the statutory warranty of 3 years under § 933 ABGB on the work carried out. Manufacturers give their own guarantees on individual products such as doors or floors. You receive the documents for this at handover.

Can I combine interior finishing and bathroom renovation?

Yes, that is the norm. The bathroom is part of the interior fit-out, where plumbing, tiles and electrics come together. Planned from a single source, the trades fit together and the sequence is right — instead of having to coordinate three companies yourself.

What is the most common expensive surprise in interior finishing?

The condition behind walls and under floors in old buildings — rotten beams, old pipes, unexpected moisture. Because we work with a fixed price after a site visit, we consult you before additional costs arise; extra charges only for additionally commissioned services.

Related services

◆ Partner company · Bling Premium Cleaning

Fitted out? We hand over ready for occupancy.

After the interior fit-out comes the final construction cleaning: floors, built-in units, windows, sanitary facilities. Bling Premium Cleaning takes care of this as a partner company, coordinated with the handover date. More at bling-bling.at.

Send enquiry

Enquire directly here — fixed-price quote free of charge. Skyline Bau replies within 2 working days.

Enquiry about: Interior finishing Vienna
Construction emergency? Water damage, mould, acute damage — please contact us directly via WhatsApp 24/7 — we will come promptly.

You and Skyline Bau will each receive a confirmation by email.

Ready for your interior finishing work in Vienna?

Write to us directly on WhatsApp — send photos. Reply within 2 working days.

Bling Bling GmbH · Skyline Bau brand · Company details in the legal notice

Note: Skyline Bau is the brand name of the construction and renovation division of Bling Bling GmbH and is not a separate legal entity. The sole contractual partner is Bling Bling GmbH. Bling Bling GmbH is a restricted construction trade business under § 99 GewO (Austrian Trade Regulation Act) and not a licensed master builder (Baumeister). Under § 99 (5) GewO, the title “Baumeister” is reserved for businesses licensed under § 94 no. 5 GewO. Regulated trades — master-builder services, structural engineering, gas and sanitary engineering, electrical engineering — are carried out exclusively by authorised, licensed partner companies.